# Red River Energy LLC ethanol plant, Rosholt, SD

Red River Energy LLC fuel ethanol plant, Rosholt, SD. 36 million gallons a year (2,348 b/d), #178 of 189 U.S. plants (EIA). 11 fuel terminals within 150 miles, 10 with ethanol handling on record; 10 other plants within 100 miles.

- Capacity: 36 million gallons/year (2,348 b/d), EIA As of January 1, 2026
- Rank: #178 of 189 U.S. fuel ethanol plants; 16 plants in SD
- Position: EIA ethanol plant layer (Jan 2023)

## Fuel terminals within 150 miles
- Magellan Pipeline Company (T-41-MN-3412), Alexandria, MN — 64.2 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-41-MN-3412/
- Nustar - Moorhead Terminal (T-41-MN-3400), Moorhead, MN — 68.4 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-41-MN-3400/
- Magellan Pipeline Company (T-45-ND-3501), West Fargo, ND — 69.8 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-45-ND-3501/
- Magellan Pipeline (T-46-SD-3555), Watertown, SD — 70.4 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3555/
- Nustar - Sauk Centre Terminal (T-41-MN-3401), Sauk Centre, MN — 84.7 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-41-MN-3401/
- Nustar Pipeline Operating Partnership, L.p. - Aberdeen (T-46-SD-3550), Aberdeen, SD — 89.9 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3550/
- Magellan Pipeline Company (T-41-MN-3414), Marshall, MN — 108.3 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-41-MN-3414/
- Nustar Pipeline Operating Partnership LP - Jamestown East Terminal (T-45-ND-3503), Jamestown, ND — 116.9 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-45-ND-3503/
- Nustar Pipeline - North Terminal (T-45-ND-3502), Jamestown, ND — 125.5 mi — https://thinkingonenergy.com/supply/terminal/T-45-ND-3502/
- Nustar Pipeline Operating Partnership, L.p. - Wolsey (T-46-SD-3556), Wolsey, SD — 133.6 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3556/
- Magellan Pipeline Company (T-45-ND-3500), Grand Forks, ND — 143.5 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-45-ND-3500/

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/ethanol/ethanol-red-river-energy-llc-rosholt-sd/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-10-01.
