# Redfield Energy LLC ethanol plant, Redfield, SD

Redfield Energy LLC fuel ethanol plant, Redfield, SD. 65 million gallons a year (4,240 b/d), #131 of 189 U.S. plants (EIA). 8 fuel terminals within 150 miles, 7 with ethanol handling on record; 8 other plants within 100 miles.

- Capacity: 65 million gallons/year (4,240 b/d), EIA As of January 1, 2026
- Rank: #131 of 189 U.S. fuel ethanol plants; 16 plants in SD
- Position: EIA ethanol plant layer (Jan 2023)

## Fuel terminals within 150 miles
- Nustar Pipeline Operating Partnership, L.p. - Wolsey (T-46-SD-3556), Wolsey, SD — 37.3 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3556/
- Nustar Pipeline Operating Partnership, L.p. - Aberdeen (T-46-SD-3550), Aberdeen, SD — 41 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3550/
- Magellan Pipeline (T-46-SD-3555), Watertown, SD — 69.2 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3555/
- Magellan Pipeline (T-46-SD-3554), Sioux Falls, SD — 126.9 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3554/
- Nustar Pipeline Operating Partnership, L.p. - Sioux Falls (T-46-SD-3553), Sioux Falls, SD — 130.5 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3553/
- Nustar Pipeline Operating Partnership LP - Jamestown East Terminal (T-45-ND-3503), Jamestown, ND — 134.9 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-45-ND-3503/
- Magellan Pipeline Company (T-41-MN-3414), Marshall, MN — 135.8 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-41-MN-3414/
- Nustar Pipeline - North Terminal (T-45-ND-3502), Jamestown, ND — 137.9 mi — https://thinkingonenergy.com/supply/terminal/T-45-ND-3502/

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/ethanol/ethanol-redfield-energy-llc-redfield-sd/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-09-30.
