# Valero Renewable Fuels LLC ethanol plant, Albert City, IA

Valero Renewable Fuels LLC fuel ethanol plant, Albert City, IA. 140 million gallons a year (9,132 b/d), #35 of 189 U.S. plants (EIA). 23 fuel terminals within 150 miles, 14 with ethanol handling on record; 33 other plants within 100 miles.

- Capacity: 140 million gallons/year (9,132 b/d), EIA As of January 1, 2026
- Rank: #35 of 189 U.S. fuel ethanol plants; 42 plants in IA
- Position: EIA ethanol plant layer (Jan 2023)

## Fuel terminals within 150 miles
- Nustar Energy Milford Terminal (T-42-IA-3466), Milford, IA — 39.6 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-42-IA-3466/
- Magellan Pipeline Company, L.P. (T-42-IA-3467), Milford, IA — 42.9 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-42-IA-3467/
- Jackson -Ngl (T-41-MN-3427), Jackson, MN — 57.1 mi — https://thinkingonenergy.com/supply/terminal/T-41-MN-3427/
- Growmark, (T-42-IA-3461), Duncombe, IA — 61 mi — https://thinkingonenergy.com/supply/terminal/T-42-IA-3461/
- NuStar Pipeline Operating Partnership L.P. - Le Mars, IA (T-42-IA-3464), Le Mars, IA — 69.5 mi — https://thinkingonenergy.com/supply/terminal/T-42-IA-3464/
- Magellan Pipeline Company (T-42-IA-3473), Sioux City, IA — 73.8 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-42-IA-3473/
- Nustar Energy Rock Rapids Terminal (T-42-IA-3472), Rock Rapids, IA — 77.6 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-42-IA-3472/
- Magellan Pipeline Company - Mason City (T-42-IA-3465), Clear Lake, IA — 84.1 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-42-IA-3465/
- Buckeye Terminals, LLC - Des Moines Terminal (T-42-IA-3456), Des Moines, IA — 102 mi — https://thinkingonenergy.com/supply/terminal/T-42-IA-3456/
- Nustar Pipeline Operating Partnership, L.p. - Sioux Falls (T-46-SD-3553), Sioux Falls, SD — 104 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3553/
- Magellan Pipeline Company (T-41-MN-3413), Mankato, MN — 104.7 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-41-MN-3413/
- Magellan Pipeline (T-46-SD-3554), Sioux Falls, SD — 107.4 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-46-SD-3554/
- Phillips 66 Pipe Line (Conocophillips) - Pleasant Hill (T-42-IA-3470), Pleasant Hill, IA — 110.5 mi — https://thinkingonenergy.com/supply/terminal/T-42-IA-3470/
- Des Moines (T-42-IA-3457), Des Moines, IA — 110.7 mi — https://thinkingonenergy.com/supply/terminal/T-42-IA-3457/
- Magellan Pipeline Company - Omaha Terminal (T-47-NE-3608), Omaha, NE — 115.2 mi, ethanol per operator — https://thinkingonenergy.com/supply/terminal/T-47-NE-3608/

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/ethanol/ethanol-valero-renewable-fuels-llc-albert-city-ia/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-10-02.
