# NuStar 8" Amarillo Products Pipeline

NuStar 8" Amarillo Products Pipeline refined-products pipeline. 1 published FERC tariff routes with line-haul rates, 3 origin and delivery points, 1 terminals and 1 refineries linked. Rate matrix, fees, and every rate cited to its tariff and item.

- Published routes: 1; points: 3 (2 origins); terminals linked: 1; refineries linked: 1

## Origin points
- McKee Station / McKee-DS / McKee-DSCOLO Station (Valero McKee refinery), Moore County
- Sheerin Station, Moore County

## Sample of published rates (lowest 30)
| Origin | Delivery point | ¢/bbl | Tariff |
|---|---|---|---|
| Sheerin Station, Moore County | Amarillo Station, Potter County, TX | 41.68 | Texas No. 99.10.0 Note 1 |

Full rate matrix, fees and CSV downloads on the page.

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/pipeline/nustar-8-inch-amarillo-products/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-10-06.
