# CVR Coffeyville Refinery

CVR Coffeyville Refinery, Coffeyville, KS. 132,000 bpd crude capacity (EIA-820). Injects into Enterprise / TEPPCO and Magellan Midstream; reaches 4 delivery points and 12 terminals by published tariff. Crude supply, outlets, events.

- Location: Coffeyville, KS
- Status: active
- Crude capacity: 132,000 bpd (EIA-820)
- Operator: Coffeyville Resources Refining & Marketing, LLC
- Parent: CVR Energy, Inc. (majority-owned by Icahn Enterprises L.P., which held roughly 66% in late 2024 and increased its stake toward ~71-84% through 2025-2026 tender offers and open-market purchases)

## Pipelines it injects into
- Enterprise / TEPPCO at Coffeyville (Montgomery Co., KS) (confirmed) — https://thinkingonenergy.com/supply/pipeline/enterprise-teppco/
- Magellan Midstream at Kansas (Coffeyville) (confirmed) — https://thinkingonenergy.com/supply/pipeline/magellan-midstream/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Enterprise / TEPPCO | 4 | 30 | 558.09 | 558.09 |

## Crude supply
- pipeline: CVR Coffeyville-Cushing crude pipeline — CVR operates a dedicated ~110,000 bpd crude pipeline from Cushing (~100 miles away) to Coffeyville, plus a 145,000 bpd system moving crude from its Broome Station tank farm to the refinery; CVR owns roughly 6% of Cushing's total crude storage capacity. This is CVR's own named 'Coffeyville' pipeline, not a segment of the Keystone Pipeline.

## Product outlets
- pipeline: Magellan Midstream — Magellan operates an 8-inch refined-products pipeline from Coffeyville to Kansas City, KS, carrying up to 30,000 bpd; described as one of three pipelines carrying the refinery's products to market (the other two not identified within research budget).
- truck_rack: Coffeyville Resources Coffeyville Refinery — Refinery-direct truck rack; consistent with CVR's own description of the site distributing clean transportation products locally.

## Recent events
- 2025-01-21 — Fire broke out at the naphtha hydrotreater during Winter Storm Enzo (sub-zero temperatures); extinguished same day.
- 2025-01 — Planned Q1 2025 turnaround (crude unit, FCC and associated units) began days after the fire; extended 10-15 days per CEO comments, targeted for end-of-March completion, nearly complete by April 2025.

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/refinery/coffeyville-resources-rfg-mktg-coffeyville-ks/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-09-29.