# Marathon Garyville Refinery

Marathon Garyville Refinery, Garyville, LA. 617,000 bpd crude capacity (EIA-820). Injects into Bengal Pipeline, Marathon Pipe Line (MPLX) and Plantation Pipeline; reaches 59 delivery points and 128 terminals by published tariff. Crude supply, outlets, events.

- Location: Garyville, LA
- Status: active
- Crude capacity: 617,000 bpd (EIA-820)
- Operator: Marathon Petroleum Company LP
- Parent: Marathon Petroleum Corporation

## Pipelines it injects into
- Bengal Pipeline at Garyville (Saint John the Baptist Parish) (same city) — https://thinkingonenergy.com/supply/pipeline/bengal-pipeline/
- Marathon Pipe Line (MPLX) at Garyville (St. John the Baptist Parish), LA (same city) — https://thinkingonenergy.com/supply/pipeline/marathon-pipe-line-mplx/
- Plantation Pipeline at Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) (confirmed) — https://thinkingonenergy.com/supply/pipeline/plantation-pipeline/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Plantation Pipeline | 29 | 147 | 114.65 | 251.61 |
| Marathon Pipe Line (MPLX) | 28 | 11 | 91.04 | 255.35 |
| Bengal Pipeline | 2 | 0 | 69.98 | 69.98 |

## Crude supply
- marine: Louisiana Offshore Oil Port (LOOP) — Reference site states crude is 'supplied via the Louisiana Offshore Oil Port (LOOP)', primarily heavy sour crude oils.
- pipeline: Capline Pipeline — Capline reversed to full southbound service Jan 1, 2022; the pipeline operator (Marathon Pipe Line, a Marathon affiliate) explicitly names Garyville as a served destination for the reversed, southbound Canadian/Bakken crude.
- pipeline: LOCAP Pipeline — Consistent with the LOOP crude-supply finding above; LOCAP is the documented onward pipeline link from LOOP's onshore terminal to Mississippi River corridor refineries, though this specific refinery tie-in was not separately re-confirmed this session beyond the general LOOP reference.

## Product outlets
- pipeline: Bengal Oil Products Pipeline / Colonial Pipeline — Reference site states the refinery 'is connected to the Bengal Oil Products Pipeline' and 'products can be shipped via the Colonial Oil Products Pipeline' -- consistent with the Bengal JV (Colonial/Shell Midstream) linking southern Louisiana refineries to Colonial's Baton Rouge origin.
- pipeline: Plantation Pipeline — Plantation Pipeline's documented origin point is Baton Rouge specifically (not Garyville); no source reviewed confirms a direct Garyville injection point onto Plantation. Treat as unconfirmed.
- pipeline: Centennial Pipeline — Centennial's Louisiana segment runs Beaumont, TX to Longville, LA (western/central LA) and north to Illinois -- it does not pass through or originate at Garyville (St. John the Baptist Parish, on the river between New Orleans and Baton Rouge). No source ties Garyville product to Centennial.
- truck_rack: Garyville MPC Asphalt Terminal — Company-named on-site asphalt terminal -- direct company asset.
- marine: Marathon Petroleum Company LLC - Terminal Transport and Marine Division — Company-named marine/barge division -- direct company asset, consistent with the refinery's Mississippi River frontage.

## Recent events
- 2024-09 — Regulators (state/EPA) reported 20 alleged safety-related breakdowns at Garyville following the 2023 tank fires.
- 2023-08-25 — Major naphtha/diesel storage-tank fire (two tanks, one holding 150,000 bbl sour naphtha, spread to an adjacent 300,000 bbl diesel tank); units shut, 2-mile evacuation ordered then lifted; restart began Aug 28. Described by Marathon as the third blaze at the plant in less than a year.
- 2022-02-21 — Fire/explosion at the refinery, extinguished same day; five contract workers injured.
- 2021-08-29 — Sustained damage in Hurricane Ida; shut in ahead of landfall, ran on generators during repairs, restarted by Sept. 10, 2021.

---