# PBF Toledo Refinery

PBF Toledo Refinery, Toledo, OH. 150,800 bpd crude capacity (EIA-820). Injects into Buckeye Pipeline and Sunoco / Energy Transfer; reaches 54 delivery points and 74 terminals by published tariff. Crude supply, outlets, events.

- Location: Toledo, OH
- Status: active
- Crude capacity: 150,800 bpd (EIA-820)
- Operator: Toledo Refining Company LLC
- Parent: PBF Energy Inc. (via PBF Holding Company LLC)

## Pipelines it injects into
- Buckeye Pipeline at Toledo (research) — https://thinkingonenergy.com/supply/pipeline/buckeye-pipeline/
- Sunoco / Energy Transfer at Toledo (research) — https://thinkingonenergy.com/supply/pipeline/sunoco-energy-transfer/

## Tariff origin points in the same city (not confirmed as its injection points)
- Inland Corporation at Toledo (incl. Cedar Point) (same city) — https://thinkingonenergy.com/supply/pipeline/inland-corporation/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Buckeye Pipeline | 25 | 46 | 37.92 | 258.13 |
| Sunoco / Energy Transfer | 20 | 24 | 77.93 | 291.36 |
| Inland Corporation | 9 | 12 | 14.70 | 163.99 |

## Crude supply
- pipeline: Marysville Pipeline — PBF's 10-K for fiscal 2025 says the refinery sources crude and feedstock through connections to the Marysville Pipeline and the Maumee Pipeline.
- pipeline: Maumee Pipeline — PBF's 10-K for fiscal 2025 names the Maumee Pipeline as one of the refinery's two crude connections. The filing does not name the line's owner or say which crude route arrives over it.
- pipeline: Enbridge — PBF's 10-K for fiscal 2025 lists Enbridge from the north as one of three primary pipelines delivering crude to the refinery. The filing does not name the Enbridge line.
- pipeline: Pipeline from Patoka — PBF's 10-K for fiscal 2025 lists Patoka from the west as one of three primary pipelines delivering crude to the refinery. The carrying pipeline is not named.
- pipeline: Mid-Valley Pipeline — PBF's 10-K for fiscal 2025 lists Mid-Valley from the south as one of three primary pipelines delivering crude to the refinery.
- truck: Crude truck unloading facility — PBF's 10-K for fiscal 2025 says crude from local sources is delivered by truck to a truck unloading facility within the refinery.
- rail: Crude by rail to a nearby terminal — PBF's 10-K for fiscal 2025 says crude is also delivered by rail to a nearby terminal, not to the plant itself. The terminal and the railroad are not named.

## Product outlets
- truck_rack: Toledo Tank Farm truck loading facility — SEC filings describe a truck loading facility and propane storage/loading bullets at the Toledo Tank Farm adjoining the refinery.
- truck_rack: PBF Logistics Products Terminals LLC truck rack (IRS T-34-OH-3161) — The IRS terminal list carries T-34-OH-3161 under PBF Logistics Products Terminals LLC at 1601 Woodvalle Road, Toledo, OH 43605 (the IRS spelling). The list does not give the products loaded.
- rail: Toledo Rail Products Facility — A rail loading and unloading facility at the refinery, transferred to PBF Logistics LP in a 2018 contribution transaction. PBF's 10-K for fiscal 2025 says most of the refinery's petrochemicals (benzene, toluene, xylene, nonene and tetramer) are distributed by rail. The railroad is not named.
- pipeline: Buckeye Pipeline — PBF's 10-K for fiscal 2025 says the refinery's finished products are transported on pipelines owned by Buckeye Partners L.P. Buckeye's directory of connecting facilities, effective November 2024, lists PBF under Toledo.
- pipeline: Sunoco Pipeline — PBF's 10-K for fiscal 2025 says the refinery's finished products are transported on pipelines owned by Sunoco Logistics Partners L.P., the name the filing uses. The filing also says the refinery has proprietary connections to smaller pipelines and spurs, which it does not name.

## Recent events
- 2026-07 — PBF deferred the planned Q4 2026 Toledo turnaround to 2027: 'after further diligent review, we elected to move the planned fourth quarter turnarounds at both Chalmette and Toledo to 2027.'
- 2026-02-05 — WTOL: 'Steelworkers rally outside Toledo Refining Company as contract deadline nears' (Feb 5, 2026), followed by 'Negotiations continue between steelworkers and Toledo Refining Company' (Feb 7, 2026). This was a USW local contract negotiation, and no strike or lockout was reported in the items seen. Headlines only, seen in a Google News RSS listing.
- 2026-01-06 — PBF 2026 guidance: a 50-60 day Q4 2026 turnaround planned at the 180,000 b/d Toledo refinery, involving the FCC unit; Toledo expected to average 135,000-145,000 b/d in 2026.
- 2026 — PBF: 'During the second quarter, we performed unplanned work at Toledo which afforded us the opportunity to safely extend the run-time for our FCC complex.' Q2 2026 Toledo throughput was 132.1 kb/d vs 165.6 kb/d in Q2 2025.
- 2023-10-31 — WTVG: 'Toledo Refining Company warns of possible harmless odor during project work'. This was planned project or maintenance work in late Oct 2023. Headline only, seen in a Google News RSS listing.

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/refinery/toledo-refining-co-llc-toledo-oh/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-10-19.