# CVR Wynnewood Refinery

CVR Wynnewood Refinery, Wynnewood, OK. 74,500 bpd crude capacity (EIA-820). Injects into Enterprise / TEPPCO and Magellan Midstream; reaches 77 delivery points and 101 terminals by published tariff. Crude supply, outlets, events.

- Location: Wynnewood, OK
- Status: active
- Crude capacity: 74,500 bpd (EIA-820)
- Operator: Wynnewood Refining Company, LLC
- Parent: CVR Energy, Inc. (majority-owned by Icahn Enterprises L.P., which held roughly 66% in late 2024 and increased its stake toward ~71-84% through 2025-2026 tender offers and open-market purchases)

## Pipelines it injects into
- Enterprise / TEPPCO at Wynnewood (Garvin Co., OK) (confirmed) — https://thinkingonenergy.com/supply/pipeline/enterprise-teppco/
- Magellan Midstream at Wynnewood, OK / Ardmore, OK (Valero Partners Wynnewood) (confirmed) — https://thinkingonenergy.com/supply/pipeline/magellan-midstream/
- Magellan Midstream at Wynnewood, OK (confirmed) — https://thinkingonenergy.com/supply/pipeline/magellan-midstream/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Magellan Midstream | 73 | 120 | 187.37 | 508.89 |
| Enterprise / TEPPCO | 4 | 30 | 542.46 | 542.46 |

## Crude supply
- pipeline: Velocity Central Oklahoma Pipeline (SCOOP crude line) — Velocity Central Oklahoma Pipeline LLC (a Velocity Midstream subsidiary) built a dedicated crude pipeline and terminal linking the SCOOP fairway directly to the Wynnewood refinery; CVR Refining holds a 40% stake in the resulting Velocity Pipeline Partners, LLC joint venture.

## Product outlets
- pipeline: Magellan Midstream — Remaining product volumes (after primary trucking/rail/pipeline distribution to Oklahoma, Arkansas, and eastern Missouri) move via Magellan to the broader Mid-Continent region.
- truck_rack: CVR Energy — Refinery-direct truck rack; self-evident for an operating refinery of this scale under CVR's own operation.
- pipeline: Magellan Midstream Partners LP — Consistent with the Magellan pipeline connection above; likely the same physical interconnect represented as a terminal node.

## Recent events
- 2024-04-28 — Fire broke out during severe weather in the naphtha-processing area, damaging pipe racks and pumps and injuring two workers; damage was limited and normal operations were expected by end of Q2 2024.
- 2023-09 — Explosion at the Wynnewood refinery killed one employee and injured another; cause was under investigation.

---
Source: Thinking On Energy Supply Explorer — https://thinkingonenergy.com/supply/refinery/wynnewood-refining-co-wynnewood-ok/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Thinking On Energy, Supply Explorer, 2026-09-29.