Supply Explorer
Pipeline system

Central Florida Pipeline

Central Florida Pipeline LLC (Kinder Morgan)

gasoline distillate jet fuel other
tariff points
3
origins
1
origin refineries
0
terminals served · 1 confirmed
1
published routes
0

Rates

Rates for this system haven’t been transcribed yet. Its tariffs are listed under Tariffs.

Lines in this system

Each line as the operator publishes it — Kinder Morgan, retrieved 2026-09-28. Capacity is the operator's figure; on joint-venture lines it is the operator's share where stated.
Line From To Length Diameter Capacity Products
Central Florida Pipeline — 16 inch Tampa (Port Tampa Bay) Orlando (Taft terminal) 110 miles 16 inch — Gasoline ULSD Denatured ethanol
Central Florida Pipeline — 10 inch Tampa Orlando International Airport (sole pipeline jet supply) 85 miles 10 inch — Jet fuel

Source: Kinder Morgan products operations page, kindermorgan.com/Operations/Products.

Tariff points

Origins and delivery points named in the tariffs, with the terminals linked to each.
PointTypeLocationProductsTerminals
Port Tampa Bay terminals (5), including the KMLT Tampa terminal at Hooker's Point origin Tampa, FL 0
ASIG Terminal at Orlando International Airport destination Orlando, FL jet fuel 1
Central Florida Pipeline Terminal (CFPL Taft), Orlando destination Orlando, FL gasoline distillate other 1

Products & grades

gasoline

  • gasoline (grades not published)

distillate

  • ULSD

jet fuel

  • jet fuel (Jet A)

other

  • denatured fuel ethanol (batched)

Tariffs

2 tariffs on file — every rate and point on this page cites one of them.
TariffTypeTitleEffective
FERC Opinion No. 567 (169 FERC 61,119), Docket OR16-26-000 other Aircraft Service International Group et al. v. Central Florida Pipeline LLC and KMLT - Order on Initial Decision (jurisdiction) 2019-11-21 PDF
Kinder Morgan Products page other Kinder Morgan Products Pipelines overview - Central Florida Pipeline (CFPL) section PDF

Fees & terms

Status & ownership

Status
Per the Kinder Morgan Products page: a 110-mile, 16-inch line carrying gasoline, ULSD and batched denatured ethanol, and an 85-mile, 10-inch line carrying jet fuel, from five Port Tampa Bay terminals to Orlando. The 10-inch line is the sole pipeline supply of jet fuel to Orlando International Airport. FERC Opinion No. 567 (2019) says the line also batches diesel. An older KM 10-K describes an intermediate delivery at Intercession City. The line has been shut briefly for hurricanes (Ian 2022, Milton 2024).
Ownership
Central Florida Pipeline LLC and Kinder Morgan Liquids Terminals LLC (KMLT, owner of the Tampa origin terminal) are both wholly owned by Kinder Morgan, Inc. (FERC Opinion No. 567, 2019).
Intrastate
FERC Opinion No. 567 (2019-11-21) upheld the ALJ ruling that jet fuel moved on CFPL from Hooker's Point, Tampa to Orlando is intrastate and outside FERC jurisdiction under the ICA. As a result there is no FERC tariff, and none appears among Kinder Morgan's posted tariffs. No Florida PSC petroleum-pipeline tariff was found; Florida does not appear to regulate refined-products pipeline rates.
Research
MEDIUM confidence

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.