Ergon Refining Vicksburg Refinery
Ergon Refining Inc. (ERI) · Ergon, Inc. · Vicksburg, MS
- bpd crude capacity · EIA 2026
- 26,500
- pipelines it injects into
- 0
- delivery points reachable
- 0
- terminals on those points
- 0
- terminals reachable by barge
- 25
- events on record
- 14
Capability
Crude distillation 26,500 bpd operable, 26,500 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Upgrading
| Vacuum distillation | 18,000 sd |
Treating — meets sulfur specs
| Hydrotreating — diesel | 2,500 sd |
Production capacity · barrels per stream day
Crude slate
Imported heavy, low-sulfur crude. EIA import records for 2024 to 2026 show United Kingdom crude of about 15 to 20 API and about 0.75% sulfur, and Angola crude of about 19 to 23 API. Any domestic share is not established.
Base oils
Operator page states 'production capacity of up to 26,500 barrels per day of severely hydrotreated naphthenic specialty products' (naphthenic base and process oils), with ULSD, naphtha, heavy fuel oil, asphalt blending stocks and waxes also offered; Ergon calls itself 'the world's leading producer of specialty naphthenic oils' (March 25, 2025 release). A $400 million gasoline expansion (nearly 6,000 b/d gasoline, +20% crude distillation) is due online Q1 2027; the operator release does not say whether naphthenic base oil output changes. Planned six-week maintenance began 2025-09-01 with no supply interruption expected. Classification: naphthenic base oils are API Group V under API 1509 (their VI sits below the 80 floor Groups I–III require, even where hydrotreating meets Group II sulfur and saturates limits); market tallies that file them with Group I are a convention. Recorded here as Group V naphthenic. The $400 million project cost comes from trade and local press (OGJ, WJTV), not Ergon's release.
| API group | b/d | As published | Basis | In effect | Source |
|---|---|---|---|---|---|
| Group V naphthenic | 26,500 | 26,500 b/d Operator statement: 'ERI has production capacity of up to 26,500 barrels per day of severely hydrotreated naphthenic specialty products.' Oil & Gas Journal (Mar 26, 2025) ties the same figure to crude distillation: the 2027 project raises 'the refinery's crude distillation capacity by 20% from its existing 26,500-b/d capacity', so 26,500 b/d is the plant's throughput, every barrel of which is hydrotreated naphthenic crude. Naphthenic base and process oils (HyGold, HyPrene, HyVolt) are the main products, but ULSD, naphtha, heavy fuel oil, asphalt blending stocks and waxes come from the same barrels, so the base oil share is lower and unpublished. Recorded as the operator's stated upper bound; EIA-820's 23,000 b/sd lubricants figure is the cross-check. |
company stated | — | Ergon, Inc. high |
- Process route
- Naphthenic hydrotreating
- Feedstock
- Naphthenic crude
- Brands
- HyGold, HyPrene, HyVolt, HyPrint
- Owners
- Ergon, Inc. 100%
Grades offered
| Group | Grade | cSt @100 °C | Brand | Source |
|---|---|---|---|---|
| Group V naphthenic | HyGold naphthenic base oils, viscosity range 40 SUS to 4,900 SUS (blending capability) | — | HyGold | Ergon high |
| Group V naphthenic | HyPrene naphthenic process oils, viscosity range 40 SUS to 4,900 SUS | — | HyPrene | Ergon high |
| Group V naphthenic | HyVolt naphthenic insulating oils meeting IEC 60296 ed.5 (2020) and ASTM D3487-2016 | — | HyVolt | Ergon high |
Base oil events and projects
-
2026-04-10
Posted price change
Group V naphthenic
Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by a further $0.55 per gallon effective 2026-04-10, again citing Middle East developments. announced 2026-04-07 · actual 2026-04-10 Ergon high
-
2026-03-27
Posted price change
Group V naphthenic
Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by $0.35 per gallon effective 2026-03-27, citing developments in the Middle East. announced 2026-03-24 · actual 2026-03-27 Ergon high
-
2025-09-01
Turnaround
Group V naphthenic
Ergon announced planned fall maintenance at the Vicksburg naphthenic refinery starting 2025-09-01, with various operating units down for approximately six weeks for reliability improvements; inventories sufficient and no supply interruptions expected for ratable customers. No completion notice was found. announced 2025-06-02 · public target 2025-10 Ergon high
-
2025-05-09
Posted price change
Group V naphthenic
Ergon decreased North American prices for HyVolt dielectric fluids, HyGold base oils and HyPrene process oils by $0.20 per gallon effective 2025-05-09. announced 2025-05-06 · actual 2025-05-09 Ergon high
-
2025-03-26
Other
vicksburg-gasoline-expansion-2027
OGJ reported the proposed $400 million project at ERI's 26,500-b/d specialty naphthenic base oil refinery: +20% crude distillation, +6,000 b/d gasoline, a combined heat and power plant and a pipeline to the Vicksburg fuels terminal; completion first-quarter 2027. announced 2025-03-25 · public target 2027-03 Oil & Gas Journal medium
-
2025-03-25
Expansion
vicksburg-gasoline-expansion-2027
ERI announced plans to expand processing capabilities at Vicksburg to include gasoline production (nearly 6,000 b/d) with crude distillation capacity rising 20%, expected online in the first quarter of 2027; includes pipeline infrastructure to the adjacent fuels terminal Ergon bought in August 2023. No change to naphthenic base oil capacity is stated. Target recorded as 2027-03 for 'first quarter 2027'. announced 2025-03-25 · public target 2027-03 Ergon high
-
2021-10-23
Turnaround
Group V naphthenic
Scheduled fall maintenance at the Vicksburg naphthenic refinery began 2021-10-23; Ergon announced completion 2021-11-16 with reliability improvements made, all units running and no supply interruptions. Inventories were raised beforehand. actual 2021-11-16 Ergon high
-
2021-08-30
Other
Group V naphthenic
Ergon stated its Vicksburg naphthenic refinery on the Mississippi River was not impacted by Hurricane Ida, was fully operational, and customers should not expect supply chain disruptions. announced 2021-08-30 · actual 2021-08-30 Ergon high
-
2020-04-20
Turnaround
Group V naphthenic
Scheduled turnaround at the Vicksburg naphthenic refinery completed; last unit returned to service 2020-04-20 after the schedule was extended for COVID-19 precautions. Ergon reported no supply interruptions. actual 2020-04-20 Ergon high
Not established from public sources: The 26,500 b/d capacity row is the operator's figure for 'severely hydrotreated naphthenic specialty products' as a whole, and OGJ (Mar 26, 2025) identifies the same 26,500 b/d as the refinery's crude distillation capacity, so it is throughput rather than naphthenic oil output; no public source gives the base oil (or base-plus-process oil) share. OGJ also notes a $150 million upgrading project launched in late 2014 for low-aromatic products (OGJ Online, Oct 14, 2014; not opened, so not recorded as an event). EIA-820's 23,000 b/sd lubricants figure is the cross-check. Feedstock 'naphthenic_crude' is inferred from Ergon's own 'naphthenic refinery' description, not a stated crude slate. Individual HyGold grade names and cSt viscosities were not found on fetched pages (only a 40-4,900 SUS range). No source opened states shipping modes for base oils, so logistics_modes is empty; Ergon's Hurricane Ida statement places the refinery on the Mississippi River and the 2025 expansion adds a fuels pipeline to the adjacent terminal, but neither ties modes to base oil. Search snippets mention a mid-April 2026 $0.70/gal price notice with conflicting direction; not opened, not recorded. No MDEQ permit was located. Completion of the Sept 2025 maintenance was not confirmed. 1 value is held back because only a paid source supports it.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | marine | Barge receipt at Ergon Refining Docks No. 1, No. 2 and No. 3 The U.S. Army Corps of Engineers dock records list receipt of crude oil at all three Ergon Refining docks. Docks No. 1 and No. 2 are on Vicksburg Harbor and Dock No. 3 is on the Yazoo River Diversion Canal, a harbor off the Mississippi River and not the main stem. The records date from an older port survey. |
Not stated in the dock records | crude | source |
| crude in | marine | Imported crude entered at the customs port of Baton Rouge, LA EIA company-level import records for 2024 to 2026 show crude from the United Kingdom and Angola entered at Baton Rouge for processing at Ergon Refining Inc, Vicksburg. The importer of record is the affiliate Ergon Oil Purchasing Inc. Cargoes run about 440 to 510 thousand barrels, several a year. |
United Kingdom and Angola | crude | source |
| products out | truck rack | Refinery/terminal truck rack ERI already markets 'a full slate of gasoline and diesel fuel products' from the Vicksburg fuels terminal it purchased in 2023, implying an active truck-rack operation there; not separately documented as a distinct refinery-gate rack. |
Vicksburg, Mississippi | distillate asphalt lubricants | source |
| products out | barge | Ergon Refining Docks No. 1, No. 2 and No. 3 The U.S. Army Corps of Engineers dock records list shipment of diesel fuel over Dock No. 1, petroleum products over Dock No. 2 and asphalt over Dock No. 3. Base oils are not named separately. The records date from an older port survey. |
Vicksburg Harbor and the Yazoo River Diversion Canal, Vicksburg, MS | distillate asphalt | source |
| products out | truck rack | Ergon Refining Inc fuels terminal truck rack (IRS T-64-MS-2419, ex-CITGO) The IRS active terminal list dated 8/30/2026 shows T-64-MS-2419, Ergon Refining Inc, at 1585 Haining Road. This is the fuels terminal Ergon Refining bought from CITGO in 2023, next to the refinery at 2125 Haining Road. The terminal has its own barge dock, which the Army Corps record lists for receipt of petroleum products. |
1585 Haining Road, Vicksburg, MS | gasoline distillate | source |
| products out | rail | Rail loading at the Ergon Refining tank terminal The Army Corps dock records show four surface tracks serving the terminal behind Docks No. 1 and No. 2, connecting with Kansas City Southern Railway. The 2024 state water permit names a rail loading rack at the ERI Terminal. The products loaded to rail are not stated. |
Tank terminal behind Docks No. 1 and No. 2, Haining Road, Vicksburg, MS | source | |
| products out | pipeline | New refinery-to-terminal pipeline (under construction as part of 2025 expansion) As part of the $400M expansion announced March 2025, ERI is building pipeline infrastructure connecting the refinery directly to its adjacent Vicksburg fuels terminal (acquired from Citgo Petroleum Corp. in September 2023) to support wholesale gasoline/diesel marketing in western Mississippi and eastern Louisiana. Expected online with the rest of the expansion in Q1 2027. |
ERI Vicksburg fuels terminal (adjacent to refinery) | gasoline distillate | source |
| products out | pipeline | Ergon Refining Inc. Vicksburg fuels terminal (ex-CITGO Petroleum Vicksburg terminal) | Refinery-to-terminal line(s) to the adjacent terminal (CITGO terminal address reported as 1585 Haining Rd, Vicksburg; refinery is at 2125 Haining Rd) | gasoline distillate | source |
Docks
The docks at this facility and, where a ship agent or port publishes it, the largest vessel each berth takes. Channel conditions change; these figures are a guide, not clearance to sail.
Ergon Refining, Dock No. 1 · crude in, products out
- Receipt and shipment of diesel fuel, and receipt of crude oil.
- Owner: Ergon Refining, Inc. Address 2125 Haining Road.
- Berthing length 325 ft. Depth alongside 9 ft in the Army Corps record, which comes from an older port survey.
- Two 12-inch crude oil and diesel fuel lines run to five storage tanks, total 410,000 barrels.
- Four surface tracks serve the terminal at rear and connect with Kansas City Southern Railway.
Source: U.S. Army Corps of Engineers dock records, read 2026-10-11.
Ergon Refining, Dock No. 2 · crude in, products out
- Receipt and shipment of petroleum products, and receipt of crude oil and naphtha.
- Owner: Ergon Refining, Inc. Address 2185 Haining Road.
- Berthing length 300 ft. Depth alongside 9 ft in the Army Corps record, which comes from an older port survey.
- Six 12-inch lines run to one 20,000-barrel naphtha tank and fourteen product tanks, total 495,900 barrels.
Source: U.S. Army Corps of Engineers dock records, read 2026-10-11.
Ergon Refining, Dock No. 3 · crude in, products out
- Receipt of crude oil and shipment of asphalt.
- Owner: Ergon Refining, Inc. Address 2125 Haining Road. Left bank, Mile 5.0 A.H.P.
- Berthing length 408 ft. Depth alongside 2 to 10 ft in the Army Corps record, which comes from an older port survey.
- One 12-inch crude oil line runs to three tanks, total 240,000 barrels. One 12-inch asphalt line runs to ten tanks, total 250,000 barrels.
Source: U.S. Army Corps of Engineers dock records, read 2026-10-11.
Ergon Refining fuels terminal dock (CITGO Petroleum Corp., Vicksburg Dock in the Army Corps record)
- Receipt of petroleum products for the fuels terminal. The record lists no shipment.
- Address 1585 Haining Road, the same address as IRS terminal T-64-MS-2419. The Army Corps record still names CITGO as owner; Ergon Refining bought the terminal in 2023.
- Berthing length 200 ft. Depth alongside 8 ft in the Army Corps record, which comes from an older port survey.
- Four 8-inch lines run to eight storage tanks, total 215,000 barrels.
Source: U.S. Army Corps of Engineers dock records, read 2026-10-11.
Pipeline reach
No tariff origin point is linked to this refinery yet.
By water
| Waterway | Terminals | Nearest mi | Farthest mi |
|---|---|---|---|
| Mississippi River | 21 | 1 | 632 |
| Ohio/Mississippi River | 4 | 346 | 351 |
All 25 barge-reachable terminals
| Terminal | Location | Supplied by barge on | Miles |
|---|---|---|---|
| Ergon Refining Inc | Vicksburg, MS | Mississippi River | 1 |
| Hunt Southland Refining Company | Vicksburg, MS | Mississippi River | 4 |
| Vicksburg Petroleum Products, LLC | Vicksburg, MS | Mississippi River | 7 |
| Lincoln Terminal Company LLC | Natchez, MS | Mississippi River | 66 |
| Delta Terminal Incorporated | Greenville, MS | Mississippi River | 69 |
| TransMontaigne - Greenville - N | Greenville, MS | Mississippi River | 71 |
| Transmontaigne - Greenville- S | Greenville, MS | Mississippi River | 71 |
| Greenville | Greenville, MS | Mississippi River | 73 |
| Delek Logistics Operating - Helena Terminal | Helena, AR | Mississippi River | 147 |
| IMTT - Geismar | Geismar, LA | Mississippi River | 152 |
| Equilon Enterprises LLC | Covent, LA | Mississippi River | 162 |
| Gulf Gateway Terminal | New Orleans, LA | Mississippi River | 173 |
| Kinder Morgan - Harvey (New Orleans) Terminal | Harvey, LA | Mississippi River | 178 |
| Oakmar Terminal | Hayti, MO | Mississippi River | 263 |
| Marathon Paducah | Paducah, KY | Ohio/Mississippi River | 346 |
| TransMontaigne - Cape Girardeau | Cape Girardeau, MO | Mississippi River | 347 |
| Marathon Petroleum Company LLC - Paducah Terminal | Paducah, KY | Ohio/Mississippi River | 348 |
| TransMontaigne - Paducah | Paducah, KY | Ohio/Mississippi River | 350 |
| Jsc Terminal LLC (Dba Midwest Terminal) | Paducah, KY | Ohio/Mississippi River | 351 |
| ConocoPhillips - E. St. Louis | Cahokia, IL | Mississippi River (St. Louis harbor / Cahokia) | 430 |
| Omega Partners III Hartford | Hartford, IL | Mississippi River (Hartford, UMR) | 447 |
| Kinder Morgan Liquids Terminals LLC | Hartford, IL | Mississippi River (Hartford / Wood River, mile ~196 UMR) | 447 |
| Hartford Wood River Terminal | Hartford, IL | Mississippi River (Hartford / Wood River, UMR) | 448 |
| Ayers Oil Company - Canton | Canton, MO | Mississippi River | 537 |
| US Venture - Bettendorf | Bettendorf, IA | Mississippi River | 632 |
Substitutes
No other refinery shares a tariff system with this one in our data.
Events
-
2026-04-10
Posted price change
Group V naphthenic
Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by a further $0.55 per gallon effective 2026-04-10, again citing Middle East developments. source
-
2026-03-27
Posted price change
Group V naphthenic
Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by $0.35 per gallon effective 2026-03-27, citing developments in the Middle East. source
-
2026-03-10
other
Magnolia Marine Transport (Ergon's Vicksburg-based heated petroleum barge carrier) added three towboats and nine barges. This is fleet context for the refinery's barge logistics, not a refinery event. source
-
2025-09-01
Turnaround
Group V naphthenic
Ergon announced planned fall maintenance at the Vicksburg naphthenic refinery starting 2025-09-01, with various operating units down for approximately six weeks for reliability improvements; inventories sufficient and no supply interruptions expected for ratable customers. No completion notice was found. source
-
2025-05-09
Posted price change
Group V naphthenic
Ergon decreased North American prices for HyVolt dielectric fluids, HyGold base oils and HyPrene process oils by $0.20 per gallon effective 2025-05-09. source
-
2025-03-26
Other
base oil
OGJ reported the proposed $400 million project at ERI's 26,500-b/d specialty naphthenic base oil refinery: +20% crude distillation, +6,000 b/d gasoline, a combined heat and power plant and a pipeline to the Vicksburg fuels terminal; completion first-quarter 2027. source
-
2025-03-25
expansion
Ergon announced a $400 million expansion of Ergon Refining Inc.'s Vicksburg, MS refinery: a 20% increase in crude distillation capacity (from the existing 26,500 bpd) and installation of new gasoline-production capability (~6,000 bpd) to supply wholesale fuels markets in western Mississippi and eastern Louisiana, plus a new dual cogeneration power complex. Includes new pipeline infrastructure connecting the refinery to ERI's adjacent Vicksburg fuels terminal. Supported by Mississippi Development Authority road-improvement assistance. Expected completion Q1 2027; creates 20 new permanent jobs. source
-
2025-03-25
Expansion
base oil
ERI announced plans to expand processing capabilities at Vicksburg to include gasoline production (nearly 6,000 b/d) with crude distillation capacity rising 20%, expected online in the first quarter of 2027; includes pipeline infrastructure to the adjacent fuels terminal Ergon bought in August 2023. No change to naphthenic base oil capacity is stated. Target recorded as 2027-03 for 'first quarter 2027'. source
-
2024-06-26
regulatory
MDEQ published a draft NPDES renewal permit (MS0034711, activity PER20230002) for Ergon Refining Inc. It covers outfalls for the refinery (to the Yazoo Canal) and for the 'ERI Terminal' (to the Vicksburg Harbor Channel, including a rail loading rack). source
-
2023-09
other
ERI acquired the Vicksburg fuels terminal (adjacent to the refinery) from Citgo Petroleum Corp. to expand wholesale marketing of gasoline and diesel. This is the terminal that the 2025 expansion's pipeline is planned to connect directly to the refinery. source
-
2023-08-31
ownership
Ergon Refining Inc. bought CITGO's Vicksburg fuels terminal, next to the refinery, and began offering gasoline and diesel from it in mid-September 2023. source
-
2021-10-23
Turnaround
Group V naphthenic
Scheduled fall maintenance at the Vicksburg naphthenic refinery began 2021-10-23; Ergon announced completion 2021-11-16 with reliability improvements made, all units running and no supply interruptions. Inventories were raised beforehand. source
-
2021-08-30
Other
Group V naphthenic
Ergon stated its Vicksburg naphthenic refinery on the Mississippi River was not impacted by Hurricane Ida, was fully operational, and customers should not expect supply chain disruptions. source
-
2020-04-20
Turnaround
Group V naphthenic
Scheduled turnaround at the Vicksburg naphthenic refinery completed; last unit returned to service 2020-04-20 after the schedule was extended for COVID-19 precautions. Ergon reported no supply interruptions. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.