Foreland Refinery (Eagle Springs, Railroad Valley)
Foreland Refining Corporation · Sky Quarry Inc. (NASDAQ: SKYQ) · Ely, NV
- bpd crude capacity · EIA 2026
- 2,000
- pipelines it injects into
- 0
- delivery points reachable
- 0
- terminals on those points
- 0
- events on record
- 5
Capability
Crude distillation 2,000 bpd operable, 2,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Upgrading
| Vacuum distillation | 2,750 sd |
Production capacity
Crude slate
Heavy crude oil sourced from Nevada (Railroad Valley) and Utah fields.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | truck | Truck-delivered heavy crude (Nevada / Utah) No pipeline or marine crude access; a small, landlocked refinery supplied by truck. |
Railroad Valley, Nevada and Uinta Basin-area Utah fields | crude | source |
| products out | truck rack | Western U.S. truck distribution Diesel, vacuum gas oil (VGO), naphtha and liquid paving asphalt are trucked out for Western U.S. markets; no pipeline or rail product distribution found. No gasoline is produced. |
Foreland Refinery | distillate asphalt | source |
Pipeline reach
No tariff origin point is linked to this refinery yet.
Substitutes
No other refinery shares a tariff system with this one in our data.
Events
-
2026-09-24
other
Sky Quarry announced it received a Nevada Division of Environmental Protection air permit and restarted the Eagle Springs refinery after ~$300,000 of repairs; nameplate ~5,000 bpd; ~15,000 bbl crude inventory on hand. source
-
2026-07
other
Refining operations expected to commence/resume. source
-
2026-07
other
Sky Quarry named Ray Hansen, a 35-year refining industry veteran and former manager of HF Sinclair's 140,000 bpd El Dorado, KS refinery, as President of Foreland Refining Corporation. source
-
2026-06
outage
Sky Quarry announced the Foreland Refinery was entering its 'production phase' after a period of non-operation, resuming output following repairs, maintenance and commissioning; approximately 10,000 barrels of crude/in-process inventory were on site at restart. source
-
2025
outage
Refinery shut down in Q4 2025 for a boiler repair; unscheduled repairs hit Q3-Q4 2025 and Q1 2026 results; management expected operation by end of Q2 2026. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.