Suncor Energy Commerce City Refinery -- Plant 2 (East)
Suncor Energy (USA) Inc. · Suncor Energy Inc. (Canada) · Commerce City East, CO
- bpd crude capacity · EIA 2026
- 36,000
- pipelines it injects into
- 0
- delivery points reachable
- 0
- terminals on those points
- 0
- events on record
- 9
Capability
Crude distillation 36,000 bpd operable, 36,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Conversion — makes gasoline and diesel from heavier oil
| Catalytic cracking (FCC) | 8,500 |
Upgrading
| Catalytic reforming — low pressure | 10,000 |
| Vacuum distillation | 8,500 sd |
Treating — meets sulfur specs
| Hydrotreating — naphtha / reformer feed | 11,000 sd |
Production capacity
Crude slate
Sweet and sour crude oils from Colorado, Montana, North Dakota, Wyoming and Canada, as stated in the EPA notice of violation of July 2, 2024. The statement covers the Commerce City Refinery as a whole. No Plant 2 slate is published.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | truck | Truck unloading at the refinery The EPA notice of violation of July 2, 2024 says incoming crude oil is received by truck or by pipeline. It describes the refinery as a whole and does not split receipts between the plants or name the pipeline. |
Colorado, Montana, North Dakota, Wyoming and Canada (refinery as a whole) | crude | source |
| products out | truck rack | Suncor Energy (U.S.A.) Inc. Plant 2 truck loading dock (IRS T-84-CO-4101) Plant 2 has its own truck loading dock with a flare (emission point C001) under its air permit 95OPAD108, as described in EPA's letter of March 25, 2022. IRS terminal T-84-CO-4101 is at 5800 Brighton Boulevard, the East Plant's address; the match is by address. EPA's order of July 31, 2023 lists Plant 2's products as gasoline, diesel fuel and asphalt, but no document states what the truck dock loads. |
5800 Brighton Boulevard, Commerce City, CO | source | |
| products out | rail | Plant 2 railcar loading dock Plant 2 has its own railcar dock with a flare (emission point C002). EPA's order of July 31, 2023 describes LPG loading at the rail rack and says the plant ceased loading gasoline there. The serving railroad is not named. |
Commerce City, CO (Plant 2) | lpg | source |
Pipeline reach
No tariff origin point is linked to this refinery yet.
Substitutes
No other refinery shares a tariff system with this one in our data.
Events
-
2026-09
regulatory
Colorado preparing tougher rules and a crackdown on Suncor pollution (headline only, Colorado Sun 2026-09-10). source
-
2026-05
outage
A third-party power outage caused an unplanned operational shutdown of units at the Commerce City refinery, with flaring and smoke (Reuters via TradingView; Denverite 2026-05-11). source
-
2026-04-15
outage
Plant 2 shutdown and flaring from a 'possible electrical issue' sent heavy black smoke over north Denver; Plants 1 and 3 were already down for maintenance. source
-
2026-03-17
turnaround
Suncor began planned maintenance at the 98,000 b/d Commerce City refinery; Plants 1 and 3 were offline for planned maintenance in April 2026. source
-
2026-02-02
regulatory
A petition was filed with EPA against the reopened Plant 2 Title V permit. source
-
2025-12-05
regulatory
CDPHE issued the reopened Title V permit 95OPAD108 for Plant 2. source
-
2024-07-02
regulatory
EPA and CDPHE issued Notice of Violation CAA-08-2024-0010 for air pollution violations at the Commerce City refinery. The notice covers all three plants. source
-
2024-02
regulatory
CDPHE announced Suncor must pay at least $10.5 million in penalties and projects for July 2019 to June 2021 air violations (Colorado's largest single-facility package), and must double its fenceline monitoring. source
-
2023-07-31
regulatory
The EPA Administrator issued an order on petitions against the Plant 2 Title V air permit (95OPAD108). source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.