Suncor Energy Commerce City Refinery -- Plants 1 and 3 (West)
Suncor Energy (USA) Inc. · Suncor Energy Inc. (Canada) · Commerce City West, CO
- bpd crude capacity · EIA 2026
- 67,000
- pipelines it injects into
- 0
- delivery points reachable
- 0
- terminals on those points
- 0
- events on record
- 6
Capability
Crude distillation 67,000 bpd operable, 67,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Conversion — makes gasoline and diesel from heavier oil
| Catalytic cracking (FCC) | 20,000 |
Upgrading
| Catalytic reforming — low pressure | 10,000 |
| Vacuum distillation | 25,000 sd |
Treating — meets sulfur specs
| Hydrotreating — diesel | 23,330 sd |
| Hydrotreating — kerosene & jet | 12,100 sd |
| Hydrotreating — naphtha / reformer feed | 11,000 sd |
| Hydrotreating — heavy gas oil | 30,000 sd |
Production capacity
Crude slate
Sweet and sour crude oils received from Colorado, Montana, North Dakota, Wyoming and Canada, by truck or by pipeline, according to the 2024 EPA and Colorado notice of violation. The statement covers the whole Commerce City refinery, not the West plant alone.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | truck | Crude truck unloading at the refinery The 2024 EPA and Colorado notice of violation says incoming crude oil is received by truck or by pipeline. It describes the Commerce City refinery as a whole and does not split receipts between the West and East plants. |
Colorado, Montana, North Dakota, Wyoming and Canada (source areas given for the refinery as a whole) | crude | source |
| products out | truck rack | Suncor Energy (U.S.A.) Inc. Denver Truck Terminal Suncor operates a gasoline loading rack called the Denver Truck Terminal, where some of the refinery's finished products are loaded into tanker trucks. The 2024 notice lists the refinery's main products as gasoline, diesel, asphalt, jet fuel and liquefied petroleum gas. The notice does not give the rack's street address or say which plant it sits in, and it does not describe asphalt loading. |
Commerce City, CO | gasoline distillate asphalt | source |
| products out | rail | Plant 1 Rail Loading Rack (R101) Plant 1 has its own rail loading rack, unit R101 in permit 96OPAD120, with a vapor combustion unit regulated under the federal bulk gasoline terminal rule. Colorado's permit review calls it the Plant 1 OMD rack (Plant 1 rail rack). The serving railroad is not named in these documents. |
Plant 1, Commerce City, CO | gasoline | source |
| products out | terminal | Sunoco LP Denver terminal Sunoco LP's page for its Denver terminal (formerly NuStar) lists the Suncor Refinery as a receipt source, alongside pipeline and ethanol by truck. The page does not say which plant supplies the terminal, by what line, or which products. |
3601 E 56th Street, Commerce City, CO | source |
Pipeline reach
No tariff origin point is linked to this refinery yet.
Substitutes
No other refinery shares a tariff system with this one in our data.
Events
-
2026-09
regulatory
[Complex-wide, also listed under Plant 2] Colorado preparing tougher rules and a crackdown on Suncor pollution (headline only, Colorado Sun 2026-09-10). source
-
2026-05
outage
[Complex-wide, also listed under Plant 2] A third-party power outage caused an unplanned operational shutdown of units at the Commerce City refinery, with flaring and smoke (Reuters via TradingView; Denverite 2026-05-11). source
-
2026-04
turnaround
Plant 1 (with Plant 3) was offline for planned maintenance when Plant 2 shut down on 2026-04-15 (Hoodline: 'Plants 1 and 3 were already offline for planned maintenance'). source
-
2026-03-17
turnaround
[Complex-wide, also listed under Plant 2] Suncor began planned maintenance at the 98,000 b/d Commerce City refinery; Plants 1 and 3 were offline for planned maintenance in April 2026. source
-
2024-07-02
regulatory
[Complex-wide, also listed under Plant 2] EPA and CDPHE issued Notice of Violation CAA-08-2024-0010 covering the refinery at 5800 and 5801 Brighton Boulevard. It includes a Plant 1 item: the Rail Loading Rack (R101) vapor combustion unit is required to stay at or above 1,299 degrees Fahrenheit on a 6-hour rolling average. source
-
2024-02
regulatory
[Complex-wide, also listed under Plant 2] CDPHE announced Suncor must pay at least $10.5 million in penalties and projects for July 2019 to June 2021 air violations (Colorado's largest single-facility package), and must double its fenceline monitoring. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.