Pipeline system
Calnev Pipeline
Kinder Morgan (Calnev Pipe Line LLC)
- tariff points
- 3
- origins
- 1
- origin refineries
- 0
- terminals served · 0 confirmed
- 7
- published routes
- 2
Rates
| Origin Delivery point | Watson | Tariff |
|---|---|---|
| NV | ||
| McCarran International Airport | 251.13 | FERC No. 34.16.0 |
| North Las Vegas Terminal | 251.13 | FERC No. 34.16.0 |
Lines in this system
| Line | From | To | Length | Diameter | Capacity | Products |
|---|---|---|---|---|---|---|
| CALNEV Pipeline | Colton North, CA (from SFPP Watson and East Hynes origins) | Lenwood Jct, CA; Barstow, CA; Yermo, CA (rail yard); Harry Reid International Airport, NV; Las Vegas, NV; Nellis AFB; Edwards AFB | 566 miles | 14 inch (multiple products) and 8 inch (jet fuel only) | — | Gasoline Diesel Jet fuel |
Source: Kinder Morgan products operations page, kindermorgan.com/Operations/Products.
Connects with
| Direction | Pipeline | Interchange | Tariff |
|---|---|---|---|
| Receives from | Kinder Morgan SFPP | Colton, CA (San Bernardino County) | SFPP FERC No. 196.32.0; Calnev FERC No. 34.16.0 |
Tariff points
| Point | Type | Location | Products | Terminals |
|---|---|---|---|---|
| Watson | origin | Carson, CA | 0 | |
| McCarran International Airport | destination | Las Vegas, NV | 6 | |
| North Las Vegas Terminal | destination | North Las Vegas, NV | 1 |
Products & grades
The tariffs on file don’t list grade names for this system.
Tariffs
| Tariff | Type | Title | Effective |
|---|
Fees & terms
| Charge | Amount | Applies | Source |
|---|---|---|---|
| other | 53.55 cents per Barrelcents/bbl | Applies at: North Las Vegas Terminal, Clark County, NV. Terminal facilities and services charge at Carrier's North Las Vegas Terminal, in addition to the transportation rate, commencing at the delivery manifold. | FERC No. 34.16.0 Item Item 320.3 |
| transfer | 6.5 cents per Barrelcents/bbl | Applies at: North Las Vegas Terminal, Clark County, NV. Charged for any Petroleum Product transferred after initial delivery at Customer's request (change of ownership or physical relocation within terminal facilities). | FERC No. 34.16.0 Item Item 320.4 |
Status & ownership
- PHMSA / NPMS
- OPID 26125 · CALNEV PIPELINE CO · Non-HVL product (refined products) · interstate (checked 2025-12-31, PHMSA HL annual report 2025 (OPID 26125; same company))
- Operator mileage
- CALNEV PIPELINE CO reports 566 onshore miles (2025 annual report): California 450, Nevada 117
By pipe size (in): ≤4″ 1, 6″ 52, 8″ 253, 10″ 3, 12″ 7, 14″ 248, 16″ 1, 20″ 2
Operator-wide figures from PHMSA hazardous-liquid annual reports; one OPID can cover several systems.
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.