Supply Explorer
Pipeline system

Cenex Pipeline

CHS Inc. (Cenex Pipeline, LLC)

tariff points
5
origins
3
origin refineries
3
terminals served · 1 confirmed
4
published routes
5

Rates

¢/bbl · local line-haul · lowest published rate per pair
Origin Delivery point Laurel Billings Minot Tariff
MT
Billings, Yellowstone County, MT 39.33 — — Montana P.S.C. No. 37
Glendive, Dawson County, MT 165.37 165.37 — Montana P.S.C. No. 37
ND
Minot, Ward County, ND 337.50 — — F.E.R.C. No. 14.12.0
Prosper Jct., Cass County, ND — — 210.19 F.E.R.C. No. 16.11.0

Connects with

Other pipelines that hand product to this system or take it on, where a joint or proportional tariff or a junction point names both carriers.
Direction Pipeline Interchange Tariff
Hands to Magellan Midstream Fargo Jct. / Prosper Jct., ND (Cenex Pipeline Jct.) Magellan FERC No. 194.8.0

Tariff points

Origins and delivery points named in the tariffs, with the terminals linked to each.
PointTypeLocationProductsTerminals
Laurel, Yellowstone County, MT (CHS refinery) origin Laurel, MT 0
Glendive, Dawson County, MT destination Glendive, MT 1
Prosper Jct., Cass County, ND destination Prosper Jct., ND 1
Billings, Yellowstone County, MT both Billings, MT 1
Minot, Ward County, ND both Minot, ND 1

Products & grades

The tariffs on file don’t list grade names for this system.

Tariffs

0 tariffs on file — every rate and point on this page cites one of them.
TariffTypeTitleEffective

Fees & terms

Charges on top of the line-haul rate. Several apply only to certain lines, volumes or batch types — read the conditions.
ChargeAmountAppliesSource
other pass-through, amount not fixed Per-barrel pass-through of any government-levied spill-fund tax or fee (identical Item 17 text in all three tariffs); no fixed dollar amount published. F.E.R.C. No. 14.12.0 / Montana P.S.C. No. 37 / F.E.R.C. No. 16.1
Item 17

Status & ownership

PHMSA / NPMS
OPID 2170 · CENEX PIPELINE LLC · Non-HVL product (refined products) · interstate (checked 2025-12-31, PHMSA HL annual report 2025 (OPID 2170; same company))
Operator mileage
CENEX PIPELINE LLC reports 803 onshore miles (2025 annual report): North Dakota 441, Montana 362
By pipe size (in): 8″ 327, 10″ 477
Operator-wide figures from PHMSA hazardous-liquid annual reports; one OPID can cover several systems.

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.