Pipeline system
Tesoro Northwest Products Pipeline
FERC regulated
- tariff points
- 7
- origins
- 3
- origin refineries
- 3
- terminals served · 4 confirmed
- 9
- published routes
- 7
Rates
| Origin Delivery point | Salt Lake Station | Pocatello Station | Pasco Station | Tariff |
|---|---|---|---|---|
| ID | ||||
| Boise Station | 257.90 | — | — | F.E.R.C. No. 4.20.0 |
| Burley Station | 161.91 | — | — | F.E.R.C. No. 4.20.0 |
| Pocatello Station | 201.79 | 16.49 | — | F.E.R.C. No. 4.20.0 |
| UT | ||||
| Salt Lake City International Airport | 57.81 | — | — | NJ-20 |
| WA | ||||
| Pasco Station | 318.31 | — | — | F.E.R.C. No. 4.20.0 |
| Spokane Station | — | — | 73.24 | F.E.R.C. No. 2.19.0 |
Connects with
| Direction | Pipeline | Interchange | Tariff |
|---|---|---|---|
| Receives from | HF Sinclair / Holly Energy | Chevron Products Pipe Line Jct., UT | HEP F.E.R.C. No. 55.20.0 |
| Receives from | Pioneer Pipeline | North Salt Lake, UT | Pioneer F.E.R.C. No. 63.21.0 |
Tariff points
| Point | Type | Location | Products | Terminals |
|---|---|---|---|---|
| Salt Lake Station | origin | Woods Cross, UT | 0 | |
| Boise Station | destination | Boise, ID | 3 | |
| Burley Station | destination | Burley, ID | 2 | |
| Salt Lake City International Airport | destination | Salt Lake City, UT | 0 | |
| Spokane Station | destination | Spokane, WA | gasoline distillate | 1 |
| Pocatello Station | both | Pocatello, ID | 1 | |
| Pasco Station | both | Pasco, WA | 2 |
Products & grades
jet fuel
- Commercial Jet Fuel
Tariffs
| Tariff | Type | Title | Effective | |
|---|---|---|---|---|
| F.E.R.C. No. 4.20.0 | local rates | MPLX — Salt Lake Products Pipeline System, local rates (Salt Lake / Pocatello to Burley, Pocatello, Boise, Pasco) | 2026-07-01 | |
| F.E.R.C. No. 2.19.0 | local rates | MPLX — Pasco to Spokane Products Pipeline System, local rates | 2026-07-01 | |
| NJ-20 | local rates | MPLX — Salt Lake Airport Pipeline System (Utah No. NJ-20): non-jurisdictional intrastate rate sheet, Salt Lake Station to Salt Lake City International Airport, commercial jet fuel only. Not a FERC tariff. | 2026-07-01 | |
| F.E.R.C. No. 5.10.0 | rules regulations | MPLX — Northwest products system Rules and Regulations (governs 4.20.0 and 2.19.0) | 2026-05-01 |
Fees & terms
| Charge | Amount | Applies | Source |
|---|---|---|---|
| other | [U] 32.93 cents per Barrelcents/bbl | Charged on the first 5.2 million barrels of throughput shipped from Pocatello Station to Union Pacific Railroad Co. Storage Facilities, Pocatello, after the tariff implementing the fee becomes effective. Not subject to escalation. | F.E.R.C. No. 4.20.0 Item Footnote 1 |
| other | [U] 35.87 cents per Barrelcents/bbl | Charged on each barrel of throughput shipped from Salt Lake Station to Salt Lake City International Airport. Remains in effect until expansion project costs are recovered; not subject to escalation. | NJ-20 Item Footnote 1 |
Status & ownership
- Status
- 760 miles, Salt Lake City, UT to Spokane, WA (Tesoro 8-K Jan 2013; FY2014 10-K), serving PADD 4 (UT, ID) and PADD 5 (WA), with a 5-mile jet fuel line to Salt Lake City International Airport. Historical throughput ~84 kbpd (2011) and ~87 kbpd (2012) (OGJ Dec 2012; Spokesman-Review May 2013). Current capacity not published — research gap. Access model (FERC 135 ¶ 61,116, Docket OR11-4-000, 2011): Salt Lake refineries reach the line over private spurs to the origin terminal at Salt Lake Station; interstate transport begins only when product enters the pipeline there, so being in the same city as the station is not evidence of injection. The system 'receives product from five refineries and one pipeline in the Salt Lake City area' (Tesoro Logistics 10-Ks FY2013/FY2014; OGJ 2012); the pipeline is Pioneer: Pioneer Pipe Line Company F.E.R.C. No. 63.21.0 (effective 2026-07-01) is a proportional tariff from Pioneer's North Salt Lake Station to "Tesoro Logistics Northwest Pipelines LLC's North Salt Lake Station" and to UNEV's North Salt Lake Station (https://pipelinetariffs.phillips66.com/pdf.aspx?seqID=6586). Holly Energy F.E.R.C. No. 55.20.0 also delivers from the Woods Cross refinery to a "Chevron Products Pipe Line Jct" (https://s21.q4cdn.com/960253651/files/doc_downloads/2026/06/FERC-No-55-20-0-HRM-WX-Chevron-UT-Pioneer-Prod-UT.pdf).
- Ownership
- Chevron Pipe Line Co. sold the Northwest Products System to Tesoro Logistics LP, closing June 19, 2013, for $354.8M (Tesoro Logistics 10-K FY2013, https://www.sec.gov/Archives/edgar/data/0001507615/000150761514000018/tllp10k.htm). Tesoro Logistics became Andeavor Logistics, which merged into MPLX in 2019; the current tariffs are MPLX-issued. In December 2013 Tesoro agreed, as an FTC condition, to sell its legacy Boise terminal to Sinclair Transportation Co. (same 10-K).
- Intrastate
- The Salt Lake City airport line (NJ-20) is non-FERC-jurisdictional (Utah intrastate). FERC held the Salt Lake refineries' private spurs to the origin terminal non-jurisdictional (135 FERC ¶ 61,116, 2011).
- PHMSA / NPMS
- OPID 32147 · MARATHON PIPE LINE LLC · Non-HVL product (refined products) · interstate (checked 2025-12-31, PHMSA HL annual report 2025 (OPID 32147; operator of record))
- Operator mileage
- MARATHON PIPE LINE LLC reports 8,182 onshore miles (2025 annual report): Illinois 1,456, Indiana 984, Ohio 942, Texas 592, Idaho 554, Kentucky 485, Mississippi 441, Wyoming 424, …
By pipe size (in): ≤4″ 93, 6″ 484, 8″ 2,208, 10″ 992, 12″ 755, 14″ 162, 16″ 436, 20″ 600, 22″ 723, 24″ 351, 26″ 720, 30″ 24, 36″ 3, 40″ 634
Operator-wide figures from PHMSA hazardous-liquid annual reports; one OPID can cover several systems. - Research
- HIGH confidence
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.