Supply Explorer
Terminal

MGC Terminals

101 65th Avenue, Meridian, MS 39301

T-64-MS-2411 Rack market · Meridian, MS gasoline jet fuel distillate renewable diesel transmix biodiesel
pipelines supplying
2
confirmed delivery points
0
lowest ¢/bbl into this terminal
82.73
terminals within 100 mi
12

Supplied by

Tariff delivery points this terminal sits on.

PipelineDelivery pointProductsMatchSource
Colonial Pipeline Meridian (Lauderdale County) gasoline distillate jet fuel same city FERC 99.95.0
Plantation Pipeline Meridian, MS (Lauderdale County) gasoline distillate same city FERC No. 155.49.0

Can be sourced from

Published routes into this terminal’s delivery points, cheapest first · ¢/bbl line-haul
OriginPipeline or modeRefineries at origin¢/bblSource
Collins (Covington County) MS Plantation Pipeline Valero Refining - Meraux LLC 82.73 FERC No. 155.49.0
Collins (Covington County) MS Colonial Pipeline Valero Refining - Meraux LLC 87.90 FERC 99.95.0
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA Plantation Pipeline Exxonmobil Refining & Supply CO
Placid Refining CO
101.22 FERC No. 155.49.0
Pascagoula (Jackson County) MS Plantation Pipeline Chevron USA INC 101.22 FERC No. 155.49.0
Baton Rouge (E. Feliciana Parish) LA Colonial Pipeline Exxonmobil Refining & Supply CO
Placid Refining CO
106.05 FERC 99.95.0
Baton Rouge Dock Facility (W. Feliciana Parish) LA Colonial Pipeline junction or tank farm 106.05 FERC 99.95.0
Krotz Springs (St. Landry Parish) LA Colonial Pipeline Alon Refining Krotz Springs INC 110.91 FERC 99.95.0
Lake Charles (Calcasieu Parish) LA Colonial Pipeline Calcasieu Refining CO
Citgo Petroleum Corp
Phillips 66 Company
126.28 FERC 99.95.0
Hebert (Beaumont - Port Arthur) TX Colonial Pipeline Exxonmobil Refining & Supply CO 130.94 FERC 99.95.0
Houston (Pasadena, Cedar Bayou) TX Colonial Pipeline Deer Park Refining LP
Exxonmobil Refining & Supply CO
Marathon Petroleum CO LP
Pasadena Refining Systems INC
Valero Refining CO Texas LP
Valero Refining CO Texas LP
143.44 FERC 99.95.0
Collins (Covington County) MS Plantation Pipeline committed Valero Refining - Meraux LLC 151.05 FERC No. 159.10.0
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) LA Plantation Pipeline joint Marathon Petroleum CO LP
Shell Oil Products Us
192.26 FERC No. 156.29.0
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA Plantation Pipeline committed Exxonmobil Refining & Supply CO
Placid Refining CO
237.14 FERC No. 159.10.0
Collins (Covington County) MS Plantation Pipeline committed Valero Refining - Meraux LLC 237.14 FERC No. 159.10.0

Cost to serve this terminal by pipeline

What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.

Gasoline: product adder

¢/gal · product adder
5.18
¢/gal · line-haul tariff · published
2.41
¢/gal · carrying cost · calculated
0.47
¢/gal · pipeline loss · published
0.80
¢/gal · terminaling · estimate
1.50
days financed
9.2

Route used: from Pascagoula on Plantation Pipeline to Meridian, MS (FERC No. 155.49.0 item 10). 5 routes in the table show a lower figure. They start part-way along a pipeline or at a secondary origin, so they leave out the cost of getting product there and do not set this figure.

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 2.410 published Plantation Pipeline FERC No. 155.49.0 item 10: Pascagoula (Jackson County) → Meridian, MS (Lauderdale County), 101.22 ¢/bbl
Carrying cost 0.472 calculated $3.200000/gal × 5.8800% ÷ 365 × 9.159 days (1.659 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 159 pipeline miles at 4.0 mph (general estimate)
Pipeline loss 0.800 published Plantation Pipeline FERC No. 154.22.0 item 110.3, pipeline loss on barrels received at origin: 0.25% of volume at $3.2000/gal = 33.60 ¢/bbl
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 5.182 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (11 of 11). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Collins (Covington County) starts part-way along the line Colonial Pipeline Meridian (Lauderdale County) 2.09 0.43 0.44* 1.50 4.46 8.3 — FERC 99.95.0 item 140
Collins (Covington County) starts part-way along the line Plantation Pipeline Meridian, MS (Lauderdale County) 1.97 0.43 0.80* 1.50 4.70 8.3 — FERC No. 155.49.0 item 10
Baton Rouge Dock Facility (W. Feliciana Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 2.53 0.50 0.44* 1.50 4.96 9.7 — FERC 99.95.0 item 140
Baton Rouge (E. Feliciana Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 2.53 0.51 0.44* 1.50 4.97 9.8 — FERC 99.95.0 item 140
Krotz Springs (St. Landry Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 2.64 0.52 0.44* 1.50 5.10 10.1 — FERC 99.95.0 item 60
Pascagoula (Jackson County) Plantation Pipeline Meridian, MS (Lauderdale County) 2.41 0.47 0.80* 1.50 5.18 9.2 — FERC No. 155.49.0 item 10
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts Plantation Pipeline Meridian, MS (Lauderdale County) 2.41 0.51 0.80* 1.50 5.22 9.8 0.03 FERC No. 155.49.0 item 10
Lake Charles (Calcasieu Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 3.01 0.58 0.44* 1.50 5.52 11.2 0.34 FERC 99.95.0 item 60
Hebert (Beaumont - Port Arthur) secondary origin Colonial Pipeline Meridian (Lauderdale County) 3.12 0.61 0.44* 1.50 5.66 11.7 0.48 FERC 99.95.0 item 60
Houston (Pasadena, Cedar Bayou) Colonial Pipeline Meridian (Lauderdale County) 3.42 0.65 0.44* 1.50 6.00 12.6 0.82 FERC 99.95.0 item 60
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) Plantation Pipeline joint rate Meridian, MS (Lauderdale County) 4.58 0.51 0.80* 1.50 7.38 9.8 2.20 FERC No. 156.29.0 item 10

Diesel: product adder

¢/gal · product adder
5.88
¢/gal · line-haul tariff · published
2.41
¢/gal · carrying cost · calculated
0.73
¢/gal · pipeline loss · published
1.24
¢/gal · terminaling · estimate
1.50
days financed
9.2

Route used: from Pascagoula on Plantation Pipeline to Meridian, MS (FERC No. 155.49.0 item 10). 6 routes in the table show a lower figure. They start part-way along a pipeline or at a secondary origin, so they leave out the cost of getting product there and do not set this figure.

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 2.410 published Plantation Pipeline FERC No. 155.49.0 item 10: Pascagoula (Jackson County) → Meridian, MS (Lauderdale County), 101.22 ¢/bbl
Carrying cost 0.730 calculated $4.950000/gal × 5.8800% ÷ 365 × 9.159 days (1.659 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 159 pipeline miles at 4.0 mph (general estimate)
Pipeline loss 1.238 published Plantation Pipeline FERC No. 154.22.0 item 110.3, pipeline loss on barrels received at origin: 0.25% of volume at $4.9500/gal = 51.98 ¢/bbl
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 5.878 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (11 of 11). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Collins (Covington County) starts part-way along the line Colonial Pipeline Meridian (Lauderdale County) 2.09 0.66 0.44* 1.50 4.69 8.3 — FERC 99.95.0 item 140
Baton Rouge Dock Facility (W. Feliciana Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 2.53 0.78 0.44* 1.50 5.24 9.7 — FERC 99.95.0 item 140
Baton Rouge (E. Feliciana Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 2.53 0.78 0.44* 1.50 5.24 9.8 — FERC 99.95.0 item 140
Collins (Covington County) starts part-way along the line Plantation Pipeline Meridian, MS (Lauderdale County) 1.97 0.66 1.24* 1.50 5.37 8.3 — FERC No. 155.49.0 item 10
Krotz Springs (St. Landry Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 2.64 0.81 0.44* 1.50 5.38 10.1 — FERC 99.95.0 item 60
Lake Charles (Calcasieu Parish) secondary origin Colonial Pipeline Meridian (Lauderdale County) 3.01 0.89 0.44* 1.50 5.84 11.2 — FERC 99.95.0 item 60
Pascagoula (Jackson County) Plantation Pipeline Meridian, MS (Lauderdale County) 2.41 0.73 1.24* 1.50 5.88 9.2 — FERC No. 155.49.0 item 10
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts Plantation Pipeline Meridian, MS (Lauderdale County) 2.41 0.78 1.24* 1.50 5.93 9.8 0.05 FERC No. 155.49.0 item 10
Hebert (Beaumont - Port Arthur) secondary origin Colonial Pipeline Meridian (Lauderdale County) 3.12 0.94 0.44* 1.50 5.99 11.7 0.11 FERC 99.95.0 item 60
Houston (Pasadena, Cedar Bayou) Colonial Pipeline Meridian (Lauderdale County) 3.42 1.00 0.44* 1.50 6.35 12.6 0.47 FERC 99.95.0 item 60
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) Plantation Pipeline joint rate Meridian, MS (Lauderdale County) 4.58 0.78 1.24* 1.50 8.10 9.8 2.22 FERC No. 156.29.0 item 10
Inputs and assumptions behind these figures
  • Product value (for carrying cost and loss only): the prior day's spot price. Gasoline: OilPriceAPI GASOLINE_RBOB_USD, 2026-10-19. Diesel: OilPriceAPI HEATING_OIL_USD, 2026-10-19. These are the New York Harbor futures benchmarks, not a Gulf Coast price.
  • Interest rate: SOFR 3.88% (2026-10-16) + 2.0 points.
  • Transit (estimate): straight-line miles between the tariff origin and delivery point × 1.15, at 4.0 mph unless the pipeline has its own figure.
  • Days financed (estimate): transit, plus half a 5-day shipping cycle waiting to lift (once for each pipeline on a two-pipeline route), plus 5 days of stock at the terminal.
  • Pipeline loss: the charge or volume deduction the tariff states, where it states one (marked *; a deduction is costed at the product value above). Otherwise an estimate of 0.10% of product value per pipeline, two for a joint rate; that includes pipelines that share out actual losses without publishing a figure, and tariffs that state no loss term.
  • Terminaling: the carrier's terminal charge where its tariff states one (marked *), otherwise a flat 1.5¢/gal estimate.
  • Which route sets the figure: the lowest one that starts at a supply origin. On Colonial that is Houston. A rate that starts part-way along a pipeline, or at a secondary origin, stays in the table but does not set the figure. Where a rate starts at a point another carrier delivers to, the first carrier's lowest rate into that point is added, with its loss and time in the pipe; terminaling is charged once. The same is done where one pipeline files the movement as two rates. Which origins are treated this way is our own review of each system, not a statement in a tariff.
  • Rates used: each pipeline's ordinary filed rate. Committed, volume-tier, discount and bid rates are left out, as are conditional fees (shown on each pipeline page), additives, taxes and the value of line space.
  • Assumption set in force from 2026-10-01; review by 2027-01-01.

Stored snapshots of the product adder

Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.

Snapshot Product Route Adder ¢/gal What moved
2026-10-14 Diesel Pascagoula · Plantation Pipeline 5.87 pipeline loss +0.06¢; carrying cost +0.04¢
2026-10-14 Gasoline Pascagoula · Plantation Pipeline 5.20 pipeline loss −0.00¢; carrying cost −0.00¢
2026-10-11 Diesel Pascagoula · Plantation Pipeline 5.77 pipeline loss −0.03¢; carrying cost −0.02¢
2026-10-11 Gasoline Pascagoula · Plantation Pipeline 5.21 pipeline loss −0.00¢; carrying cost −0.00¢
2026-10-09 Diesel Pascagoula · Plantation Pipeline 5.82 first snapshot
2026-10-09 Gasoline Pascagoula · Plantation Pipeline 5.21 first snapshot

Terminals within 100 miles

TerminalCityMilesProducts (inferred from supply)
Murphy Oil USA, Inc. - Meridian T-64-MS-2414 Meridian, MS 0.2 gasoline jet fuel distillate renewable diesel transmix biodiesel
TransMontaigne - Meridian T-64-MS-2415 Meridian, MS 0.3 gasoline jet fuel distillate renewable diesel transmix biodiesel
CITGO - Meridian T-64-MS-2412 Meridian, MS 0.3 gasoline jet fuel distillate renewable diesel transmix biodiesel
Hunt-Southland Refining Company T-64-MS-2418 Heidelberg, MS 40.2 asphalt naphtha
Teppco Terrminaling and Marketing Company T-76-AL-0001 Boligee, AL 52.6 unknown
Colonial Pipeline Collins T-64-MS-2426 Collins, MS 67.0 gasoline jet fuel distillate renewable diesel transmix
Chevron USA Incorporated - Collins T-64-MS-2401 Collins, MS 68.3 gasoline jet fuel distillate renewable diesel transmix
Kinder Morgan Southeast Terminals LLC T-64-MS-2402 Collins, MS 68.4 gasoline jet fuel distillate renewable diesel transmix biodiesel
Equilon Enterprises LLC T-64-MS-2404 Collins, MS 68.5 gasoline jet fuel distillate renewable diesel transmix
IMTT Epic LLC T-63-AL-2330 Moundville, AL 71.8 gasoline jet fuel distillate biodiesel renewable diesel
Energy Transfer Hattiesburg NGLsLLC T-64-MS-2423 Petal, MS 74.2 propane
Hunt Refining Company T-63-AL-2329 Tuscaloosa, AL 88.5 unknown

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.