MGC Terminals
101 65th Avenue, Meridian, MS 39301
- pipelines supplying
- 2
- confirmed delivery points
- 0
- lowest ¢/bbl into this terminal
- 82.73
- terminals within 100 mi
- 12
Supplied by
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Colonial Pipeline | Meridian (Lauderdale County) | gasoline distillate jet fuel | same city | FERC 99.95.0 |
| Plantation Pipeline | Meridian, MS (Lauderdale County) | gasoline distillate | same city | FERC No. 155.49.0 |
Can be sourced from
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Collins (Covington County) MS | Plantation Pipeline | Valero Refining - Meraux LLC | 82.73 | FERC No. 155.49.0 |
| Collins (Covington County) MS | Colonial Pipeline | Valero Refining - Meraux LLC | 87.90 | FERC 99.95.0 |
| Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA | Plantation Pipeline |
Exxonmobil Refining & Supply CO Placid Refining CO |
101.22 | FERC No. 155.49.0 |
| Pascagoula (Jackson County) MS | Plantation Pipeline | Chevron USA INC | 101.22 | FERC No. 155.49.0 |
| Baton Rouge (E. Feliciana Parish) LA | Colonial Pipeline |
Exxonmobil Refining & Supply CO Placid Refining CO |
106.05 | FERC 99.95.0 |
| Baton Rouge Dock Facility (W. Feliciana Parish) LA | Colonial Pipeline | junction or tank farm | 106.05 | FERC 99.95.0 |
| Krotz Springs (St. Landry Parish) LA | Colonial Pipeline | Alon Refining Krotz Springs INC | 110.91 | FERC 99.95.0 |
| Lake Charles (Calcasieu Parish) LA | Colonial Pipeline |
Calcasieu Refining CO Citgo Petroleum Corp Phillips 66 Company |
126.28 | FERC 99.95.0 |
| Hebert (Beaumont - Port Arthur) TX | Colonial Pipeline | Exxonmobil Refining & Supply CO | 130.94 | FERC 99.95.0 |
| Houston (Pasadena, Cedar Bayou) TX | Colonial Pipeline |
Deer Park Refining LP Exxonmobil Refining & Supply CO Marathon Petroleum CO LP Pasadena Refining Systems INC Valero Refining CO Texas LP Valero Refining CO Texas LP |
143.44 | FERC 99.95.0 |
| Collins (Covington County) MS | Plantation Pipeline committed | Valero Refining - Meraux LLC | 151.05 | FERC No. 159.10.0 |
| Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) LA | Plantation Pipeline joint |
Marathon Petroleum CO LP Shell Oil Products Us |
192.26 | FERC No. 156.29.0 |
| Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA | Plantation Pipeline committed |
Exxonmobil Refining & Supply CO Placid Refining CO |
237.14 | FERC No. 159.10.0 |
| Collins (Covington County) MS | Plantation Pipeline committed | Valero Refining - Meraux LLC | 237.14 | FERC No. 159.10.0 |
Cost to serve this terminal by pipeline
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Gasoline: product adder
- ¢/gal · product adder
- 5.18
- ¢/gal · line-haul tariff · published
- 2.41
- ¢/gal · carrying cost · calculated
- 0.47
- ¢/gal · pipeline loss · published
- 0.80
- ¢/gal · terminaling · estimate
- 1.50
- days financed
- 9.2
Route used: from Pascagoula on Plantation Pipeline to Meridian, MS (FERC No. 155.49.0 item 10). 5 routes in the table show a lower figure. They start part-way along a pipeline or at a secondary origin, so they leave out the cost of getting product there and do not set this figure.
How this adder is worked, line by line
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 2.410 | published | Plantation Pipeline FERC No. 155.49.0 item 10: Pascagoula (Jackson County) → Meridian, MS (Lauderdale County), 101.22 ¢/bbl |
| Carrying cost | 0.472 | calculated | $3.200000/gal × 5.8800% ÷ 365 × 9.159 days (1.659 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 159 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.800 | published | Plantation Pipeline FERC No. 154.22.0 item 110.3, pipeline loss on barrels received at origin: 0.25% of volume at $3.2000/gal = 33.60 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 5.182 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (11 of 11). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Collins (Covington County) starts part-way along the line | Colonial Pipeline | Meridian (Lauderdale County) | 2.09 | 0.43 | 0.44* | 1.50 | 4.46 | 8.3 | — | FERC 99.95.0 item 140 |
| Collins (Covington County) starts part-way along the line | Plantation Pipeline | Meridian, MS (Lauderdale County) | 1.97 | 0.43 | 0.80* | 1.50 | 4.70 | 8.3 | — | FERC No. 155.49.0 item 10 |
| Baton Rouge Dock Facility (W. Feliciana Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 2.53 | 0.50 | 0.44* | 1.50 | 4.96 | 9.7 | — | FERC 99.95.0 item 140 |
| Baton Rouge (E. Feliciana Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 2.53 | 0.51 | 0.44* | 1.50 | 4.97 | 9.8 | — | FERC 99.95.0 item 140 |
| Krotz Springs (St. Landry Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 2.64 | 0.52 | 0.44* | 1.50 | 5.10 | 10.1 | — | FERC 99.95.0 item 60 |
| Pascagoula (Jackson County) | Plantation Pipeline | Meridian, MS (Lauderdale County) | 2.41 | 0.47 | 0.80* | 1.50 | 5.18 | 9.2 | — | FERC No. 155.49.0 item 10 |
| Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts | Plantation Pipeline | Meridian, MS (Lauderdale County) | 2.41 | 0.51 | 0.80* | 1.50 | 5.22 | 9.8 | 0.03 | FERC No. 155.49.0 item 10 |
| Lake Charles (Calcasieu Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 3.01 | 0.58 | 0.44* | 1.50 | 5.52 | 11.2 | 0.34 | FERC 99.95.0 item 60 |
| Hebert (Beaumont - Port Arthur) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 3.12 | 0.61 | 0.44* | 1.50 | 5.66 | 11.7 | 0.48 | FERC 99.95.0 item 60 |
| Houston (Pasadena, Cedar Bayou) | Colonial Pipeline | Meridian (Lauderdale County) | 3.42 | 0.65 | 0.44* | 1.50 | 6.00 | 12.6 | 0.82 | FERC 99.95.0 item 60 |
| Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) | Plantation Pipeline joint rate | Meridian, MS (Lauderdale County) | 4.58 | 0.51 | 0.80* | 1.50 | 7.38 | 9.8 | 2.20 | FERC No. 156.29.0 item 10 |
Diesel: product adder
- ¢/gal · product adder
- 5.88
- ¢/gal · line-haul tariff · published
- 2.41
- ¢/gal · carrying cost · calculated
- 0.73
- ¢/gal · pipeline loss · published
- 1.24
- ¢/gal · terminaling · estimate
- 1.50
- days financed
- 9.2
Route used: from Pascagoula on Plantation Pipeline to Meridian, MS (FERC No. 155.49.0 item 10). 6 routes in the table show a lower figure. They start part-way along a pipeline or at a secondary origin, so they leave out the cost of getting product there and do not set this figure.
How this adder is worked, line by line
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 2.410 | published | Plantation Pipeline FERC No. 155.49.0 item 10: Pascagoula (Jackson County) → Meridian, MS (Lauderdale County), 101.22 ¢/bbl |
| Carrying cost | 0.730 | calculated | $4.950000/gal × 5.8800% ÷ 365 × 9.159 days (1.659 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 159 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 1.238 | published | Plantation Pipeline FERC No. 154.22.0 item 110.3, pipeline loss on barrels received at origin: 0.25% of volume at $4.9500/gal = 51.98 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 5.878 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (11 of 11). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Collins (Covington County) starts part-way along the line | Colonial Pipeline | Meridian (Lauderdale County) | 2.09 | 0.66 | 0.44* | 1.50 | 4.69 | 8.3 | — | FERC 99.95.0 item 140 |
| Baton Rouge Dock Facility (W. Feliciana Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 2.53 | 0.78 | 0.44* | 1.50 | 5.24 | 9.7 | — | FERC 99.95.0 item 140 |
| Baton Rouge (E. Feliciana Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 2.53 | 0.78 | 0.44* | 1.50 | 5.24 | 9.8 | — | FERC 99.95.0 item 140 |
| Collins (Covington County) starts part-way along the line | Plantation Pipeline | Meridian, MS (Lauderdale County) | 1.97 | 0.66 | 1.24* | 1.50 | 5.37 | 8.3 | — | FERC No. 155.49.0 item 10 |
| Krotz Springs (St. Landry Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 2.64 | 0.81 | 0.44* | 1.50 | 5.38 | 10.1 | — | FERC 99.95.0 item 60 |
| Lake Charles (Calcasieu Parish) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 3.01 | 0.89 | 0.44* | 1.50 | 5.84 | 11.2 | — | FERC 99.95.0 item 60 |
| Pascagoula (Jackson County) | Plantation Pipeline | Meridian, MS (Lauderdale County) | 2.41 | 0.73 | 1.24* | 1.50 | 5.88 | 9.2 | — | FERC No. 155.49.0 item 10 |
| Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts | Plantation Pipeline | Meridian, MS (Lauderdale County) | 2.41 | 0.78 | 1.24* | 1.50 | 5.93 | 9.8 | 0.05 | FERC No. 155.49.0 item 10 |
| Hebert (Beaumont - Port Arthur) secondary origin | Colonial Pipeline | Meridian (Lauderdale County) | 3.12 | 0.94 | 0.44* | 1.50 | 5.99 | 11.7 | 0.11 | FERC 99.95.0 item 60 |
| Houston (Pasadena, Cedar Bayou) | Colonial Pipeline | Meridian (Lauderdale County) | 3.42 | 1.00 | 0.44* | 1.50 | 6.35 | 12.6 | 0.47 | FERC 99.95.0 item 60 |
| Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) | Plantation Pipeline joint rate | Meridian, MS (Lauderdale County) | 4.58 | 0.78 | 1.24* | 1.50 | 8.10 | 9.8 | 2.22 | FERC No. 156.29.0 item 10 |
Inputs and assumptions behind these figures
- Product value (for carrying cost and loss only): the prior day's spot price. Gasoline: OilPriceAPI GASOLINE_RBOB_USD, 2026-10-19. Diesel: OilPriceAPI HEATING_OIL_USD, 2026-10-19. These are the New York Harbor futures benchmarks, not a Gulf Coast price.
- Interest rate: SOFR 3.88% (2026-10-16) + 2.0 points.
- Transit (estimate): straight-line miles between the tariff origin and delivery point × 1.15, at 4.0 mph unless the pipeline has its own figure.
- Days financed (estimate): transit, plus half a 5-day shipping cycle waiting to lift (once for each pipeline on a two-pipeline route), plus 5 days of stock at the terminal.
- Pipeline loss: the charge or volume deduction the tariff states, where it states one (marked *; a deduction is costed at the product value above). Otherwise an estimate of 0.10% of product value per pipeline, two for a joint rate; that includes pipelines that share out actual losses without publishing a figure, and tariffs that state no loss term.
- Terminaling: the carrier's terminal charge where its tariff states one (marked *), otherwise a flat 1.5¢/gal estimate.
- Which route sets the figure: the lowest one that starts at a supply origin. On Colonial that is Houston. A rate that starts part-way along a pipeline, or at a secondary origin, stays in the table but does not set the figure. Where a rate starts at a point another carrier delivers to, the first carrier's lowest rate into that point is added, with its loss and time in the pipe; terminaling is charged once. The same is done where one pipeline files the movement as two rates. Which origins are treated this way is our own review of each system, not a statement in a tariff.
- Rates used: each pipeline's ordinary filed rate. Committed, volume-tier, discount and bid rates are left out, as are conditional fees (shown on each pipeline page), additives, taxes and the value of line space.
- Assumption set in force from 2026-10-01; review by 2027-01-01.
Stored snapshots of the product adder
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-10-14 | Diesel | Pascagoula · Plantation Pipeline | 5.87 | pipeline loss +0.06¢; carrying cost +0.04¢ |
| 2026-10-14 | Gasoline | Pascagoula · Plantation Pipeline | 5.20 | pipeline loss −0.00¢; carrying cost −0.00¢ |
| 2026-10-11 | Diesel | Pascagoula · Plantation Pipeline | 5.77 | pipeline loss −0.03¢; carrying cost −0.02¢ |
| 2026-10-11 | Gasoline | Pascagoula · Plantation Pipeline | 5.21 | pipeline loss −0.00¢; carrying cost −0.00¢ |
| 2026-10-09 | Diesel | Pascagoula · Plantation Pipeline | 5.82 | first snapshot |
| 2026-10-09 | Gasoline | Pascagoula · Plantation Pipeline | 5.21 | first snapshot |
Terminals within 100 miles
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| Murphy Oil USA, Inc. - Meridian T-64-MS-2414 | Meridian, MS | 0.2 | gasoline jet fuel distillate renewable diesel transmix biodiesel |
| TransMontaigne - Meridian T-64-MS-2415 | Meridian, MS | 0.3 | gasoline jet fuel distillate renewable diesel transmix biodiesel |
| CITGO - Meridian T-64-MS-2412 | Meridian, MS | 0.3 | gasoline jet fuel distillate renewable diesel transmix biodiesel |
| Hunt-Southland Refining Company T-64-MS-2418 | Heidelberg, MS | 40.2 | asphalt naphtha |
| Teppco Terrminaling and Marketing Company T-76-AL-0001 | Boligee, AL | 52.6 | unknown |
| Colonial Pipeline Collins T-64-MS-2426 | Collins, MS | 67.0 | gasoline jet fuel distillate renewable diesel transmix |
| Chevron USA Incorporated - Collins T-64-MS-2401 | Collins, MS | 68.3 | gasoline jet fuel distillate renewable diesel transmix |
| Kinder Morgan Southeast Terminals LLC T-64-MS-2402 | Collins, MS | 68.4 | gasoline jet fuel distillate renewable diesel transmix biodiesel |
| Equilon Enterprises LLC T-64-MS-2404 | Collins, MS | 68.5 | gasoline jet fuel distillate renewable diesel transmix |
| IMTT Epic LLC T-63-AL-2330 | Moundville, AL | 71.8 | gasoline jet fuel distillate biodiesel renewable diesel |
| Energy Transfer Hattiesburg NGLsLLC T-64-MS-2423 | Petal, MS | 74.2 | propane |
| Hunt Refining Company T-63-AL-2329 | Tuscaloosa, AL | 88.5 | unknown |
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.