Supply Explorer
Pipeline system

Flint Hills Resources

Flint Hills Resources, LP (Koch Industries)

gasoline distillate jet fuel
tariff points
1
origins
1
origin refineries
6
terminals served · 0 confirmed
0
published routes
0

Rates

Rates for this system haven’t been transcribed yet. Its tariffs are listed under Tariffs.

Tariff points

Origins and delivery points named in the tariffs, with the terminals linked to each.
PointTypeLocationProductsTerminals
Corpus Christi refineries (East and West) origin Corpus Christi, TX 0

Products & grades

gasoline

  • reformulated gasoline

distillate

  • ULSD

jet fuel

  • Jet A

Tariffs

3 tariffs on file — every rate and point on this page cites one of them.
TariffTypeTitleEffective
Magellan Texas No. 82.5.0 (third-party joint tariff) joint rates Magellan Pipeline Company / KPL South Texas joint tariff, Waco TX - Flint Hills Resources, L.P. Terminal to destinations in Texas 2023-07-01 PDF
RRC filing 2023-april-04-3718 other Texas RRC document titled 'Flint Hills Resources'. UNREADABLE: scanned PDF with no text layer PDF
FHR Pipelines web page (not a tariff) other Flint Hills Resources - Pipelines PDF

Fees & terms

Status & ownership

Status
In 2023 FHR announced a new pipeline from its Bastrop terminal (about 20 miles, 10-inch, along the Hwy 71 corridor, for jet fuel to Austin-Bergstrom). Its in-service status was not verified. No other conversions were found.
Ownership
Koch subsidiary. FHR operates about 4,000 miles of pipeline: the Texas Pipeline System (products from Corpus Christi); in the north, the Minnesota Pipe Line (crude), Wood River Pipeline (Hartford IL to St. Paul MN products), Wisconsin Pipeline and the MSP Airport jet line. Only the Texas system is relevant to the graph link.
Intrastate
The FHR Texas Pipeline System (Corpus Christi to San Antonio, Austin, Bastrop, Waco and DFW) is intrastate. No FHR T-4 tariff text could be read: the one RRC document found is scanned. The system may be operated as proprietary (shipper = FHR), which would mean no public rate tariff exists.
Research
LOW confidence

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.