CITGO Lemont Refinery
PDV Midwest Refining LLC (operates as CITGO Lemont Refinery) · CITGO Petroleum Corporation, via PDV Holding, Inc. · Lemont, IL
- bpd crude capacity · EIA 2026
- 188,023
- pipelines it injects into
- 2
- delivery points reachable
- 13
- terminals on those points
- 32
- events on record
- 2
Capability
Crude distillation 188,023 bpd operable, 188,023 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Conversion — makes gasoline and diesel from heavier oil
| Catalytic cracking (FCC) | 62,550 |
| Delayed coking | 37,098 |
Upgrading
| Catalytic reforming — high pressure | 32,220 |
| Vacuum distillation | 81,141 sd |
Treating — meets sulfur specs
| Hydrotreating — diesel | 97,160 sd |
| Hydrotreating — kerosene & jet | 13,700 sd |
| Hydrotreating — naphtha / reformer feed | 111,300 sd |
Production capacity
Crude slate
Mid-continent/Patoka-hub crude blend reaching Lemont via the Chicap system, likely combined with Canadian crude typical of Chicago-area refineries.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | Enbridge Mainline (Lakehead System) General sourcing on Chicago-area crude logistics is consistent with the graph's claim but I did not find a source naming Enbridge Mainline specifically for Lemont within budget. |
Western Canada | crude | inferred |
| crude in | pipeline | Chicap Pipeline A trade-press source states plainly that 'the Chicap Pipeline supplies CITGO's Lemont refinery in Lemont, IL.' This is a named crude route NOT currently present as a graph edge for this refinery -- likely a coverage gap. |
Patoka/Cushing hub crude blends | crude | source |
| products out | pipeline | Wolverine Pipeline Wolverine Pipe Line Company's own history describes a dedicated 41-mile, 16-inch pipeline built from the Lemont/Romeoville CITGO refinery to Hammond, IN, and Wolverine's mainline explicitly lists Lemont as one of its refinery origin points. This is a well-documented named products route NOT currently present as a graph edge for this refinery -- a clear coverage gap. |
Lemont, IL origin lateral | gasoline diesel | source |
| products out | marine | Chicago Sanitary & Ship Canal Refinery is authorized to discharge process/wastewater into the canal and is adjacent to it for logistics; a 2025-04 incident confirms an active liquid interface with the canal (see events). Barge product movement specifically was not separately confirmed within budget. |
Refinery site, Lemont/Romeoville, IL | refined products wastewater | source |
| products out | truck rack | Citgo - Lemont Self-evident refinery-direct rack. |
Refinery site | gasoline diesel | inferred |
Pipeline reach
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Wolverine Pipeline |
Lemont-Lockport, Will County, IL same city
|
7 | 16 | 74.41 | 210.43 |
| West Shore Pipeline |
Lemont (Will County), IL same city
|
6 | 16 | 89.78 | 145.10 |
Substitutes
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
West Shore Pipeline
- BP Products North America INC · Whiting, IN 435,000 bpd
- Exxonmobil Refining & Supply CO · Joliet, IL 267,000 bpd
Wolverine Pipeline
- BP Products North America INC · Whiting, IN 435,000 bpd
- Exxonmobil Refining & Supply CO · Joliet, IL 267,000 bpd
Events
-
2025-11-29
sale
Federal court approved Amber Energy Inc. (Elliott Investment Management affiliate) as acquirer of PDV Holding, Inc. (CITGO's parent), a sale formally approved 2025-12-02 -- a change of ultimate ownership for the Lemont refinery. source
-
2025-04
outage
CITGO reported a fuel line leak on a portable pump resulting in a diesel discharge/sheen into the Chicago Sanitary and Ship Canal at the Lemont refinery. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.