Martinez Refining Company (formerly Shell Martinez Refinery)
Martinez Refining Company LLC · PBF Energy Inc. · Martinez, CA
- bpd crude capacity · EIA 2026
- 156,400
- pipelines it injects into
- 1
- delivery points reachable
- 9
- terminals on those points
- 27
- events on record
- 5
Capability
Crude distillation 156,400 bpd operable, 156,400 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Conversion — makes gasoline and diesel from heavier oil
| Catalytic cracking (FCC) | 56,448 |
| Hydrocracking — distillate | 34,320 |
| Delayed coking | 25,996 |
| Fluid coking | 21,300 |
Upgrading
| Catalytic reforming — low pressure | 27,900 |
| Vacuum distillation | 101,000 sd |
Treating — meets sulfur specs
| Hydrotreating — gasoline | 90,000 sd |
| Hydrotreating — naphtha / reformer feed | 28,000 sd |
| Hydrotreating — heavy gas oil | 80,500 sd |
| Hydrotreating — other distillate | 49,500 sd |
Production capacity
Crude slate
Not specifically documented in sources reviewed; the refinery's high Nelson Complexity Index (16.1) and dual-coking configuration indicate capability to process heavy/sour crude grades typical of Bay Area refineries.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | marine | Martinez Refining Company deep-water marine terminal PBF's acquisition materials confirm the deal included 'a deep-water marine facility, product distribution terminals, and refinery crude and product storage facilities with approximately 8.8 million barrels of shell capacity' as on-site logistics assets of this refinery. |
Waterborne crude (domestic/international) | crude | source |
| products out | pipeline | Kinder Morgan SFPP (North Line) Kinder Morgan's SFPP North Line is described as fed by 'refineries in the San Francisco Bay Area, various pipelines and marine terminals,' with Richmond and Concord named as specific origin points -- plausible but not Martinez-specific. |
Not confirmed as Martinez specifically | gasoline distillate | source |
| products out | rack terminal | TransMontaigne Martinez Terminal TransMontaigne's Martinez Terminal (acquired from Plains All American in 2017/2018) lists inbound/outbound connections via SFPP pipeline, marine, and 'various refinery pipelines' -- consistent with receiving refined product from nearby refineries including this one, though not refinery-specific by name. |
2801 Waterfront Road, Martinez, CA | gasoline distillate jet fuel crude oil | source |
Pipeline reach
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Kinder Morgan SFPP |
Concord per research
|
9 | 27 | 39.31 | 54.41 |
Substitutes
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
Kinder Morgan SFPP
- Tesoro Refining & Marketing CO · Carson, CA 365,000 bpd
- Chevron USA INC · El Segundo, CA 285,000 bpd
- Chevron USA INC · Richmond, CA 245,271 bpd
- Torrance Refining CO LLC · Torrance, CA 160,000 bpd
- Valero Refining CO California · Benicia, CA 145,000 bpd idled
- Western Refining Company LP · El Paso, TX 133,000 bpd
- Ultramar INC · Wilmington Refinery, CA 85,000 bpd
Events
-
2025-06
other
Independent investigation report concluded the February 2025 fire was caused by human error stemming from poor contractor training and supervision. source
-
2025-03-06
turnaround
PBF announced two-stage restart plan: crude unit and other units in Q2 2025 (partial throughput 85,000-105,000 bpd), remaining units (including those scheduled for Q1 turnaround) by Q4 2025; ~$30M repair cost, largely insurance-covered. source
-
2025-02-01
fire
Major fire near the catalytic feed hydrotreater (root cause: contractors opened the wrong flange during turnaround prep, releasing and igniting intermediate reflux); refinery fully shut down; fire extinguished Feb 4; six workers evaluated by medical personnel. source
-
2023-11-19
fire
Furnace explosion/fire critically burned a contract worker; investigation found safety-system and alarm failures; approximately $350 million in property damage. source
-
2022
outage
Release of approximately 50,000 pounds of powdered industrial chemicals into the air. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.