Marathon Los Angeles Refinery (Carson Operations; formerly Tesoro Los Angeles Refinery)
Tesoro Refining & Marketing Company, LLC (dba Marathon Los Angeles Refinery) · Marathon Petroleum Corporation · Carson, CA
- bpd crude capacity · EIA 2026
- 365,000
- pipelines it injects into
- 1
- delivery points reachable
- 14
- terminals on those points
- 21
- events on record
- 3
Capability
Crude distillation 365,000 bpd operable, 365,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Conversion — makes gasoline and diesel from heavier oil
| Catalytic cracking (FCC) | 104,500 |
| Hydrocracking — distillate | 95,500 |
| Delayed coking | 103,700 |
Upgrading
| Catalytic reforming — high pressure | 79,000 |
| Vacuum distillation | 205,500 sd |
Treating — meets sulfur specs
| Hydrotreating — diesel | 24,000 sd |
| Hydrotreating — kerosene & jet | 28,500 sd |
| Hydrotreating — gasoline | 17,000 sd |
| Hydrotreating — naphtha / reformer feed | 79,000 sd |
| Hydrotreating — heavy gas oil | 147,000 sd |
Production capacity
Crude slate
California crude by pipeline, including heavy crude from the San Joaquin Valley and the Los Angeles Basin, plus Alaska North Slope, South American, West African and other international crude by ship through the Port of Long Beach.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | Onshore crude pipelines (not named) The 2025 Initial Study says crude oil, including California crude, can be delivered by pipeline from onshore locations such as oil production facilities and nearby third-party terminals. The pipelines are not named. |
California crude, including heavy crude from the San Joaquin Valley and the Los Angeles Basin | crude | source |
| crude in | marine | Berth 121 (Marine Terminal 1), Port of Long Beach Crude only. The berth has no storage, so crude is piped to the Carson Crude Terminal south of the plant, operated by Tesoro Logistics Operations LLC, and then to the Carson site's nine crude tanks. The 2017 Final EIR says the berth takes very large crude carriers of up to two million barrels. |
Waterborne crude. Marathon lists Alaska North Slope, South America, West Africa and other international sources for the refinery as a whole. | crude | source |
| crude in | marine | Marine Terminal 2 (Berths 76-78), Port of Long Beach The 2025 Initial Study says crude for the Carson Operations is unloaded at Berth 121 or the T-2 terminal and moved by pipeline to Port of Long Beach terminals or the Carson Crude Terminal. The 2017 Final EIR gives the terminal a tank farm of 34 tanks holding 1,800,000 barrels. |
Waterborne crude | crude | source |
| crude in | marine | Long Beach Terminal (Berths 84A and 86), Port of Long Beach Serves the Wilmington site of the same refinery. The 2025 Initial Study says crude for the Wilmington Operations is delivered by ship and moves by pipeline from the Tesoro Logistics Operations marine terminal at Berths 84A and 86. The 2017 Final EIR describes a 24-inch line into the Wilmington tanks. |
Waterborne crude | crude | source |
| products out | pipeline | Kinder Morgan SFPP Kinder Morgan's March 2025 Pacific Operations brochure draws Marathon Carson as a facility with a line into Watson Station and says Watson is entered by gathering lines into the breakout facility. Watson is the origin of the SFPP West Line and San Diego Line. The SFPP tariff names Watson as the origin, not the refinery. |
SFPP Watson Station, Carson, reached by a gathering line from the plant | gasoline distillate jet fuel | source |
| products out | pipeline | Calnev Pipeline There is no separate Calnev connection at the plant. The Calnev and SFPP joint tariff takes product from SFPP at Watson, routes it over SFPP to Colton and then over Calnev to Clark County, Nevada. The Kinder Morgan brochure lists Watson as a Calnev origin. |
Colton, reached over SFPP from Watson Station | gasoline distillate jet fuel | inferred |
| products out | pipeline | Marathon and third-party pipelines to distribution terminals and the Wilmington Operations The 2025 Initial Study says gasoline, diesel and jet fuel are routed to distribution terminals by pipeline, and that Marathon and third-party pipelines move intermediate and finished products between the Carson and Wilmington sites. The 2017 Final EIR says pipelines export the majority of the refinery's gasoline, jet fuel and diesel. The lines and the terminals they reach are not named. |
At the plant | gasoline distillate jet fuel | source |
| products out | truck rack | Marathon Los Angeles Refinery truck racks, Carson (Tesoro Logistics Operations LLC Carson Products Terminal) The 2017 Final EIR says the refinery uses permitted truck racks to send out gasoline, diesel, petroleum coke, sulfur and LPG. The 2025 Initial Study names a Tesoro Logistics Operations Carson Products Terminal next to the Carson Operations. An asphalt binder truck rack for up to four trucks at a time is proposed and not built. |
Carson | gasoline distillate petroleum coke sulfur lpg | source |
| products out | marine | Marine Terminal 2 (Berths 76-78), Port of Long Beach The 2017 Final EIR says the terminal's loading arms load petroleum products and crude oils and that three vessels can be loaded or discharged at once. The 2025 Initial Study says the Carson Operations move petroleum products by marine vessel. The grades loaded out are not listed. |
Port of Long Beach, by pipeline from the plant | source | |
| products out | rail | LPG rail rack, Carson Operations The 2017 Final EIR says the refinery ships and receives LPG by rail over a permitted LPG loading and unloading rack. Up to seven railcars a day of LPG were received in 2017. The 2025 Initial Study says no crude oil moves to the Carson Operations by rail. |
Carson | lpg | source |
Docks
The docks at this facility and, where a ship agent or port publishes it, the largest vessel each berth takes. Channel conditions change; these figures are a guide, not clearance to sail.
Berth 121 (Marine Terminal 1), Pier T · crude in
- Only crude oil is unloaded here.
- There is no storage at the berth. Crude is piped directly to the Carson Crude Terminal near the Carson Operations.
- The terminal also connects to other storage in the area, including Terminal 2.
- Takes very large crude carriers of up to two million barrels.
Source: South Coast AQMD Final EIR, Tesoro Los Angeles Refinery Integration and Compliance Project (May 2017), read 2026-10-11.
Marine Terminal 2 (Berths 76-78), Pier B · crude in, products out
- Crude for the Carson Operations is unloaded here or at Berth 121.
- Tank farm of 34 above ground tanks with 1,800,000 barrels of storage.
- Loading arms handle petroleum products and crude oils at 10,000 to 15,000 barrels per hour.
- Three vessels can be loaded or discharged at once.
Source: South Coast AQMD Final EIR, Tesoro Los Angeles Refinery Integration and Compliance Project (May 2017) ; South Coast AQMD Initial Study, Marathon Los Angeles Refinery Modernization Projects (November 2025), read 2026-10-11.
Long Beach Terminal (Berths 84A and 86) · crude in
- Crude oil, petroleum products and bunker fuel are unloaded here.
- A 24-inch pipeline runs to storage tanks at the Wilmington site, with a discharge capacity of 32,000 barrels per hour.
- Supplies crude to the Wilmington Operations of the refinery, not the Carson plant.
- Two vessels can be loaded or discharged at once.
Source: South Coast AQMD Final EIR, Tesoro Los Angeles Refinery Integration and Compliance Project (May 2017) ; South Coast AQMD Initial Study, Marathon Los Angeles Refinery Modernization Projects (November 2025), read 2026-10-11.
Pipeline reach
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Kinder Morgan SFPP |
Watson per research
|
14 | 21 | 14.58 | 107.43 |
Substitutes
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
Kinder Morgan SFPP
- Chevron USA INC · El Segundo, CA 285,000 bpd
- Chevron USA INC · Richmond, CA 245,271 bpd
- Torrance Refining CO LLC · Torrance, CA 160,000 bpd
- Martinez Refining CO LLC · Martinez, CA 156,400 bpd
- Western Refining Company LP · El Paso, TX 133,000 bpd
- Ultramar INC · Wilmington Refinery, CA 85,000 bpd
Events
-
2025-11
expansion
The South Coast AQMD issued a Notice of Preparation and Initial Study for the Marathon Los Angeles Refinery Modernization Projects. The projects include a new asphalt sales rack at the Carson site to load up to four trucks at a time with asphalt binder. source
-
2022
other
The coke calciner was shuttered. All petroleum coke now goes directly to the Port of Long Beach. source
-
2018
other
The fluid catalytic cracking unit at the Wilmington Operations was shut down. The refinery's remaining cracker is at the Carson Operations. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.