Supply Explorer
Fuels refinery

El Paso Refinery (Marathon Petroleum)

Marathon Petroleum Corporation · El Paso, TX

Operating PADD3 asphalt
Main refinery in El Paso, Texas
Main refinery in El Paso, Texas Photo: Dimples915 · CC BY-SA 3.0 · source
bpd crude capacity · EIA 2026
133,000
pipelines it injects into
2
delivery points reachable
4
terminals on those points
25
events on record
4

Capability

Crude distillation 133,000 bpd operable, 133,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.

Conversion — makes gasoline and diesel from heavier oil

Catalytic cracking (FCC) 33,300

Upgrading

Catalytic reforming — low pressure 29,500
Vacuum distillation 55,500 sd

Treating — meets sulfur specs

Hydrotreating — diesel 50,500 sd
Hydrotreating — kerosene & jet 9,500 sd
Hydrotreating — gasoline 38,500 sd
Hydrotreating — naphtha / reformer feed 34,000 sd

Production capacity

Alkylates · 14,000 Asphalt road oil · 4,000 Hydrogen mmcfd · 10 Isomerization isobutane · 3,500

Crude slate

Light, sweet crude oil from the Permian and Delaware Basins (West Texas/New Mexico); some sour WTS handled historically per older refinery profiles.

Crude in & products out

From refinery research; each row links its source.
DirectionModeRoutePoint / originProductsSource
crude in pipeline Kinder Morgan Wink-to-El Paso Pipeline
Historically the refinery's main crude supply line, carrying WTI-grade light sweet crude from the Midland Basin; capacity expanded to ~150,000 bpd in recent years.
Wink, TX / Midland Basin crude source
crude in pipeline Western Refining Delaware Basin gathering system
Western built a Delaware Basin gathering network of a 100,000 bpd pipeline plus a 38,000 bpd truck-unloading facility, together able to supply up to 138,000 bpd of WTI-grade crude, delivering into the Kinder Morgan Wink pipeline system for onward transport to the refinery.
Delaware Basin (Bone Springs/Avalon plays), West Texas/New Mexico crude source
products out pipeline SFPP East Line (Kinder Morgan)
Kinder Morgan's existing SFPP, L.P. East Line runs from El Paso, TX to Phoenix and Tucson, AZ and is a documented outbound refined-products route serving the El Paso market/refining complex; it is also the backbone the planned Western Gateway Pipeline project will extend westward.
El Paso, TX gasoline distillate source
products out truck rack El Paso refinery local distribution
Products are primarily distributed to the local/regional market including gasoline, propane, diesel, jet fuel and asphalt; ~400 refinery employees plus subcontractors run the North and South units.
El Paso, TX gasoline distillate jet fuel asphalt propane source

Pipeline reach

Where this refinery’s product can go by published tariff route from the points it injects at — what an outage here would touch.
PipelineInjects atDelivery pointsTerminalsLowest ¢/bblMedian ¢/bbl
Kinder Morgan SFPP
El Paso same city
4 25 88.83 160.74

Substitutes

Other refineries injecting into the same pipelines — the supply that could backfill an outage here.

Magellan Midstream

Events

Outages, fires, turnarounds, sales and closures — newest first.
  1. 2026-07 turnaround

    Reporting describes a $130 million turnaround completed/underway at the Marathon El Paso refinery. source

  2. 2025-11-18 outage

    Marathon began shutting down units at the refinery after a failure of the main fractionator reflux pump. source

  3. 2025-07-08 outage

    A third-party power outage triggered a five-hour flaring incident (three stacks) and a facility-wide shutdown; the refinery released 501 lbs of sulfur dioxide at 100% opacity; no injuries; nearby residents reported large smoke/fire plumes and said they were not alerted, prompting a community fact-check by El Paso Matters. source

  4. 2023-05-10 turnaround

    Marathon conducted a plant-wide maintenance turnaround at the 56,000 bpd El Paso North Refinery unit, expected to wrap up within the week. source

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.