Supply Explorer
Terminal

TransMontaigne - Charlotte/Paw Creek

7615 Old Mount Holly Road, P.O. Box 61, Charlotte, NC 28214

T-56-NC-2023 Rack market · Charlotte, NC gasoline jet fuel distillate renewable diesel transmix biodiesel
pipelines supplying
2
confirmed delivery points
1
lowest ¢/bbl into this terminal
78.25
terminals within 100 mi
26

Supplied by

Tariff delivery points this terminal sits on.

PipelineDelivery pointProductsMatchSource
Plantation Pipeline Charlotte, NC (Mecklenburg County) gasoline distillate confirmed FERC No. 155.49.0
Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) gasoline distillate jet fuel same city FERC 99.95.0
Plantation Pipeline Charlotte (Douglas Airport), NC jet fuel same city FERC No. 155.49.0

Can be sourced from

Published routes into this terminal’s delivery points, cheapest first · ¢/bbl line-haul
OriginPipeline or modeRefineries at origin¢/bblSource
Moundville (Hale County) AL Colonial Pipeline Hunt Refining CO 78.25 FERC 99.95.0
Collins (Covington County) MS Colonial Pipeline Valero Refining - Meraux LLC 99.91 FERC 99.95.0
Baton Rouge Dock Facility (W. Feliciana Parish) LA Colonial Pipeline junction or tank farm 118.12 FERC 99.95.0
Baton Rouge (E. Feliciana Parish) LA Colonial Pipeline Exxonmobil Refining & Supply CO
Placid Refining CO
118.12 FERC 99.95.0
Collins (Covington County) MS Plantation Pipeline volume_tier Valero Refining - Meraux LLC 120.06 FERC No. 155.49.0
Krotz Springs (St. Landry Parish) LA Colonial Pipeline Alon Refining Krotz Springs INC 122.93 FERC 99.95.0
Collins (Covington County) MS Plantation Pipeline volume_tier Valero Refining - Meraux LLC 129.31 FERC No. 155.49.0
Baton Rouge (East Baton Rouge Parish) or Pascagoula (Jackson County) LA/MS Plantation Pipeline volume_tier Exxonmobil Refining & Supply CO 135.90 FERC No. 155.49.0
Lake Charles (Calcasieu Parish) LA Colonial Pipeline Calcasieu Refining CO
Citgo Petroleum Corp
Phillips 66 Company
137.68 FERC 99.95.0
Hebert (Beaumont - Port Arthur) TX Colonial Pipeline Exxonmobil Refining & Supply CO 145.00 FERC 99.95.0
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA Plantation Pipeline volume_tier Exxonmobil Refining & Supply CO
Placid Refining CO
147.75 FERC No. 155.49.0
Pascagoula (Jackson County) MS Plantation Pipeline volume_tier Chevron USA INC 147.75 FERC No. 155.49.0
Collins (Covington County) MS Plantation Pipeline committed Valero Refining - Meraux LLC 151.05 FERC No. 159.10.0
Houston (Pasadena, Cedar Bayou) TX Colonial Pipeline Deer Park Refining LP
Exxonmobil Refining & Supply CO
Marathon Petroleum CO LP
Pasadena Refining Systems INC
Valero Refining CO Texas LP
Valero Refining CO Texas LP
156.35 FERC 99.95.0
Collins (Covington County) MS Plantation Pipeline Valero Refining - Meraux LLC 159.31 FERC No. 155.49.0
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) LA Plantation Pipeline proportional Marathon Petroleum CO LP
Shell Oil Products Us
163.44 FERC No. 155.49.0
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA Plantation Pipeline Exxonmobil Refining & Supply CO
Placid Refining CO
177.75 FERC No. 155.49.0
Pascagoula (Jackson County) MS Plantation Pipeline Chevron USA INC 177.75 FERC No. 155.49.0
Collins (Covington County) MS Plantation Pipeline Valero Refining - Meraux LLC 186.00 FERC No. 155.49.0
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA Plantation Pipeline Exxonmobil Refining & Supply CO
Placid Refining CO
203.51 FERC No. 155.49.0
Pascagoula (Jackson County) MS Plantation Pipeline Chevron USA INC 203.51 FERC No. 155.49.0
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts LA Plantation Pipeline committed Exxonmobil Refining & Supply CO
Placid Refining CO
237.14 FERC No. 159.10.0
Collins (Covington County) MS Plantation Pipeline committed Valero Refining - Meraux LLC 237.14 FERC No. 159.10.0
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) LA Plantation Pipeline volume_tier Marathon Petroleum CO LP
Shell Oil Products Us
238.79 FERC No. 156.29.0
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) LA Plantation Pipeline joint Marathon Petroleum CO LP
Shell Oil Products Us
268.79 FERC No. 156.29.0
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) LA Plantation Pipeline joint Marathon Petroleum CO LP
Shell Oil Products Us
294.55 FERC No. 156.29.0

Cost to serve this terminal by pipeline

What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.

Gasoline: product adder

¢/gal · product adder
6.62
¢/gal · line-haul tariff · published
3.72
¢/gal · carrying cost · calculated
0.96
¢/gal · pipeline loss · published
0.44
¢/gal · terminaling · estimate
1.50
days financed
18.4

Route used: from Houston on Colonial Pipeline to Charlotte/Charlotte Douglas Airport (FERC 99.95.0 item 170). 7 routes in the table show a lower figure. They start part-way along a pipeline or at a secondary origin, so they leave out the cost of getting product there and do not set this figure.

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 3.723 published Colonial Pipeline FERC 99.95.0 item 170: Houston (Pasadena, Cedar Bayou) → Charlotte/Charlotte Douglas Airport (Mecklenburg County), 156.35 ¢/bbl
Carrying cost 0.964 calculated $3.240000/gal × 5.8900% ÷ 365 × 18.435 days (10.935 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 1,050 pipeline miles at 4.0 mph (Colonial Pipeline public statements: about 4 mph on the mainlines, 5-day shipping cycles)
Pipeline loss 0.436 published Colonial Pipeline FERC 98.74.0 item 76, Product Loss Allocation charge: 18.31 ¢/bbl
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 6.622 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (12 of 12). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Moundville (Hale County) starts part-way along the line Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 1.86 0.65 0.44* 1.50 4.45 12.5 — FERC 99.95.0 item 230
Collins (Covington County) starts part-way along the line Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.38 0.74 0.44* 1.50 5.05 14.1 — FERC 99.95.0 item 230
Baton Rouge Dock Facility (W. Feliciana Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.81 0.82 0.44* 1.50 5.56 15.6 — FERC 99.95.0 item 230
Baton Rouge (E. Feliciana Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.81 0.82 0.44* 1.50 5.57 15.6 — FERC 99.95.0 item 230
Krotz Springs (St. Landry Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.93 0.83 0.44* 1.50 5.70 16.0 — FERC 99.95.0 item 170
Lake Charles (Calcasieu Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 3.28 0.89 0.44* 1.50 6.11 17.1 — FERC 99.95.0 item 170
Hebert (Beaumont - Port Arthur) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 3.45 0.92 0.44* 1.50 6.31 17.6 — FERC 99.95.0 item 170
Houston (Pasadena, Cedar Bayou) Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 3.72 0.96 0.44* 1.50 6.62 18.4 — FERC 99.95.0 item 170
Collins (Covington County) starts part-way along the line Plantation Pipeline Charlotte, NC (Mecklenburg County) 3.79 0.74 0.81* 1.50 6.84 14.2 0.22 FERC No. 155.49.0 item 10
Pascagoula (Jackson County) Plantation Pipeline Charlotte, NC (Mecklenburg County) 4.23 0.74 0.81* 1.50 7.28 14.2 0.66 FERC No. 155.49.0 item 10
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts Plantation Pipeline Charlotte, NC (Mecklenburg County) 4.23 0.82 0.81* 1.50 7.36 15.7 0.74 FERC No. 155.49.0 item 10
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) Plantation Pipeline joint rate Charlotte, NC (Mecklenburg County) 6.40 0.81 0.81* 1.50 9.52 15.5 2.90 FERC No. 156.29.0 item 10

Diesel: product adder

¢/gal · product adder
7.11
¢/gal · line-haul tariff · published
3.72
¢/gal · carrying cost · calculated
1.45
¢/gal · pipeline loss · published
0.44
¢/gal · terminaling · estimate
1.50
days financed
18.4

Route used: from Houston on Colonial Pipeline to Charlotte/Charlotte Douglas Airport (FERC 99.95.0 item 170). 7 routes in the table show a lower figure. They start part-way along a pipeline or at a secondary origin, so they leave out the cost of getting product there and do not set this figure.

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 3.723 published Colonial Pipeline FERC 99.95.0 item 170: Houston (Pasadena, Cedar Bayou) → Charlotte/Charlotte Douglas Airport (Mecklenburg County), 156.35 ¢/bbl
Carrying cost 1.455 calculated $4.890000/gal × 5.8900% ÷ 365 × 18.435 days (10.935 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 1,050 pipeline miles at 4.0 mph (Colonial Pipeline public statements: about 4 mph on the mainlines, 5-day shipping cycles)
Pipeline loss 0.436 published Colonial Pipeline FERC 98.74.0 item 76, Product Loss Allocation charge: 18.31 ¢/bbl
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 7.113 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (12 of 12). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Moundville (Hale County) starts part-way along the line Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 1.86 0.99 0.44* 1.50 4.78 12.5 — FERC 99.95.0 item 230
Collins (Covington County) starts part-way along the line Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.38 1.12 0.44* 1.50 5.43 14.1 — FERC 99.95.0 item 230
Baton Rouge Dock Facility (W. Feliciana Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.81 1.23 0.44* 1.50 5.98 15.6 — FERC 99.95.0 item 230
Baton Rouge (E. Feliciana Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.81 1.23 0.44* 1.50 5.98 15.6 — FERC 99.95.0 item 230
Krotz Springs (St. Landry Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 2.93 1.26 0.44* 1.50 6.12 16.0 — FERC 99.95.0 item 170
Lake Charles (Calcasieu Parish) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 3.28 1.35 0.44* 1.50 6.56 17.1 — FERC 99.95.0 item 170
Hebert (Beaumont - Port Arthur) secondary origin Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 3.45 1.39 0.44* 1.50 6.78 17.6 — FERC 99.95.0 item 170
Houston (Pasadena, Cedar Bayou) Colonial Pipeline Charlotte/Charlotte Douglas Airport (Mecklenburg County) 3.72 1.45 0.44* 1.50 7.11 18.4 — FERC 99.95.0 item 170
Collins (Covington County) starts part-way along the line Plantation Pipeline Charlotte, NC (Mecklenburg County) 3.79 1.12 1.22* 1.50 7.63 14.2 0.52 FERC No. 155.49.0 item 10
Pascagoula (Jackson County) Plantation Pipeline Charlotte, NC (Mecklenburg County) 4.23 1.12 1.22* 1.50 8.07 14.2 0.96 FERC No. 155.49.0 item 10
Baton Rouge (East Baton Rouge Parish), incl. Dock Station and Bengal/Marathon proportional receipts Plantation Pipeline Charlotte, NC (Mecklenburg County) 4.23 1.24 1.22* 1.50 8.19 15.7 1.08 FERC No. 155.49.0 item 10
Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) Plantation Pipeline joint rate Charlotte, NC (Mecklenburg County) 6.40 1.22 1.22* 1.50 10.35 15.5 3.23 FERC No. 156.29.0 item 10
Inputs and assumptions behind these figures
  • Product value (for carrying cost and loss only): the prior day's spot price. Gasoline: OilPriceAPI GASOLINE_RBOB_USD, 2026-10-17. Diesel: OilPriceAPI HEATING_OIL_USD, 2026-10-17. These are the New York Harbor futures benchmarks, not a Gulf Coast price.
  • Interest rate: SOFR 3.89% (2026-10-15) + 2.0 points.
  • Transit (estimate): straight-line miles between the tariff origin and delivery point × 1.15, at 4.0 mph unless the pipeline has its own figure.
  • Days financed (estimate): transit, plus half a 5-day shipping cycle waiting to lift (once for each pipeline on a two-pipeline route), plus 5 days of stock at the terminal.
  • Pipeline loss: the charge or volume deduction the tariff states, where it states one (marked *; a deduction is costed at the product value above). Otherwise an estimate of 0.10% of product value per pipeline, two for a joint rate; that includes pipelines that share out actual losses without publishing a figure, and tariffs that state no loss term.
  • Terminaling: the carrier's terminal charge where its tariff states one (marked *), otherwise a flat 1.5¢/gal estimate.
  • Which route sets the figure: the lowest one that starts at a supply origin. On Colonial that is Houston. A rate that starts part-way along a pipeline, or at a secondary origin, stays in the table but does not set the figure. Where a rate starts at a point another carrier delivers to, the first carrier's lowest rate into that point is added, with its loss and time in the pipe; terminaling is charged once. The same is done where one pipeline files the movement as two rates. Which origins are treated this way is our own review of each system, not a statement in a tariff.
  • Rates used: each pipeline's ordinary filed rate. Committed, volume-tier, discount and bid rates are left out, as are conditional fees (shown on each pipeline page), additives, taxes and the value of line space.
  • Assumption set in force from 2026-10-01; review by 2027-01-01.

Stored snapshots of the product adder

Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.

Snapshot Product Route Adder ¢/gal What moved
2026-10-14 Diesel Houston · Colonial Pipeline 7.12 no change
2026-10-14 Gasoline Houston · Colonial Pipeline 6.62 no change
2026-10-11 Diesel Houston · Colonial Pipeline 7.05 pipeline loss −0.76¢; line-haul −0.51¢
2026-10-11 Gasoline Houston · Colonial Pipeline 6.63 line-haul −0.51¢; pipeline loss −0.38¢
2026-10-09 Diesel Pascagoula · Plantation Pipeline 8.03 first snapshot
2026-10-09 Gasoline Pascagoula · Plantation Pipeline 7.30 first snapshot

Terminals within 100 miles

TerminalCityMilesProducts (inferred from supply)
Marathon Petroleum, LLC T-56-NC-2008 Charlotte, NC 0.2 gasoline jet fuel distillate renewable diesel transmix biodiesel
CITGO - Charlotte T-56-NC-2001 Charlotte, NC 0.2 gasoline jet fuel distillate renewable diesel transmix biodiesel
Colonial Terminals Operating Company T-56-NC-2003 Charlotte, NC 0.2 gasoline jet fuel distillate renewable diesel transmix biodiesel
Kinder Morgan Southeast Terminals LLC T-56-NC-2026 Charlotte, NC 0.3 gasoline jet fuel distillate renewable diesel transmix biodiesel
Kinder Morgan Southeast Terminals LLC T-56-NC-2000 Charlotte, NC 0.3 gasoline jet fuel distillate renewable diesel transmix biodiesel
GLOBAL COMPANIES, LLC T-56-NC-2007 Charlotte, NC 0.3 gasoline jet fuel distillate renewable diesel transmix biodiesel
GLOBAL COMPANIES, LLC T-56-NC-2005 Charlotte, NC 0.4 gasoline jet fuel distillate renewable diesel transmix biodiesel
Buckeye Terminals, LLC - Charlotte II T-56-NC-2024 Charlotte, NC 0.4 gasoline jet fuel distillate renewable diesel transmix biodiesel
Buckeye Terminals, LLC - Charlotte I T-56-NC-2006 Charlotte, NC 0.5 gasoline jet fuel distillate renewable diesel transmix biodiesel
Kinder Morgan Southeast Terminals LLC T-56-NC-2004 Charlotte, NC 0.5 gasoline jet fuel distillate renewable diesel transmix biodiesel
Aircraft Service International Inc. T-56-NC-2032 Charlotte, NC 3.5 gasoline jet fuel distillate renewable diesel transmix biodiesel
Charlotte T-56-NC-2002 Charlotte, NC 7.4 gasoline jet fuel distillate renewable diesel transmix biodiesel
Buckeye Terminals, LLC T-57-SC-2052 Spartansburg, SC 58.0 gasoline jet fuel distillate renewable diesel transmix biodiesel
CITGO - Spartanburg T-57-SC-2077 Spartanburg, SC 58.4 gasoline jet fuel distillate renewable diesel transmix biodiesel
US Ventures T-57-SC-2076 Spartanburg, SC 58.5 gasoline jet fuel distillate renewable diesel transmix biodiesel
GLOBAL COMPANIES, LLC T-57-SC-2075 Spartanburg, SC 58.6 gasoline jet fuel distillate renewable diesel transmix biodiesel
US Ventures T-57-SC-2068 Spartanburg, SC 58.7 gasoline jet fuel distillate renewable diesel transmix biodiesel
Kinder Morgan Southeast Terminals LLC T-57-SC-2074 Spartanburg, SC 59.0 gasoline jet fuel distillate renewable diesel transmix biodiesel
TransMontaigne - Spartansburg T-57-SC-2067 Spartanburg, SC 62.4 gasoline jet fuel distillate renewable diesel transmix biodiesel
GLOBAL COMPANIES, LLC T-56-NC-2021 Greensboro, NC 74.8 gasoline jet fuel distillate renewable diesel transmix biodiesel
Kinder Morgan Southeast Terminals LLC T-56-NC-2015 Greensboro, NC 78.7 gasoline jet fuel distillate renewable diesel transmix biodiesel
Kinder Morgan Southeast Terminals LLC T-56-NC-2014 Greensboro, NC 78.9 gasoline jet fuel distillate renewable diesel transmix biodiesel
Buckeye Terminals, LLC - Greensboro II T-56-NC-2011 Greensboro, NC 78.9 gasoline jet fuel distillate renewable diesel transmix biodiesel
Buckeye Terminals, LLC - Greensboro I T-56-NC-2020 Greensboro, NC 79.1 gasoline jet fuel distillate renewable diesel transmix biodiesel
TransMontaigne - Greensboro T-56-NC-2022 Greensboro, NC 79.1 gasoline jet fuel distillate renewable diesel transmix biodiesel
Petroleum Fuel & Terminal Company T-56-NC-2019 Greensboro, NC 79.2 gasoline jet fuel distillate renewable diesel transmix biodiesel

Delivered ethanol cost

Estimate over Chicago ethanol (CHI)
+24.50¢/gal

From ADM Decatur IL (Decatur, IL) by NS single tank car, Decatur, IL → Charlotte, NC: about 738 rail miles and 8.4 days in transit, then transload and truck to the rack.

Origin plant page →

Assumptions: TOE (Round 2 adders, realistic transit)

Cost line¢/galHow
Basis -5.50 table · Origin-state discount to Chicago
Rail tariff +22.98 published · NSRQ 70120 item 1000
Rail car lease +4.15 calculated · 1,300/month, 10 + 2 + 2 × 8.36 days
Fuel surcharge +0.00 not applicable · Tariff: not subject to fuel surcharge
Transload +0.00 in the rate · Rate includes transload at the TBT
Truck freight +1.25 flat · Transload to terminal
Wholesale margin +0.00 flat
Terminal charge +1.15 flat · Terminaling estimate
Carrying cost +0.48 calculated · $2.262 × 5% ÷ 365 × (8.36 + 7 days)
Delivered over CHI+24.50
  • Built on an unescalated rate: NSRQ 70120 dates from 2018-01-02, "subject to future increases".
  • 4 plant(s) in KY, PA, TN not costed: no basis to Chicago on record for those states.

Options compared

OriginMoveDaysBasis ¢Delivered ¢/gal
ADM Decatur IL Decatur, IL NS · Decatur, IL → Charlotte, NC 8.4 -5.50 +24.50
One Earth Energy LLC Gibson City, IL NS · Bloomington, IL → Charlotte, NC 8.4 -5.50 +25.46
Crysalis Biosciences Inc Sauget, IL NS · St. Louis, MO → Charlotte, NC 8.4 -5.50 +25.47
Marquis Energy LLC Hennepin, IL NS · Kankakee, IL → Charlotte, NC 8.6 -5.50 +25.65
Show Me Ethanol Carrollton, MO NS · Kansas City, MO → Charlotte, NC 9.1 -5.50 +26.60
Guardian Lima LLC Lima, OH NS · Sandusky, OH → Charlotte, NC 6.4 +0.00 +29.16
Cardinal Ethanol LLC Union City, IN NS · Muncie, IN → Charlotte, NC 6.4 +0.00 +29.49
POET Biorefining - Shelbyville LLC Shelbyville, IN NS · Marion, IN → Charlotte, NC 6.4 +0.00 +29.61
POET Biorefining - Leipsic LLC Leipsic, OH NS · Ft Wayne, IN → Charlotte, NC 6.5 +0.00 +29.66
South Bend Ethanol LLC South Bend, IN NS · Elkhart, IN → Charlotte, NC 8.3 +0.00 +30.46

Published rail rates into this terminal

Destination rate group: Charlotte, NC (NS) (Charlotte is a listed station). Published single-car tank-car rates from the ethanol plants in each origin group, cheapest first — ¢/gal at 30,000 gal a car, line haul only. Delivery here assumes a rail or transload point in the group, then truck to the rack.

NSRQ 70120 price authority effective January 2, 2018, "subject to future increases" — current NS prices are published only through AccessNS. Not subject to fuel surcharge (note G556). Lanes to Norcross GA, Spartanburg SC, Alexandria VA and Pineville NC include transloading at the TBT (notes P949-P952).

From rate groupRailroad$/car¢/galEthanol plants in the groupTariff
Knoxville, TN NS 4,923 16.41 Primary Products Investments LLC Loudon, TN
NSRQ 70120 item 1000
Driftwood, PA NS 6,330 21.10 Pennsylvania Grain Prcsg LLC Clearfield, PA
NSRQ 70120 item 1000
Sandusky, OH NS 6,827 22.76 POET Biorefining - Fostoria LLC Fostoria, OH
Guardian Lima LLC Lima, OH
NSRQ 70120 item 1000
Decatur, IL NS 6,894 22.98 ADM Decatur IL Decatur, IL
NSRQ 70120 item 1000
Muncie, IN NS 6,930 23.10 Cardinal Ethanol LLC Union City, IN
POET Biorefining - Portland LLC Portland, IN
POET Biorefining - Alexandria LLC Alexandria, IN
NSRQ 70120 item 1000
Ft Wayne, IN NS 6,967 23.22 The Andersons Marathon Holdings LLC Logansport, IN
Valero Renewable Fuels LLC Bluffton, IN
POET Biorefining - Leipsic LLC Leipsic, OH
NSRQ 70120 item 1000
Marion, IN NS 6,967 23.22 POET Biorefining - North Manchester LLC North Manchester, IN
POET Biorefining - Shelbyville LLC Shelbyville, IN
Central Indiana Ethanol LLC Marion, IN
NSRQ 70120 item 1000
Elkhart, IN NS 7,035 23.45 South Bend Ethanol LLC South Bend, IN
NSRQ 70120 item 1000
Louisville, KY NS 7,035 23.45 Parallel Products Inc Louisville, KY
NSRQ 70120 item 1000
Chicago, IL NS 7,035 23.45 Chicago index barrels (CHI) NSRQ 70120 item 1000
St. Louis, MO NS 7,178 23.93 Green Plains Madison LLC Madison, IL
Crysalis Biosciences Inc Sauget, IL
NSRQ 70120 item 1000
Bloomington, IL NS 7,178 23.93 One Earth Energy LLC Gibson City, IL
Biourja Renewables LLC Peoria, IL
NSRQ 70120 item 1000
Lansing, MI NS 7,178 23.93 The Andersons Marathon Holdings LLC Albion, MI
Carbon Green Bioenergy LLC Lake Odessa, MI
NSRQ 70120 item 1000
Kankakee, IL NS 7,212 24.04 Marquis Energy LLC Hennepin, IL
NSRQ 70120 item 1000
Kansas City, MO NS 7,456 24.85 Show Me Ethanol Carrollton, MO
NSRQ 70120 item 1000
Evansville, IN NS 8,092 26.97 Green Plains Mount Vernon LLC Mount Vernon, IN
Valero Renewable Fuels LLC Mt Vernon, IN
Grain Processing Corp Washington, IN
NSRQ 70120 item 1000