PBF Toledo Refinery
Toledo Refining Company LLC · PBF Energy Inc. (via PBF Holding Company LLC) · Toledo, OH
- bpd crude capacity · EIA 2026
- 150,800
- pipelines it injects into · +1 same-city tariff origins
- 2
- delivery points reachable
- 54
- terminals on those points
- 82
- events on record
- 5
Capability
Crude distillation 150,800 bpd operable, 150,800 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Conversion — makes gasoline and diesel from heavier oil
| Catalytic cracking (FCC) | 51,803 |
| Hydrocracking — gas oil | 30,661 |
| Delayed coking | 30,193 |
Upgrading
| Catalytic reforming — low pressure | 39,624 |
| Vacuum distillation | 72,500 sd |
Treating — meets sulfur specs
| Hydrotreating — diesel | 22,500 sd |
| Hydrotreating — naphtha / reformer feed | 42,000 sd |
| Hydrotreating — heavy gas oil | 53,000 sd |
Production capacity
Crude slate
Light, sweet crudes from Canada, the Mid-Continent, the Bakken region and the U.S. Gulf Coast.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | Marysville Pipeline PBF's 10-K for fiscal 2025 says the refinery sources crude and feedstock through connections to the Marysville Pipeline and the Maumee Pipeline. |
Not stated in the filing | crude | source |
| crude in | pipeline | Maumee Pipeline PBF's 10-K for fiscal 2025 names the Maumee Pipeline as one of the refinery's two crude connections. The filing does not name the line's owner or say which crude route arrives over it. |
Not stated in the filing | crude | source |
| crude in | pipeline | Enbridge PBF's 10-K for fiscal 2025 lists Enbridge from the north as one of three primary pipelines delivering crude to the refinery. The filing does not name the Enbridge line. |
From the north | crude | source |
| crude in | pipeline | Pipeline from Patoka PBF's 10-K for fiscal 2025 lists Patoka from the west as one of three primary pipelines delivering crude to the refinery. The carrying pipeline is not named. |
Patoka, from the west | crude | source |
| crude in | pipeline | Mid-Valley Pipeline PBF's 10-K for fiscal 2025 lists Mid-Valley from the south as one of three primary pipelines delivering crude to the refinery. |
From the south | crude | source |
| crude in | truck | Crude truck unloading facility PBF's 10-K for fiscal 2025 says crude from local sources is delivered by truck to a truck unloading facility within the refinery. |
Local sources | crude | source |
| crude in | rail | Crude by rail to a nearby terminal PBF's 10-K for fiscal 2025 says crude is also delivered by rail to a nearby terminal, not to the plant itself. The terminal and the railroad are not named. |
Not stated in the filing | crude | source |
| products out | truck rack | Toledo Tank Farm truck loading facility SEC filings describe a truck loading facility and propane storage/loading bullets at the Toledo Tank Farm adjoining the refinery. |
Toledo refinery | propane gasoline distillate | source |
| products out | truck rack | PBF Logistics Products Terminals LLC truck rack (IRS T-34-OH-3161) The IRS terminal list carries T-34-OH-3161 under PBF Logistics Products Terminals LLC at 1601 Woodvalle Road, Toledo, OH 43605 (the IRS spelling). The list does not give the products loaded. |
Toledo, OH | source | |
| products out | rail | Toledo Rail Products Facility A rail loading and unloading facility at the refinery, transferred to PBF Logistics LP in a 2018 contribution transaction. PBF's 10-K for fiscal 2025 says most of the refinery's petrochemicals (benzene, toluene, xylene, nonene and tetramer) are distributed by rail. The railroad is not named. |
Toledo refinery | gasoline distillate petrochemical feedstocks | source |
| products out | pipeline | Buckeye Pipeline PBF's 10-K for fiscal 2025 says the refinery's finished products are transported on pipelines owned by Buckeye Partners L.P. Buckeye's directory of connecting facilities, effective November 2024, lists PBF under Toledo. |
Toledo. The sources do not say whether the connection is at the plant or at the tank farm. | gasoline distillate jet fuel | source |
| products out | pipeline | Sunoco Pipeline PBF's 10-K for fiscal 2025 says the refinery's finished products are transported on pipelines owned by Sunoco Logistics Partners L.P., the name the filing uses. The filing also says the refinery has proprietary connections to smaller pipelines and spurs, which it does not name. |
Toledo. The filing does not say whether the connection is at the plant or at the tank farm. | gasoline distillate jet fuel | source |
Pipeline reach
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Buckeye Pipeline |
Toledo per research
|
25 | 46 | 37.92 | 258.13 |
| Sunoco / Energy Transfer |
Toledo per research
|
20 | 24 | 77.93 | 291.36 |
| Inland Corporation |
Toledo (incl. Cedar Point) same city
|
9 | 12 | 14.70 | 163.99 |
Substitutes
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
Buckeye Pipeline
- Wrb Refining LP · Wood River, IL 345,000 bpd
- Phillips 66 Company · Linden, NJ 275,000 bpd
- Monroe Energy LLC · Trainer, PA 190,000 bpd
- Lima Refining Company · Lima, OH 183,000 bpd
- Bp-Husky Refining LLC · Toledo, OH 172,800 bpd
- Paulsboro Refining CO LLC · Paulsboro, NJ 160,000 bpd
- Marathon Petroleum CO LP · Detroit, MI 146,000 bpd
Inland Corporation
- Lima Refining Company · Lima, OH 183,000 bpd
- Bp-Husky Refining LLC · Toledo, OH 172,800 bpd
Sunoco / Energy Transfer
- Motiva Enterprises LLC · Port Arthur, TX 656,400 bpd
- Exxonmobil Refining & Supply CO · Beaumont, TX 612,000 bpd
- Premcor Refining Group INC · Port Arthur, TX 385,000 bpd
- Phillips 66 Company · Linden, NJ 275,000 bpd
- Totalenergies Petrochem & Refg USA · Port Arthur, TX 238,000 bpd
- Bp-Husky Refining LLC · Toledo, OH 172,800 bpd
- Paulsboro Refining CO LLC · Paulsboro, NJ 160,000 bpd
Events
-
2026-07
turnaround
PBF deferred the planned Q4 2026 Toledo turnaround to 2027: 'after further diligent review, we elected to move the planned fourth quarter turnarounds at both Chalmette and Toledo to 2027.' source
-
2026-02-05
other
WTOL: 'Steelworkers rally outside Toledo Refining Company as contract deadline nears' (Feb 5, 2026), followed by 'Negotiations continue between steelworkers and Toledo Refining Company' (Feb 7, 2026). This was a USW local contract negotiation, and no strike or lockout was reported in the items seen. Headlines only, seen in a Google News RSS listing. source
-
2026-01-06
turnaround
PBF 2026 guidance: a 50-60 day Q4 2026 turnaround planned at the 180,000 b/d Toledo refinery, involving the FCC unit; Toledo expected to average 135,000-145,000 b/d in 2026. source
-
2026
outage
PBF: 'During the second quarter, we performed unplanned work at Toledo which afforded us the opportunity to safely extend the run-time for our FCC complex.' Q2 2026 Toledo throughput was 132.1 kb/d vs 165.6 kb/d in Q2 2025. source
-
2023-10-31
other
WTVG: 'Toledo Refining Company warns of possible harmless odor during project work'. This was planned project or maintenance work in late Oct 2023. Headline only, seen in a Google News RSS listing. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.