Supply Explorer
Fuels refinery

Valero Port Arthur Refinery

Premcor Refining Group Inc. (operating subsidiary of Valero Refining Company / Valero Energy) · Valero Energy Corporation · Port Arthur, TX

Operating PADD3 heavy sour upgrading diesel petcoke
Aerial view of the site Imagery: USDA, USGS The National Map (public domain)
bpd crude capacity · EIA 2026
385,000
pipelines it injects into
4
delivery points reachable
58
terminals on those points
111
events on record
4

Capability

Crude distillation 385,000 bpd operable, 385,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.

Conversion — makes gasoline and diesel from heavier oil

Catalytic cracking (FCC) 73,050
Hydrocracking — gas oil 124,350
Delayed coking 142,440

Upgrading

Catalytic reforming — low pressure 50,870
Vacuum distillation 220,000 sd

Treating — meets sulfur specs

Hydrotreating — diesel 104,600 sd
Hydrotreating — kerosene & jet 33,000 sd
Hydrotreating — gasoline 90,000 sd
Hydrotreating — naphtha / reformer feed 58,000 sd
Hydrotreating — heavy gas oil 60,000 sd

Production capacity

Alkylates · 20,000 Petcoke market · 52,325 Sulfur short tons day · 2,178

Crude slate

Heavy sour crude: Canadian oil sands (WCS), Mexican Maya, and increasingly Venezuelan heavy crude as sanctions have eased, per East Daley Analytics; the 2023 coker project specifically increased Valero's ability to upgrade heavy, high-resid slates.

Crude in & products out

From refinery research; each row links its source.
DirectionModeRoutePoint / originProductsSource
crude in marine Sabine-Neches Waterway
Deepwater channel access shared by Beaumont/Port Arthur refineries.
Waterborne imports (Venezuelan/Mexican/Canadian heavy sour, per Valero disclosures) crude source
crude in pipeline Nederland to Port Arthur crude pipeline
RBN Energy states Nederland terminal has direct pipeline connections to the Valero and Total Port Arthur refineries in addition to Motiva and ExxonMobil Beaumont.
Nederland Terminal (Sunoco/Energy Transfer) crude source
crude in pipeline Keystone Pipeline
Keystone/Marketlink barrels reach the Nederland hub; the Port Neches Link spur was purpose-built for Motiva specifically, so a direct Keystone-to-Valero-PA connection is plausible via Nederland terminal blending/redelivery but not separately confirmed by a Valero-specific source.
South Bow Keystone Nederland Delivery Station crude source
products out truck rack Valero LP refinery rack
Refinery-direct truck rack; self-evident for an operating Valero refinery of this scale.
Refinery site gasoline distillate source

Pipeline reach

Where this refinery’s product can go by published tariff route from the points it injects at — what an outage here would touch.
PipelineInjects atDelivery pointsTerminalsLowest ¢/bblMedian ¢/bbl
Explorer Pipeline
Port Arthur (Jefferson County, TX) same city
31 31 96.30 334.80
Enterprise / TEPPCO
North Port Arthur (Jefferson Co., TX) - interconnect with Enterprise Refined Products storage same city
15 58 204.70 351.08
Magellan Midstream
Port Arthur / Port Neches, TX (via Explorer) same city
9 19 603.88 686.75
Colonial Pipeline
Port Arthur Products Station same city
Port Arthur Products Station / Total tie-in Port Neches (FERC 3.33.0) same city
3 3 20.13 26.39

Substitutes

Other refineries injecting into the same pipelines — the supply that could backfill an outage here.

Colonial Pipeline

Enterprise / TEPPCO

Magellan Midstream

Events

Outages, fires, turnarounds, sales and closures — newest first.
  1. 2026-09 outage

    Power outage following storm Edouard hit the Port Arthur refinery; smaller AVU-147 crude unit was shut and the larger AVU-146 CDU ran at minimum rates. source

  2. 2026-03-23 outage

    Explosion and ~5-hour fire at the diesel hydrotreater (unforeseen process-fluid release) forced a full shutdown of the 380,000-435,000 bpd refinery; no injuries reported. Partial restart underway through April 2026; diesel hydrotreater rebuild timeline unknown as of late April 2026, kerosene hydrotreater targeted for Q3 2026. source

  3. 2024-12 fire

    A fire was reported at Valero's Port Arthur plant (referenced retrospectively by trade press covering the 2026 explosion); details of scope/duration not independently found within budget. source

  4. 2023 expansion

    Valero completed a coker project at Port Arthur, raising crude throughput capacity to ~435,000 bpd and improving heavy/high-resid crude upgrading capability. source

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.