Supply Explorer
Terminal

Lucknow Highspire Terminal

Burns Avenue, Altoona, PA 16603

T-25-PA-1767 Rack market · Altoona, PA gasoline distillate
pipelines supplying
1
confirmed delivery points
1
lowest ¢/bbl into this terminal
107.34
terminals within 100 mi
23

Supplied by

Tariff delivery points this terminal sits on.

PipelineDelivery pointProductsMatchSource
Buckeye Pipeline ELDORADO (b) gasoline distillate confirmed FERC No. 442.42.0

Can be sourced from

Published routes into this terminal’s delivery points, cheapest first · ¢/bbl line-haul
OriginPipeline or modeRefineries at origin¢/bblSource
Chelsea Jct. PA Buckeye Pipeline Monroe Energy LLC 107.34 FERC No. 442.42.0
Booth PA Buckeye Pipeline junction or tank farm 140.71 FERC No. 442.42.0
Eagle Point NJ Buckeye Pipeline junction or tank farm 155.61 FERC No. 442.42.0
Linden NJ Buckeye Pipeline incentive Phillips 66 Company 167.95 FERC No. 442.42.0
Macungie PA Buckeye Pipeline junction or tank farm 169.20 FERC No. 442.42.0
Paulsboro NJ Buckeye Pipeline Paulsboro Refining CO LLC 189.81 FERC No. 442.42.0
Linden NJ Buckeye Pipeline Phillips 66 Company 189.81 FERC No. 442.42.0
Midland PA Buckeye Pipeline uncommitted-tier2 junction or tank farm 381.08 FERC No. 460.11.0
Midland PA Buckeye Pipeline uncommitted-tier1 junction or tank farm 390.64 FERC No. 460.11.0
Midland PA Buckeye Pipeline uncommitted-base junction or tank farm 398.78 FERC No. 460.11.0
Midland PA Buckeye Pipeline committed-tier2 junction or tank farm 408.75 FERC No. 460.11.0
Midland PA Buckeye Pipeline committed-tier1 junction or tank farm 418.99 FERC No. 460.11.0
Toledo OH Buckeye Pipeline uncommitted-tier2 Bp-Husky Refining LLC
Toledo Refining CO LLC
472.64 FERC No. 460.11.0
Findlay OH Buckeye Pipeline uncommitted-tier2 junction or tank farm 472.65 FERC No. 460.11.0
Lima OH Buckeye Pipeline uncommitted-tier2 Lima Refining Company 472.66 FERC No. 460.11.0
Detroit MI Buckeye Pipeline uncommitted-tier2 Marathon Petroleum CO LP 478.02 FERC No. 460.11.0
Woodhaven MI Buckeye Pipeline uncommitted-tier2 junction or tank farm 478.05 FERC No. 460.11.0
Toledo OH Buckeye Pipeline uncommitted-tier1 Bp-Husky Refining LLC
Toledo Refining CO LLC
484.48 FERC No. 460.11.0
Findlay OH Buckeye Pipeline uncommitted-tier1 junction or tank farm 484.49 FERC No. 460.11.0
Lima OH Buckeye Pipeline uncommitted-tier1 Lima Refining Company 484.52 FERC No. 460.11.0
Findlay OH Buckeye Pipeline uncommitted-base junction or tank farm 487.25 FERC No. 460.11.0
Detroit MI Buckeye Pipeline uncommitted-tier1 Marathon Petroleum CO LP 490.01 FERC No. 460.11.0
Woodhaven MI Buckeye Pipeline uncommitted-tier1 junction or tank farm 490.04 FERC No. 460.11.0
Lima OH Buckeye Pipeline uncommitted-base Lima Refining Company 496.23 FERC No. 460.11.0
Toledo OH Buckeye Pipeline uncommitted-base Bp-Husky Refining LLC
Toledo Refining CO LLC
496.23 FERC No. 460.11.0
Detroit MI Buckeye Pipeline uncommitted-base Marathon Petroleum CO LP 502.64 FERC No. 460.11.0
Woodhaven MI Buckeye Pipeline uncommitted-base junction or tank farm 502.64 FERC No. 460.11.0
Toledo OH Buckeye Pipeline committed-tier2 Bp-Husky Refining LLC
Toledo Refining CO LLC
506.65 FERC No. 460.11.0
Findlay OH Buckeye Pipeline committed-tier2 junction or tank farm 506.66 FERC No. 460.11.0
Lima OH Buckeye Pipeline committed-tier2 Lima Refining Company 506.67 FERC No. 460.11.0
Detroit MI Buckeye Pipeline committed-tier2 Marathon Petroleum CO LP 512.40 FERC No. 460.11.0
Woodhaven MI Buckeye Pipeline committed-tier2 junction or tank farm 512.42 FERC No. 460.11.0
Toledo OH Buckeye Pipeline committed-tier1 Bp-Husky Refining LLC
Toledo Refining CO LLC
519.30 FERC No. 460.11.0
Findlay OH Buckeye Pipeline committed-tier1 junction or tank farm 519.32 FERC No. 460.11.0
Lima OH Buckeye Pipeline committed-tier1 Lima Refining Company 519.33 FERC No. 460.11.0
Detroit MI Buckeye Pipeline committed-tier1 Marathon Petroleum CO LP 525.21 FERC No. 460.11.0
Woodhaven MI Buckeye Pipeline committed-tier1 junction or tank farm 525.25 FERC No. 460.11.0

Cost to serve this terminal by pipeline

What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.

Gasoline: product adder

¢/gal · product adder
4.87
¢/gal · line-haul tariff · published
2.56
¢/gal · carrying cost · calculated
0.49
¢/gal · pipeline loss · estimate
0.32
¢/gal · terminaling · estimate
1.50
days financed
9.5

Route used: from Chelsea Jct. on Buckeye Pipeline to ELDORADO (FERC No. 442.42.0).

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 2.556 published Buckeye Pipeline FERC No. 442.42.0: Chelsea Jct. → ELDORADO (b), 107.34 ¢/bbl
Carrying cost 0.495 calculated $3.240000/gal × 5.8900% ÷ 365 × 9.465 days (1.965 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 189 pipeline miles at 4.0 mph (general estimate)
Pipeline loss 0.324 estimate flat estimate $0.0032/gal, applied 1 time
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 4.875 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (12 of 12). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Chelsea Jct. Buckeye Pipeline ELDORADO (b) 2.56 0.49 0.32 1.50 4.87 9.5 — FERC No. 442.42.0 effective 2025: check for a newer filing
Booth Buckeye Pipeline ELDORADO (b) 3.35 0.49 0.32 1.50 5.67 9.5 0.79 FERC No. 442.42.0 effective 2025: check for a newer filing
Eagle Point Buckeye Pipeline ELDORADO (b) 3.71 0.50 0.32 1.50 6.03 9.6 1.16 FERC No. 442.42.0 effective 2025: check for a newer filing
Paulsboro Buckeye Pipeline ELDORADO (b) 4.52 0.50 0.32 1.50 6.84 9.6 1.97 FERC No. 442.42.0 effective 2025: check for a newer filing
Linden Buckeye Pipeline ELDORADO (b) 4.52 0.53 0.32 1.50 6.87 10.1 2.00 FERC No. 442.42.0 effective 2025: check for a newer filing
Point Breeze Sunoco / Energy Transfer, then at Macungie: Buckeye Pipeline two pipelines ELDORADO (b) 7.26 0.65 0.65 1.50 10.06 12.3 5.18 FERC No. 175.36.0 + FERC No. 442.42.0 effective 2025: check for a newer filing
Midland Buckeye Pipeline ELDORADO (b) 9.49 0.46 0.32 1.50 11.78 8.8 6.90 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Findlay starts part-way along the line Buckeye Pipeline ELDORADO (b) 11.60 0.57 0.32 1.50 13.99 10.8 9.12 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Toledo Buckeye Pipeline ELDORADO (b) 11.82 0.56 0.32 1.50 14.20 10.8 9.33 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Lima Buckeye Pipeline ELDORADO (b) 11.82 0.58 0.32 1.50 14.22 11.1 9.34 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Woodhaven Buckeye Pipeline ELDORADO (b) 11.97 0.56 0.32 1.50 14.36 10.8 9.48 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Detroit Buckeye Pipeline ELDORADO (b) 11.97 0.56 0.32 1.50 14.36 10.8 9.48 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing

Diesel: product adder

¢/gal · product adder
5.29
¢/gal · line-haul tariff · published
2.56
¢/gal · carrying cost · calculated
0.75
¢/gal · pipeline loss · estimate
0.49
¢/gal · terminaling · estimate
1.50
days financed
9.5

Route used: from Chelsea Jct. on Buckeye Pipeline to ELDORADO (FERC No. 442.42.0).

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 2.556 published Buckeye Pipeline FERC No. 442.42.0: Chelsea Jct. → ELDORADO (b), 107.34 ¢/bbl
Carrying cost 0.747 calculated $4.890000/gal × 5.8900% ÷ 365 × 9.465 days (1.965 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 189 pipeline miles at 4.0 mph (general estimate)
Pipeline loss 0.489 estimate flat estimate $0.0049/gal, applied 1 time
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 5.292 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (12 of 12). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Chelsea Jct. Buckeye Pipeline ELDORADO (b) 2.56 0.75 0.49 1.50 5.29 9.5 — FERC No. 442.42.0 effective 2025: check for a newer filing
Booth Buckeye Pipeline ELDORADO (b) 3.35 0.75 0.49 1.50 6.09 9.5 0.79 FERC No. 442.42.0 effective 2025: check for a newer filing
Eagle Point Buckeye Pipeline ELDORADO (b) 3.71 0.76 0.49 1.50 6.45 9.6 1.16 FERC No. 442.42.0 effective 2025: check for a newer filing
Paulsboro Buckeye Pipeline ELDORADO (b) 4.52 0.76 0.49 1.50 7.26 9.6 1.97 FERC No. 442.42.0 effective 2025: check for a newer filing
Linden Buckeye Pipeline ELDORADO (b) 4.52 0.80 0.49 1.50 7.31 10.1 2.02 FERC No. 442.42.0 effective 2025: check for a newer filing
Point Breeze Sunoco / Energy Transfer, then at Macungie: Buckeye Pipeline two pipelines ELDORADO (b) 7.26 0.97 0.98 1.50 10.71 12.3 5.42 FERC No. 175.36.0 + FERC No. 442.42.0 effective 2025: check for a newer filing
Midland Buckeye Pipeline ELDORADO (b) 9.49 0.69 0.49 1.50 12.18 8.8 6.89 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Findlay starts part-way along the line Buckeye Pipeline ELDORADO (b) 11.60 0.85 0.49 1.50 14.44 10.8 9.15 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Toledo Buckeye Pipeline ELDORADO (b) 11.82 0.85 0.49 1.50 14.66 10.8 9.36 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Lima Buckeye Pipeline ELDORADO (b) 11.82 0.87 0.49 1.50 14.68 11.1 9.39 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Woodhaven Buckeye Pipeline ELDORADO (b) 11.97 0.85 0.49 1.50 14.81 10.8 9.52 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Detroit Buckeye Pipeline ELDORADO (b) 11.97 0.85 0.49 1.50 14.81 10.8 9.52 FERC No. 460.11.0 item Table 1 effective 2025: check for a newer filing
Inputs and assumptions behind these figures
  • Product value (for carrying cost and loss only): the prior day's spot price. Gasoline: OilPriceAPI GASOLINE_RBOB_USD, 2026-10-17. Diesel: OilPriceAPI HEATING_OIL_USD, 2026-10-17. These are the New York Harbor futures benchmarks, not a Gulf Coast price.
  • Interest rate: SOFR 3.89% (2026-10-15) + 2.0 points.
  • Transit (estimate): straight-line miles between the tariff origin and delivery point × 1.15, at 4.0 mph unless the pipeline has its own figure.
  • Days financed (estimate): transit, plus half a 5-day shipping cycle waiting to lift (once for each pipeline on a two-pipeline route), plus 5 days of stock at the terminal.
  • Pipeline loss: the charge or volume deduction the tariff states, where it states one (marked *; a deduction is costed at the product value above). Otherwise an estimate of 0.10% of product value per pipeline, two for a joint rate; that includes pipelines that share out actual losses without publishing a figure, and tariffs that state no loss term.
  • Terminaling: the carrier's terminal charge where its tariff states one (marked *), otherwise a flat 1.5¢/gal estimate.
  • Which route sets the figure: the lowest one that starts at a supply origin. On Colonial that is Houston. A rate that starts part-way along a pipeline, or at a secondary origin, stays in the table but does not set the figure. Where a rate starts at a point another carrier delivers to, the first carrier's lowest rate into that point is added, with its loss and time in the pipe; terminaling is charged once. The same is done where one pipeline files the movement as two rates. Which origins are treated this way is our own review of each system, not a statement in a tariff.
  • Rates used: each pipeline's ordinary filed rate. Committed, volume-tier, discount and bid rates are left out, as are conditional fees (shown on each pipeline page), additives, taxes and the value of line space.
  • Assumption set in force from 2026-10-01; review by 2027-01-01.

Stored snapshots of the product adder

Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.

Snapshot Product Route Adder ¢/gal What moved
2026-10-14 Diesel Chelsea Jct. · Buckeye Pipeline 5.30 carrying cost +0.04¢; pipeline loss +0.03¢
2026-10-14 Gasoline Chelsea Jct. · Buckeye Pipeline 4.88 carrying cost −0.00¢; pipeline loss −0.00¢
2026-10-11 Diesel Chelsea Jct. · Buckeye Pipeline 5.24 carrying cost −0.02¢; pipeline loss −0.01¢
2026-10-11 Gasoline Chelsea Jct. · Buckeye Pipeline 4.88 carrying cost −0.00¢; pipeline loss −0.00¢
2026-10-09 Diesel Chelsea Jct. · Buckeye Pipeline 5.27 first snapshot
2026-10-09 Gasoline Chelsea Jct. · Buckeye Pipeline 4.88 first snapshot

Terminals within 100 miles

TerminalCityMilesProducts (inferred from supply)
Energy Transfer Marketing & Terminals LP T-25-PA-1788 Altoona, PA 0.5 gasoline distillate
Sunoco Midstream LLC T-25-PA-1785 Altoona, PA 0.6 gasoline distillate
Buckeye Terminals, LLC T-25-PA-1769 Greensburg, PA 55.7 gasoline distillate
Energy Transfer Marketing & Terminals LP T-25-PA-1761 Delmont, PA 60.3 gasoline distillate
Lucknow Highspire Terminal T-25-PA-1778 Delmont, PA 61.3 gasoline distillate
Lucknow Highspire Terminal T-23-PA-1715 Mechanicsburg, PA 74.7 gasoline distillate
Energy Transfer Marketing & Terminals LP T-25-PA-1791 Pittsburgh, PA 75.2 unknown
Buckeye Terminals LLC Indianola T-25-PA-1771 Indianola, PA 75.6 gasoline distillate
Watco Transloading LLC T-25-PA-1762 Dravosburg, PA 76.6 gasoline distillate
Sunoco Midstream LLC T-23-PA-1725 Mechanicsburg, PA 78.7 gasoline distillate
Sunoco Midstream LLC T-25-PA-1790 Belle Vernon, PA 79.5 gasoline distillate
Energy Transfer Marketing & Terminals LP T-25-PA-1781 Pittsburgh, PA 79.6 unknown
Lucknow Highspire Terminal T-23-PA-1713 Harrisburg, PA 86.9 gasoline distillate
Lucknow Highspire Terminal T-25-PA-1776 Pittsburgh, PA 87.6 gasoline distillate jet fuel propane butane other crude
Lucknow Highspire Terminal T-23-PA-1716 Middletown, PA 87.8 gasoline distillate
Lucknow Highspire Terminal T-25-PA-1780 Coraopolis, PA 91.8 gasoline distillate ethanol biodiesel
Buckeye Terminals, LLC T-25-PA-1792 Coraopolis, PA 92.0 gasoline distillate
Lucknow Highspire Terminal T-25-PA-1759 Coraopolis, PA 93.1 gasoline distillate
Sunoco Midstream LLC T-23-PA-1749 Williamsport, PA 93.7 gasoline distillate
Buckeye Terminal, LLC South Williamsport T-23-PA-1743 South Williamsport, PA 93.8 gasoline distillate
Aircraft Service International Inc. T-23-PA-1766 Pittsburgh, PA 94.9 gasoline distillate jet fuel propane butane other crude
Superior Plus Energy - Montoursvillee T-23-PA-1709 Montoursville, PA 95.5 gasoline distillate
Sunoco Midstream LLC T-55-WV-3186 Star City, WV 99.1 gasoline distillate ethanol

Delivered ethanol cost

Estimate over Chicago ethanol (CHI)
+12.05¢/gal

By truck direct from CE Acquisitions Co LLC (Coshocton, OH), about 218 road miles.

Origin plant page →

Assumptions: TOE (Round 2 adders, realistic transit)

Cost line¢/galHow
Basis +0.00 table · Origin-state discount to Chicago
Truck freight +10.90 estimated · 218 road mi × $4/loaded mi ÷ 8,000 gal
Wholesale margin +0.00 flat
Terminal charge +1.15 flat · Terminaling estimate
Carrying cost +0.00 calculated
Delivered over CHI+12.05
  • 3 plant(s) in KY, PA, TN not costed: no basis to Chicago on record for those states.

Options compared

OriginMoveDaysBasis ¢Delivered ¢/gal
CE Acquisitions Co LLC Coshocton, OH Truck · 218 road mi <1 +0.00 +12.05
ADM Decatur IL Decatur, IL NS · Decatur, IL → Altoona, PA 8.4 -5.50 +22.75
One Earth Energy LLC Gibson City, IL NS · Bloomington, IL → Altoona, PA 8.3 -5.50 +23.53
Green Plains Madison LLC Madison, IL NS · St. Louis, MO → Altoona, PA 8.7 -5.50 +23.66
Marquis Energy LLC Hennepin, IL NS · Kankakee, IL → Altoona, PA 8.5 -5.50 +23.68
Show Me Ethanol Carrollton, MO NS · Kansas City, MO → Altoona, PA 10.8 -5.50 +25.13
POET Biorefining - Fostoria LLC Fostoria, OH NS · Sandusky, OH → Altoona, PA 5.9 +0.00 +27.24
Cardinal Ethanol LLC Union City, IN NS · Muncie, IN → Altoona, PA 6.2 +0.00 +27.63
POET Biorefining - Leipsic LLC Leipsic, OH NS · Ft Wayne, IN → Altoona, PA 6.0 +0.00 +27.68
Central Indiana Ethanol LLC Marion, IN NS · Marion, IN → Altoona, PA 6.3 +0.00 +27.78

Published rail rates into this terminal

Destination rate group: Altoona, PA (NS) (Altoona is a listed station). Published single-car tank-car rates from the ethanol plants in each origin group, cheapest first — ¢/gal at 30,000 gal a car, line haul only. Delivery here assumes a rail or transload point in the group, then truck to the rack.

NSRQ 70120 price authority effective January 2, 2018, "subject to future increases" — current NS prices are published only through AccessNS. Not subject to fuel surcharge (note G556). Lanes to Norcross GA, Spartanburg SC, Alexandria VA and Pineville NC include transloading at the TBT (notes P949-P952).

From rate groupRailroad$/car¢/galEthanol plants in the groupTariff
Driftwood, PA NS 5,497 18.32 Pennsylvania Grain Prcsg LLC Clearfield, PA
NSRQ 70120 item 1000
Sandusky, OH NS 5,925 19.75 POET Biorefining - Fostoria LLC Fostoria, OH
Guardian Lima LLC Lima, OH
NSRQ 70120 item 1000
Decatur, IL NS 5,987 19.96 ADM Decatur IL Decatur, IL
NSRQ 70120 item 1000
Muncie, IN NS 6,017 20.06 Cardinal Ethanol LLC Union City, IN
POET Biorefining - Portland LLC Portland, IN
POET Biorefining - Alexandria LLC Alexandria, IN
NSRQ 70120 item 1000
Ft Wayne, IN NS 6,047 20.16 The Andersons Marathon Holdings LLC Logansport, IN
Valero Renewable Fuels LLC Bluffton, IN
POET Biorefining - Leipsic LLC Leipsic, OH
NSRQ 70120 item 1000
Marion, IN NS 6,047 20.16 POET Biorefining - North Manchester LLC North Manchester, IN
POET Biorefining - Shelbyville LLC Shelbyville, IN
Central Indiana Ethanol LLC Marion, IN
NSRQ 70120 item 1000
Chicago, IL NS 6,109 20.36 Chicago index barrels (CHI) NSRQ 70120 item 1000
Knoxville, TN NS 6,109 20.36 Primary Products Investments LLC Loudon, TN
NSRQ 70120 item 1000
Louisville, KY NS 6,109 20.36 Parallel Products Inc Louisville, KY
NSRQ 70120 item 1000
Elkhart, IN NS 6,109 20.36 South Bend Ethanol LLC South Bend, IN
NSRQ 70120 item 1000
Bloomington, IL NS 6,232 20.77 One Earth Energy LLC Gibson City, IL
Biourja Renewables LLC Peoria, IL
NSRQ 70120 item 1000
St. Louis, MO NS 6,232 20.77 Green Plains Madison LLC Madison, IL
Crysalis Biosciences Inc Sauget, IL
NSRQ 70120 item 1000
Lansing, MI NS 6,232 20.77 The Andersons Marathon Holdings LLC Albion, MI
Carbon Green Bioenergy LLC Lake Odessa, MI
NSRQ 70120 item 1000
Kankakee, IL NS 6,261 20.87 Marquis Energy LLC Hennepin, IL
NSRQ 70120 item 1000
Kansas City, MO NS 6,477 21.59 Show Me Ethanol Carrollton, MO
NSRQ 70120 item 1000
Evansville, IN NS 7,026 23.42 Green Plains Mount Vernon LLC Mount Vernon, IN
Valero Renewable Fuels LLC Mt Vernon, IN
Grain Processing Corp Washington, IN
NSRQ 70120 item 1000