Supply Explorer
Fuels refinery

Delek Tyler Refinery

Delek Refining, Ltd. · Delek US Holdings, Inc. (ultimate parent Delek Group Ltd., Netanya, Israel) · Tyler, TX

Operating PADD3
Aerial view of the site Imagery: USDA, USGS The National Map (public domain)
bpd crude capacity · EIA 2026
74,000
pipelines it injects into
1
delivery points reachable
0
terminals on those points
0
events on record
1

Capability

Crude distillation 74,000 bpd operable, 74,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.

Conversion — makes gasoline and diesel from heavier oil

Catalytic cracking (FCC) 18,500
Delayed coking 6,200

Upgrading

Catalytic reforming — low pressure 14,500
Vacuum distillation 28,000 sd

Treating — meets sulfur specs

Hydrotreating — diesel 36,000 sd
Hydrotreating — gasoline 13,000 sd
Hydrotreating — naphtha / reformer feed 28,000 sd

Production capacity

Alkylates · 4,720 Petcoke market · 1,500 Sulfur short tons day · 39

Crude slate

Mainly light, sweet crude oil, with access to East Texas, West Texas and, to a limited extent, Gulf Coast and foreign crude oil via third-party and Delek Logistics-owned pipelines.

Crude in & products out

From refinery research; each row links its source.
DirectionModeRoutePoint / originProductsSource
crude in pipeline East Texas Crude Logistics System (Delek Logistics)
Delek Refining, Ltd. and Delek Crude Logistics, LLC operate under a Pipelines and Tankage Agreement covering the East Texas Crude Logistics System; Delek Holdings has a 5-year agreement for third parties to transport a substantial majority of the Tyler refinery's crude oil requirements on this system.
East Texas crude source
crude in pipeline Nettleton and McMurrey Pipelines
Named pipelines within the East Texas system through which third parties can transport crude directly to the Tyler refinery, generally below the pipeline's minimum aggregate throughput requirement.
East Texas (feed into the East Texas Crude Logistics System) crude source
crude in pipeline Paline Pipeline
Delek Logistics-operated pipeline transporting crude oil from East Texas to Gulf Coast-area refiners, described as serving Delek's Tyler, El Dorado and Krotz Springs refineries alongside the East Texas crude logistics system and Caddo pipeline.
East Texas to Gulf Coast refiners (incl. Tyler) crude source
crude in pipeline Caddo Pipeline
From the Longview, TX crude oil hub, crude can be delivered into the Tyler refinery using various Delek Logistics pipeline assets including the Caddo pipeline.
Longview, TX crude hub crude source
products out pipeline Delek Logistics Pipeline / on-site refined products terminal
The vast majority of Tyler's transportation fuels and other products supply the local East Texas market and are sold directly from a refined-products terminal owned by Delek Logistics and located at the refinery; Tyler is described as the only major full-range refined-products distributor within ~100 miles.
Tyler, TX (at the refinery) gasoline distillate source
products out truck rack Tyler refinery truck rack
Delek Logistics' wholesale marketing and terminalling segment markets 100% of Tyler's refined product output through owned product truck racks and light product terminals.
Tyler, TX gasoline distillate source

Pipeline reach

This refinery injects at tariff origin points, but those systems’ rates haven’t been transcribed yet.

Substitutes

Other refineries injecting into the same pipelines — the supply that could backfill an outage here.

Events

Outages, fires, turnarounds, sales and closures — newest first.
  1. 2025-02-26 outage

    Delek US described 2024 as a 'rough' year company-wide, with Q4 2024 refining crack spreads down 13.1% year-over-year, but reported it was pursuing roughly $730 million of active/planned U.S. capital projects in 2025, including expansions at 'one of its major refineries' (not specified as Tyler). source

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.