Fuels refinery

CVR Coffeyville Refinery

Coffeyville Resources Refining & Marketing, LLC · CVR Energy, Inc. (majority-owned by Icahn Enterprises L.P., which held roughly 66% in late 2024 and increased its stake toward ~71-84% through 2025-2026 tender offers and open-market purchases) · Coffeyville, KS

Operating PADD2 IRS refinery no. R-48-KS-0046 petroleum coke petcoke to fertilizer feedstock
Aerial view of the site Imagery: USDA, USGS The National Map (public domain)
bpd crude capacity · EIA 2026
132,000
pipelines it injects into · +1 same-city tariff origins
1
delivery points reachable
4
terminals on those points
3
events on record
2

Capability

Crude distillation 132,000 bpd operable, 132,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.

Conversion — makes gasoline and diesel from heavier oil

Catalytic cracking (FCC) 33,900
Delayed coking 22,750

Upgrading

Catalytic reforming — low pressure 24,000
Vacuum distillation 48,600 sd

Treating — meets sulfur specs

Hydrotreating — diesel 34,000 sd
Hydrotreating — kerosene & jet 9,000 sd
Hydrotreating — gasoline 22,000 sd
Hydrotreating — naphtha / reformer feed 38,000 sd
Hydrotreating — other distillate 27,800 sd

Production capacity

Alkylates · 10,100 Hydrogen mmcfd · 22 Isomerization isopentane isohexane · 11,400 Petcoke market · 8,700 Sulfur short tons day · 138

Crude slate

Medium-sour crude, full-coking configuration; sourced via Cushing hub (blend of domestic and Canadian-origin barrels reaching Cushing, not confirmed as a specific Keystone Pipeline delivery).

Crude in & products out

From refinery research; each row links its source.
DirectionModeRoutePoint / originProductsSource
crude in pipeline CVR Coffeyville-Cushing crude pipeline
CVR operates a dedicated ~110,000 bpd crude pipeline from Cushing (~100 miles away) to Coffeyville, plus a 145,000 bpd system moving crude from its Broome Station tank farm to the refinery; CVR owns roughly 6% of Cushing's total crude storage capacity. This is CVR's own named 'Coffeyville' pipeline, not a segment of the Keystone Pipeline.
Cushing, OK crude source
products out pipeline Magellan Pipeline
Magellan Pipeline FERC No. 160.59.0, effective 2026-08-01, lists Coffeyville in its Kansas origin group with El Dorado and Kansas City Junction. The tariff names the town, not the plant. An earlier filing describes an 8-inch Magellan line from Coffeyville to Kansas City, KS carrying up to 30,000 bpd.
Coffeyville, KS tariff origin gasoline distillate source
products out pipeline East Products Pipeline
Sunoco LP's East Products Pipeline, the former NuStar east system, lists Coffeyville Resources via Enterprise among its originations at El Dorado, KS. The connection is not at the plant. The Sunoco page uses some older company names, so the listing may not be current.
El Dorado, KS, reached over an Enterprise pipeline from Coffeyville gasoline distillate source
products out truck rack CVR Energy Coffeyville Terminal Operations (T-48-KS-3651)
CVR Energy states that gasoline and diesel fuel are sold at its truck loading racks. The IRS terminal record T-48-KS-3651, Coffeyville Terminal Operations, is at 400 N. Linden Street, the refinery's own address.
Refinery site, 400 N. Linden Street, Coffeyville, KS gasoline distillate source

Pipeline reach

Where this refinery’s product can go by published tariff route from the points it injects at — what an outage here would touch.
PipelineInjects atDelivery pointsTerminalsLowest ¢/bblMedian ¢/bbl
Enterprise / TEPPCO
Coffeyville (Montgomery Co., KS) same city
4 3 558.09 558.09

Substitutes

Other refineries injecting into the same pipelines — the supply that could backfill an outage here.

Magellan Midstream

Events

Outages, fires, turnarounds, sales and closures — newest first.
  1. 2025-01-21 fire

    Fire broke out at the naphtha hydrotreater during Winter Storm Enzo (sub-zero temperatures); extinguished same day. source

  2. 2025-01 turnaround

    Planned Q1 2025 turnaround (crude unit, FCC and associated units) began days after the fire; extended 10-15 days per CEO comments, targeted for end-of-March completion, nearly complete by April 2025. source

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.