Flint, MI
#150 of 422 U.S. rack markets by terminals
- terminals
- 2
- pipeline systems delivering
- 1
- refineries in market
- 0
- refineries supplying market
- 17
- people in the trade area
- 830,061
- gal/day gasoline · estimated demand
- 1,048,540
- gal/day diesel · estimated demand
- 255,329
Terminals in this market
| Terminal | TCN | Location | Delivered by |
|---|---|---|---|
| Energy Transfer Marketing & Terminals LP | T-38-MI-3029 | Owosso, MI | Buckeye Pipeline |
| Marathon Flint | T-38-MI-3016 | Mt. Morris, MI | Buckeye Pipeline |
Pipelines delivering to this market
Each system with a tariff delivery point at one of this market’s terminals, and how many running refineries can ship on it to here.
| Pipeline system | Terminals here | Delivery points | Refineries confirmed | All reachable |
|---|---|---|---|---|
| Buckeye Pipeline | 2 | 2 | 0 | 4 |
Refineries that can supply this market
| Refinery | Location | Via | Link |
|---|---|---|---|
| BP Whiting Refinery | Whiting, IN | Wolverine Pipeline | confirmed |
| CITGO Lake Charles Refinery | Lake Charles, LA | Explorer Pipeline | per research |
| CITGO Lemont Refinery | Lemont, IL | Wolverine Pipeline | per research |
| Cenovus Lima Refinery | Lima, OH | Buckeye Pipeline | per research |
| ExxonMobil Baytown Refinery | Baytown, TX | Explorer Pipeline | per research |
| ExxonMobil Beaumont Refinery | Beaumont, TX | Explorer Pipeline | per research |
| ExxonMobil Joliet Refinery | Joliet, IL | Wolverine Pipeline | per research |
| Marathon Petroleum Detroit Refinery | Detroit, MI | Buckeye Pipeline | per research |
| Motiva Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline, Explorer Pipeline | per research |
| Ohio Refining Company Toledo Refinery (formerly BP-Husky) | Toledo, OH | Buckeye Pipeline, Sunoco / Energy Transfer | per research |
| PBF Toledo Refinery | Toledo, OH | Buckeye Pipeline, Sunoco / Energy Transfer | per research |
| Valero Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline, Explorer Pipeline | per research |
| Chevron Pasadena Refinery (Pasadena Refining System, Inc.) | Pasadena, TX | Explorer Pipeline, Marathon Pipe Line (MPLX), Phillips 66 Pipeline | inferred (same city) |
| Phillips 66 Sweeny Refinery | Sweeny, TX | Phillips 66 Pipeline | inferred (same city) |
| TotalEnergies Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline, Explorer Pipeline | inferred (same city) |
| Valero Houston Refinery | Houston, TX | Explorer Pipeline | inferred (same city) |
| Wood River Refinery | Wood River, IL | Explorer Pipeline, Phillips 66 Pipeline | inferred (same city) |
Trade area
- people in the trade area · 2025 estimate
- 830,061
- rank of 422 rack markets by people
- #135
- gallons of gasoline a day · estimate, 2025
- 1,048,540
- gallons of diesel a day · estimate, 2025
- 255,329
- counties wholly in this market
- 1
- counties shared with other markets
- 12
| County | State | Share here | People counted here | Gasoline gal/day | Diesel gal/day | County population | Miles |
|---|---|---|---|---|---|---|---|
| Genesee County | MI | 100% | 401,093 | 479,141 | 106,163 | 401,093 | 13 |
| Saginaw County | MI | 63% | 118,581 | 146,893 | 41,506 | 187,688 | 20 |
| Shiawassee County | MI | 90% | 60,588 | 84,682 | 32,810 | 67,681 | 11 |
| Livingston County | MI | 27% | 53,097 | 81,204 | 18,439 | 197,315 | 31 |
| Ingham County | MI | 14% | 39,719 | 39,233 | 8,226 | 289,709 | 37 |
| Lapeer County | MI | 40% | 36,138 | 46,641 | 14,083 | 89,516 | 37 |
| Midland County | MI | 30% | 25,419 | 31,735 | 4,592 | 83,754 | 47 |
| Isabella County | MI | 36% | 23,127 | 32,204 | 5,417 | 64,691 | 61 |
| Gratiot County | MI | 44% | 18,173 | 29,763 | 6,105 | 41,190 | 37 |
| Tuscola County | MI | 32% | 16,736 | 18,427 | 3,587 | 52,680 | 40 |
| Clare County | MI | 41% | 12,898 | 21,434 | 4,452 | 31,543 | 79 |
| Clinton County | MI | 16% | 12,821 | 21,914 | 6,509 | 80,432 | 33 |
| Sanilac County | MI | 29% | 11,680 | 15,288 | 3,445 | 40,083 | 72 |
Fuel demand is an estimate: each state’s taxed gallons for the year (FHWA) are split among its counties by where the driving happens (EPA county vehicle miles, weighted by how much fuel each vehicle type burns), then shared to markets as above. Every state adds back to its FHWA total. Gasoline includes the ethanol blended into it; diesel is FHWA’s special fuels. Expect diesel to be least reliable along long-haul corridors, where trucks buy fuel in one county and burn it in another. Population: U.S. Census Bureau county estimates.
How good is it? Checked in October 2026 against the county retail sales Iowa and California publish: for gasoline, about 3–5% of gallons landed in the wrong rack market and a typical market was within 5–6%. For diesel, 14–21% landed in the wrong market and a typical market was 30–45% off, with truck-stop corridors such as Bakersfield and Stockton under-counted. Treat gasoline as a working estimate and diesel as a rough guide.
Cost to serve this market by pipeline
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Gasoline: product adder
- ¢/gal · product adder
- 6.05
- ¢/gal · line-haul tariff · published
- 3.80
- ¢/gal · carrying cost · calculated
- 0.42
- ¢/gal · pipeline loss · estimate
- 0.32
- ¢/gal · terminaling · estimate
- 1.50
- days financed
- 8.2
Route used: from Detroit on Buckeye Pipeline to FLINT (FERC No. 446.52.0 item Table 1).
How this adder is worked, line by line
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 3.801 | published | Buckeye Pipeline FERC No. 446.52.0 item Table 1: Detroit → FLINT, 159.63 ¢/bbl |
| Carrying cost | 0.425 | calculated | $3.200000/gal × 5.8800% ÷ 365 × 8.239 days (0.739 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 71 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.320 | estimate | flat estimate $0.0032/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 6.045 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (15 of 15). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Detroit | Buckeye Pipeline | FLINT | Marathon Flint | 3.80 | 0.42 | 0.32 | 1.50 | 6.05 | 8.2 | — | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | FLINT | Marathon Flint | 3.95 | 0.43 | 0.32 | 1.50 | 6.20 | 8.3 | 0.15 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | FLINT | Marathon Flint | 4.49 | 0.45 | 0.32 | 1.50 | 6.75 | 8.7 | 0.71 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Inkster (Joan Jct) | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 4.57 | 0.43 | 0.32 | 1.50 | 6.82 | 8.3 | 0.78 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | FLINT | Marathon Flint | 4.99 | 0.47 | 0.32 | 1.50 | 7.28 | 9.2 | 1.24 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Detroit | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 5.19 | 0.43 | 0.32 | 1.50 | 7.44 | 8.4 | 1.40 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 5.33 | 0.44 | 0.32 | 1.50 | 7.58 | 8.4 | 1.54 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | FLINT | Marathon Flint | 5.38 | 0.49 | 0.32 | 1.50 | 7.69 | 9.5 | 1.64 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | FLINT | Marathon Flint | 5.65 | 0.50 | 0.32 | 1.50 | 7.97 | 9.6 | 1.92 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 5.85 | 0.45 | 0.32 | 1.50 | 8.12 | 8.7 | 2.08 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 6.74 | 0.47 | 0.32 | 1.50 | 9.03 | 9.2 | 2.98 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 6.80 | 0.49 | 0.32 | 1.50 | 9.10 | 9.4 | 3.06 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 6.89 | 0.48 | 0.32 | 1.50 | 9.20 | 9.4 | 3.15 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | FLINT | Marathon Flint | 8.72 | 0.52 | 0.32 | 1.50 | 11.06 | 10.1 | 5.02 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 9.97 | 0.50 | 0.32 | 1.50 | 12.29 | 9.8 | 6.25 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
Diesel: product adder
- ¢/gal · product adder
- 6.45
- ¢/gal · line-haul tariff · published
- 3.80
- ¢/gal · carrying cost · calculated
- 0.66
- ¢/gal · pipeline loss · estimate
- 0.50
- ¢/gal · terminaling · estimate
- 1.50
- days financed
- 8.2
Route used: from Detroit on Buckeye Pipeline to FLINT (FERC No. 446.52.0 item Table 1).
How this adder is worked, line by line
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 3.801 | published | Buckeye Pipeline FERC No. 446.52.0 item Table 1: Detroit → FLINT, 159.63 ¢/bbl |
| Carrying cost | 0.657 | calculated | $4.950000/gal × 5.8800% ÷ 365 × 8.239 days (0.739 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 71 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.495 | estimate | flat estimate $0.0050/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 6.453 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (15 of 15). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Detroit | Buckeye Pipeline | FLINT | Marathon Flint | 3.80 | 0.66 | 0.50 | 1.50 | 6.45 | 8.2 | — | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | FLINT | Marathon Flint | 3.95 | 0.66 | 0.50 | 1.50 | 6.61 | 8.3 | 0.15 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | FLINT | Marathon Flint | 4.49 | 0.69 | 0.50 | 1.50 | 7.17 | 8.7 | 0.72 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Inkster (Joan Jct) | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 4.57 | 0.66 | 0.50 | 1.50 | 7.23 | 8.3 | 0.78 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | FLINT | Marathon Flint | 4.99 | 0.73 | 0.50 | 1.50 | 7.71 | 9.2 | 1.26 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Detroit | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 5.19 | 0.67 | 0.50 | 1.50 | 7.85 | 8.4 | 1.40 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 5.33 | 0.67 | 0.50 | 1.50 | 7.99 | 8.4 | 1.54 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | FLINT | Marathon Flint | 5.38 | 0.76 | 0.50 | 1.50 | 8.13 | 9.5 | 1.68 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | FLINT | Marathon Flint | 5.65 | 0.77 | 0.50 | 1.50 | 8.42 | 9.6 | 1.96 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 5.85 | 0.69 | 0.50 | 1.50 | 8.54 | 8.7 | 2.09 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 6.74 | 0.73 | 0.50 | 1.50 | 9.46 | 9.2 | 3.01 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 6.80 | 0.75 | 0.50 | 1.50 | 9.54 | 9.4 | 3.09 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 6.89 | 0.75 | 0.50 | 1.50 | 9.64 | 9.4 | 3.18 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | FLINT | Marathon Flint | 8.72 | 0.81 | 0.50 | 1.50 | 11.52 | 10.1 | 5.07 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | OWOSSO | Energy Transfer Marketing & Terminals LP | 9.97 | 0.78 | 0.50 | 1.50 | 12.74 | 9.8 | 6.29 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
Inputs and assumptions behind these figures
- Product value (for carrying cost and loss only): the prior day's spot price. Gasoline: OilPriceAPI GASOLINE_RBOB_USD, 2026-10-19. Diesel: OilPriceAPI HEATING_OIL_USD, 2026-10-19. These are the New York Harbor futures benchmarks, not a Gulf Coast price.
- Interest rate: SOFR 3.88% (2026-10-16) + 2.0 points.
- Transit (estimate): straight-line miles between the tariff origin and delivery point × 1.15, at 4.0 mph unless the pipeline has its own figure.
- Days financed (estimate): transit, plus half a 5-day shipping cycle waiting to lift (once for each pipeline on a two-pipeline route), plus 5 days of stock at the terminal.
- Pipeline loss: the charge or volume deduction the tariff states, where it states one (marked *; a deduction is costed at the product value above). Otherwise an estimate of 0.10% of product value per pipeline, two for a joint rate; that includes pipelines that share out actual losses without publishing a figure, and tariffs that state no loss term.
- Terminaling: the carrier's terminal charge where its tariff states one (marked *), otherwise a flat 1.5¢/gal estimate.
- Which route sets the figure: the lowest one that starts at a supply origin. On Colonial that is Houston. A rate that starts part-way along a pipeline, or at a secondary origin, stays in the table but does not set the figure. Where a rate starts at a point another carrier delivers to, the first carrier's lowest rate into that point is added, with its loss and time in the pipe; terminaling is charged once. The same is done where one pipeline files the movement as two rates. Which origins are treated this way is our own review of each system, not a statement in a tariff.
- Rates used: each pipeline's ordinary filed rate. Committed, volume-tier, discount and bid rates are left out, as are conditional fees (shown on each pipeline page), additives, taxes and the value of line space.
- Assumption set in force from 2026-10-01; review by 2027-01-01.
Published line-haul rates, all products and rate types
- ¢/gal · cheapest gasoline · from Detroit on Buckeye Pipeline
- 3.80
- ¢/gal · cheapest diesel · from Detroit on Buckeye Pipeline
- 3.80
| Origin | Pipeline | Delivery point | Product | ¢/bbl | ¢/gal | Refineries at the origin | Tariff |
|---|---|---|---|---|---|---|---|
| Detroit | Buckeye Pipeline | FLINT | gasoline, distillate | 159.63 | 3.80 | Marathon Petroleum Detroit Refinery | FERC No. 446.52.0 item Table 1 |
| Woodhaven | Buckeye Pipeline | FLINT | gasoline, distillate | 165.71 | 3.95 | FERC No. 446.52.0 item Table 1 | |
| Toledo | Buckeye Pipeline | FLINT | gasoline, distillate | 188.44 | 4.49 | Ohio Refining Company Toledo Refinery (formerly BP-Husky); PBF Toledo Refinery | FERC No. 446.52.0 item Table 1 |
| Inkster (Joan Jct) | Buckeye Pipeline | OWOSSO | gasoline, distillate | 192.06 | 4.57 | FERC No. 446.52.0 item Table 1 | |
| Findlay | Buckeye Pipeline | FLINT | gasoline, distillate | 209.42 | 4.99 | FERC No. 446.52.0 item Table 1 | |
| Detroit | Buckeye Pipeline | OWOSSO | gasoline, distillate | 217.95 | 5.19 | Marathon Petroleum Detroit Refinery | FERC No. 446.52.0 item Table 1 |
| Woodhaven | Buckeye Pipeline | OWOSSO | gasoline, distillate | 223.66 | 5.33 | FERC No. 446.52.0 item Table 1 | |
| Lima | Buckeye Pipeline | FLINT | gasoline, distillate | 225.89 | 5.38 | Cenovus Lima Refinery | FERC No. 446.52.0 item Table 1 |
| Huntington | Buckeye Pipeline | FLINT | gasoline, distillate | 237.46 | 5.65 | FERC No. 446.52.0 item Table 1 | |
| Toledo | Buckeye Pipeline | OWOSSO | gasoline, distillate | 245.89 | 5.86 | Ohio Refining Company Toledo Refinery (formerly BP-Husky); PBF Toledo Refinery | FERC No. 446.52.0 item Table 1 |
| Findlay | Buckeye Pipeline | OWOSSO | gasoline, distillate | 282.91 | 6.74 | FERC No. 446.52.0 item Table 1 | |
| Lima | Buckeye Pipeline | OWOSSO | gasoline, distillate | 285.55 | 6.80 | Cenovus Lima Refinery | FERC No. 446.52.0 item Table 1 |
| Huntington | Buckeye Pipeline | OWOSSO | gasoline, distillate | 289.43 | 6.89 | FERC No. 446.52.0 item Table 1 | |
| Chicago Complex | Buckeye Pipeline | FLINT | gasoline, distillate | 366.35 | 8.72 | FERC No. 446.52.0 item Table 1 | |
| Chicago Complex | Buckeye Pipeline | OWOSSO | gasoline, distillate | 418.76 | 9.97 | FERC No. 446.52.0 item Table 1 |
Supply resilience
- pipeline supply
- One pipeline
- pipeline systems delivering
- 1
- terminals on two or more pipelines
- 0
- terminals with no pipeline tariff
- 0
One pipeline system delivers here: Buckeye Pipeline. An outage on it leaves the market to truck, rail or water.
If a pipeline system goes down
| Pipeline system | Terminals it reaches here | With no other pipeline | Which |
|---|---|---|---|
| Buckeye Pipeline | 2 | 2 | Energy Transfer Marketing & Terminals LP; Marathon Flint |
Counts pipeline systems with a tariff delivery point here, not capacity, storage or contracts. A system with two lines into the market still counts once, and a terminal with one pipeline may also receive by truck, rail or water. For a refinery or pipeline outage across every market it touches, open that facility’s page.
Delivered ethanol cost
- ¢/gal over Chicago ethanol · lowest in the market
- +2.92
- ¢/gal over Chicago ethanol · highest
- +3.86
An estimate for each terminal: the cheapest of published rail rates and trucking from the nearest plants, plus basis, transload, terminaling and carrying cost. Each terminal page shows the build-up line by line.
| Terminal | ¢/gal over Chicago | By | From | Miles |
|---|---|---|---|---|
| Marathon Flint | +2.92 | truck | POET Biorefining - Caro LLC (Caro, MI) | 35 |
| Energy Transfer Marketing & Terminals LP | +3.86 | truck | Carbon Green Bioenergy LLC (Lake Odessa, MI) | 54 |
Nearby rack markets
Rack markets within 75 miles (straight line): where a buyer here could also lift.
| Rack market | Miles | Terminals | Pipelines |
|---|---|---|---|
| Lansing, MI | 39 | 1 | 1 |
| Bay City, MI | 40 | 1 | 2 |
| Alma, MI | 43 | 0 | — |
| Novi, MI | 47 | 1 | 1 |
| Jackson, MI | 58 | 3 | 1 |
| Romulus, MI | 65 | 2 | 2 |
| Detroit, MI | 66 | 6 | 2 |
| Taylor, MI | 66 | 5 | 1 |
| Albion, MI | 67 | 0 | — |
| River Rouge, MI | 68 | 3 | — |
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.