LyondellBasell Houston Refinery (Houston Refining LP)
Houston Refining LP · LyondellBasell Industries N.V. · Houston, TX
263,776 barrels per day is the EIA capacity figure for the plant. Believed to be the oldest refinery on the Houston Ship Channel, in operation since 1918. Permanently closed in the first quarter of 2025. EIA lists the shutdown date as February 2025 and notes that the facility no longer operates as a refinery. Texas Railroad Commission monthly statements show crude runs of 6,402,725 barrels in January 2025, 2,640,079 barrels in February 2025 and none in March 2025. Pipeline shipments of gasoline and diesel continued in March 2025 after crude runs ended. LyondellBasell laid off more than 400 employees around the closure. All crude and product connections listed here are historical.
- bpd crude capacity · EIA
- 196,500
- pipelines it injects into · +2 same-city tariff origins
- 0
- delivery points reachable
- 46
- terminals on those points
- 50
- events on record
- 5
Capability
This site isn’t in EIA’s latest refinery capacity survey — usually a sign it has closed, converted, or isn’t a fuels refinery.
Crude slate
Not specifically documented in sources reviewed; historically processed a mix of Gulf Coast/Permian and imported crude typical of Houston Ship Channel refineries.
Crude in & products out
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | Enterprise pipeline Historical. The Texas Railroad Commission monthly statements list Enterprise PL as a crude carrier to the plant: 1,659,079 barrels in January 2025 and 991,446 barrels in February 2025. There were no crude receipts in March 2025. The form does not identify the line further. |
Not stated | crude | source |
| crude in | pipeline | Houston Fuel Oil Terminal (HFOTCO) Historical. The monthly statements list the terminal, written as Hfot, as a crude source: 2,462,373 barrels in January 2025 and 624,659 barrels in February 2025. The form does not name the connecting line or the origin of the crude. |
Not stated | crude | source |
| crude in | pipeline | Oiltanking pipeline (OTTI PL) Historical. The monthly statements list OTTI PL as a crude carrier to the plant: 1,532,367 barrels in January 2025 and 200,305 barrels in February 2025. The form does not identify the line further. |
Not stated | crude | source |
| crude in | pipeline | Magellan Houston crude distribution system Magellan Crude Oil Pipeline Company Texas No. 6.16.0, effective January 1, 2025, lists Lyondell (Houston Refining) as a delivery point from Magellan East Houston Terminal and from Speed Jct. at 15.00 cents a barrel. The tariff names no upstream line or grade. The January to March 2025 monthly statements show no crude receipts from Magellan. |
Magellan East Houston Terminal and Speed Jct. | crude | source |
| crude in | marine | Houston Ship Channel Historical. NOAA Coast Pilot 5 says crude oil is received at the refinery wharves, Docks B and C, on the south side of the ship channel. The Coast Pilot text has not been revised for the 2025 closure. |
Waterborne. Origins not stated. | crude | source |
| products out | marine | Houston Ship Channel Historical. NOAA Coast Pilot 5 says petroleum products and petrochemicals are received and shipped at the refinery wharves. It does not list grades. Dock B has berthing space with dolphins for 800-foot vessels and 40 feet reported alongside. Dock C has 750 feet of berthing space and 38 feet reported alongside. |
Refinery Docks B and C, south side of the Houston Ship Channel | gasoline distillate jet fuel | source |
| products out | pipeline | Explorer Pipeline Historical. The Texas Railroad Commission monthly statements name Explorer's 16-inch line as the gasoline carrier and its 12-inch line as the kerosene and diesel carrier from the plant. January 2025 shipments were 2,115,757 barrels of gasoline, 485,491 barrels of kerosene and 1,857,093 barrels of diesel. The last shipments found are March 2025: 369,359 barrels of gasoline and 38,997 barrels of diesel. |
At the refinery, into Explorer's 16-inch and 12-inch lines | gasoline distillate | source |
| products out | pipeline | Kinder Morgan Pasadena products pipelines Historical. The monthly statements show gasoline shipped to Kinder Morgan: 1,495,690 barrels in January 2025, 449,766 in February and 120,667 in March 2025. Kinder Morgan's June 2025 Pasadena Terminal sheet lists Houston Refining Lyondell among the connected refiners. The statements do not say which Kinder Morgan terminal received the gasoline. |
Kinder Morgan Pasadena Terminal | gasoline | source |
Docks
The docks at this facility and, where a ship agent or port publishes it, the largest vessel each berth takes. Channel conditions change; these figures are a guide, not clearance to sail.
Houston Refining docks
| Berth | Max draft | Max length | Max beam | Air draft |
|---|---|---|---|---|
| B | 34 ft | 800 ft | 116 ft | – |
| C | 32 ft | 610 ft | 106 ft | – |
Source: Moran Shipping Agencies port directory, read 2026-10-10.
Pipeline reach
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Explorer Pipeline |
Pasadena, Houston same city
|
26 | 35 | 96.30 | 307.00 |
| Magellan Midstream |
East Houston, TX same city
Valero Refining-Texas Houston Refinery same city
|
20 | 15 | 44.33 | 256.57 |
Substitutes
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
Explorer Pipeline
- Motiva Enterprises LLC · Port Arthur, TX 656,400 bpd
- Marathon Petroleum CO LP · Galveston Bay, TX 631,000 bpd
- Exxonmobil Refining & Supply CO · Beaumont, TX 612,000 bpd
- Exxonmobil Refining & Supply CO · Baytown, TX 564,500 bpd
- Citgo Petroleum Corp · Lake Charles, LA 471,200 bpd
- Premcor Refining Group INC · Port Arthur, TX 385,000 bpd
- Wrb Refining LP · Wood River, IL 345,000 bpd
- Totalenergies Petrochem & Refg USA · Port Arthur, TX 238,000 bpd
- Valero Refining CO Texas LP · Texas City, TX 225,000 bpd
- Valero Refining CO Texas LP · Houston, TX 205,000 bpd
- Pasadena Refining Systems INC · Pasadena, TX 118,750 bpd
Magellan Midstream
- Motiva Enterprises LLC · Port Arthur, TX 656,400 bpd
- Exxonmobil Refining & Supply CO · Baytown, TX 564,500 bpd
- Premcor Refining Group INC · Port Arthur, TX 385,000 bpd
- Flint Hills Resources LP · Saint Paul, MN 335,000 bpd
- Deer Park Refining LP · Deer Park, TX 312,500 bpd
- Totalenergies Petrochem & Refg USA · Port Arthur, TX 238,000 bpd
- Phillips 66 Company · Ponca City, OK 228,000 bpd
- Valero Refining CO Texas LP · Texas City, TX 225,000 bpd
- Valero Refining CO Texas LP · Houston, TX 205,000 bpd
- Hf Sinclair El Dorado Refining LLC · El Dorado, KS 162,000 bpd
- Western Refining Company LP · El Paso, TX 133,000 bpd
- Coffeyville Resources Rfg & Mktg · Coffeyville, KS 132,000 bpd
- Chs Mcpherson Refinery INC · Mcpherson, KS 119,000 bpd
- Pasadena Refining Systems INC · Pasadena, TX 118,750 bpd
- Hf Sinclair Navajo Refining LLC · Artesia, NM 110,000 bpd
- Kinder Morgan Crude & Condensate · Galena Park, TX 105,000 bpd
- St Paul Park Refining CO LLC · Saint Paul, MN 105,000 bpd
- Valero Refining CO Oklahoma · Ardmore, OK 86,000 bpd
- Hf Sinclair Tulsa Refining LLC · Tulsa West, OK 85,000 bpd
- Wynnewood Refining CO · Wynnewood, OK 74,500 bpd
- Delek Refining LTD · Tyler, TX 74,000 bpd
- Phillips 66 Company · Billings, MT 71,000 bpd
- Hf Sinclair Tulsa Refining LLC · Tulsa East, OK 70,300 bpd
- Superior Refining Company LLC · Superior, WI 49,547 bpd
- Petromax Refining CO LLC · Houston, TX 25,000 bpd
Events
-
2025-03
closure
The Texas Railroad Commission monthly statement for March 2025 shows no crude run and no crude receipts. Gasoline and diesel shipments on Explorer and to Kinder Morgan continued at reduced volumes. EIA lists the refinery as shut down in February 2025. source
-
2025-02
closure
Second CDU-coker train shut down; LyondellBasell/sources reported the shutdown of the Houston refinery complete. source
-
2025-01-27
closure
Shutdown began with the first CDU/coker production train going offline. source
-
2025-01-24
closure
LyondellBasell confirmed layoffs of over 400 employees as the Houston refinery prepared to shut down. source
-
2024-11
closure
LyondellBasell announced it would permanently close the Houston refinery in Q1 2025. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.