Supply Explorer
Rack market

Neville Island, PA

#232 of 422 U.S. rack markets by terminals

OPIS rack code 172 Gasoline & diesel Biodiesel Ethanol
terminals
1
pipeline systems delivering
1
refineries in market
0
refineries supplying market
33
people in the trade area
325,641
gal/day gasoline · estimated demand
316,027
gal/day diesel · estimated demand
93,616

Terminals in this market

The racks that post prices in this market. Pipelines = systems with a tariff delivery point at the terminal.
Terminal TCN Location Delivered by
Lucknow Highspire Terminal T-25-PA-1776 Pittsburgh, PA Buckeye Pipeline

Pipelines delivering to this market

Each system with a tariff delivery point at one of this market’s terminals, and how many running refineries can ship on it to here.

Pipeline system Terminals here Delivery points Refineries confirmed All reachable
Buckeye Pipeline 1 1 0 7

Refineries that can supply this market

Running refineries that can reach a terminal here by published route, including across connecting carriers, confirmed links first. 1 are confirmed or named in a tariff; 29 are per research; 3 are inferred because the refinery shares a city with a tariff origin. Capacity, contracts and who actually ships are not known from tariffs. No running refinery is located in this market (nearest rack market, within 50 miles).
Refinery Location Via Link
BP Whiting Refinery Whiting, IN Wolverine Pipeline confirmed
Bayway Refinery (Phillips 66) Linden, NJ Buckeye Pipeline, Colonial Pipeline, Sunoco / Energy Transfer per research
CITGO Lake Charles Refinery Lake Charles, LA Colonial Pipeline, Explorer Pipeline per research
CITGO Lemont Refinery Lemont, IL Wolverine Pipeline per research
Calcasieu Refining Company Lake Charles, LA Colonial Pipeline per research
Cenovus Lima Refinery Lima, OH Buckeye Pipeline per research
Chevron Pasadena Refinery (Pasadena Refining System, Inc.) Pasadena, TX Colonial Pipeline, Explorer Pipeline, Marathon Pipe Line (MPLX), Phillips 66 Pipeline per research
ExxonMobil Baton Rouge Refinery Baton Rouge, LA Bengal Pipeline, Colonial Pipeline per research
ExxonMobil Baytown Refinery Baytown, TX Colonial Pipeline, Explorer Pipeline per research
ExxonMobil Beaumont Refinery Beaumont, TX Colonial Pipeline, Explorer Pipeline per research
ExxonMobil Joliet Refinery Joliet, IL Wolverine Pipeline per research
Hunt Refining Company - Tuscaloosa Refinery Tuscaloosa, AL Colonial Pipeline per research
Krotz Springs Refinery Krotz Springs, LA Colonial Pipeline per research
Marathon Galveston Bay Refinery Galveston Bay, TX Colonial Pipeline per research
Marathon Garyville Refinery Garyville, LA Bengal Pipeline per research
Marathon Petroleum Detroit Refinery Detroit, MI Buckeye Pipeline per research
Motiva Port Arthur Refinery Port Arthur, TX Colonial Pipeline, Explorer Pipeline per research
Ohio Refining Company Toledo Refinery (formerly BP-Husky) Toledo, OH Buckeye Pipeline, Sunoco / Energy Transfer per research
PBF Toledo Refinery Toledo, OH Buckeye Pipeline, Sunoco / Energy Transfer per research
Paulsboro Refinery (Paulsboro Refining Company LLC) Paulsboro, NJ Buckeye Pipeline, Colonial Pipeline, Sunoco / Energy Transfer per research
Pemex Deer Park Refinery (Deer Park Refining Limited Partnership) Deer Park, TX Colonial Pipeline per research
Phillips 66 Lake Charles Refinery (Lake Charles Manufacturing Complex) Westlake, LA Colonial Pipeline per research
Placid Refining Company Port Allen Refinery Port Allen, LA Colonial Pipeline per research
Shell Norco Manufacturing Complex (Norco Refinery) Norco, LA Bengal Pipeline per research
Trainer Refinery (Monroe Energy LLC) Trainer, PA Buckeye Pipeline per research
Valero Houston Refinery Houston, TX Colonial Pipeline, Explorer Pipeline per research
Valero Meraux Refinery Meraux, LA Colonial Pipeline per research
Valero Port Arthur Refinery Port Arthur, TX Colonial Pipeline, Explorer Pipeline per research
Valero St. Charles Refinery (Norco Refinery) Norco, LA Bengal Pipeline per research
Valero Texas City Refinery Texas City, TX Colonial Pipeline per research
Phillips 66 Sweeny Refinery Sweeny, TX Phillips 66 Pipeline inferred (same city)
TotalEnergies Port Arthur Refinery Port Arthur, TX Colonial Pipeline, Explorer Pipeline inferred (same city)
Wood River Refinery Wood River, IL Explorer Pipeline, Phillips 66 Pipeline inferred (same city)

Trade area

people in the trade area · 2025 estimate
325,641
rank of 422 rack markets by people
#266
gallons of gasoline a day · estimate, 2025
316,027
gallons of diesel a day · estimate, 2025
93,616
counties wholly in this market
0
counties shared with other markets
8
An estimate of who lifts here. Each county goes to its nearest rack market with terminals; a market within 1.5 times that distance (or 25 miles more) shares it, up to 4 markets, weighted toward the closer one and the one with more terminals. Distances are straight-line from the county’s centre. Shares of a county always add to 100%, so the people counted across all markets add back to the U.S. total.
County State Share here People counted here Gasoline gal/day Diesel gal/day County population Miles
Allegheny County PA 18% 226,264 199,364 45,888 1,225,035 6
Washington County PA 16% 34,466 45,453 21,379 210,802 23
Butler County PA 16% 32,327 36,834 12,816 200,169 29
Beaver County PA 11% 17,732 17,839 5,509 166,032 18
Lawrence County PA 9% 7,560 7,745 2,985 83,911 36
Ohio County WV 11% 4,588 6,130 4,202 40,496 39
Brooke County WV 6% 1,364 1,789 556 21,142 31
Hancock County WV 5% 1,331 865 280 27,729 25

Fuel demand is an estimate: each state’s taxed gallons for the year (FHWA) are split among its counties by where the driving happens (EPA county vehicle miles, weighted by how much fuel each vehicle type burns), then shared to markets as above. Every state adds back to its FHWA total. Gasoline includes the ethanol blended into it; diesel is FHWA’s special fuels. Expect diesel to be least reliable along long-haul corridors, where trucks buy fuel in one county and burn it in another. Population: U.S. Census Bureau county estimates.

How good is it? Checked in October 2026 against the county retail sales Iowa and California publish: for gasoline, about 3–5% of gallons landed in the wrong rack market and a typical market was within 5–6%. For diesel, 14–21% landed in the wrong market and a typical market was 30–45% off, with truck-stop corridors such as Bakersfield and Stockton under-counted. Treat gasoline as a working estimate and diesel as a rough guide.

Cost to serve this market by pipeline

What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.

Gasoline: product adder

¢/gal · product adder
5.72
¢/gal · line-haul tariff · published
3.38
¢/gal · carrying cost · calculated
0.53
¢/gal · pipeline loss · estimate
0.31
¢/gal · terminaling · estimate
1.50
days financed
10.5

Route used: from Chelsea Jct. on Buckeye Pipeline to NEVILLE ISLAND (FERC No. 442.42.0).

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 3.381 published Buckeye Pipeline FERC No. 442.42.0: Chelsea Jct. → NEVILLE ISLAND (b), 142.00 ¢/bbl
Carrying cost 0.531 calculated $3.120000/gal × 5.9200% ÷ 365 × 10.499 days (2.999 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 288 pipeline miles at 4.0 mph (general estimate)
Pipeline loss 0.312 estimate flat estimate $0.0031/gal, applied 1 time
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 5.724 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (13 of 13). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Terminals Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Chelsea Jct. Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 3.38 0.53 0.31 1.50 5.72 10.5 — FERC No. 442.42.0 effective 2025: check for a newer filing
Booth Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 4.38 0.53 0.31 1.50 6.73 10.5 1.00 FERC No. 442.42.0 effective 2025: check for a newer filing
Eagle Point Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 4.74 0.54 0.31 1.50 7.09 10.7 1.37 FERC No. 442.42.0 effective 2025: check for a newer filing
Paulsboro Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 5.79 0.54 0.31 1.50 8.14 10.6 2.42 FERC No. 442.42.0 effective 2025: check for a newer filing
Linden Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 5.79 0.57 0.31 1.50 8.17 11.2 2.45 FERC No. 442.42.0 effective 2025: check for a newer filing
Findlay starts part-way along the line Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 6.31 0.50 0.31 1.50 8.62 9.8 2.89 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Toledo Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 6.97 0.50 0.31 1.50 9.28 9.8 3.55 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Lima Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 7.39 0.51 0.31 1.50 9.71 10.0 3.98 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Detroit Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 8.60 0.50 0.31 1.50 10.91 9.9 5.19 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Woodhaven Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 8.67 0.50 0.31 1.50 10.98 9.9 5.26 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Point Breeze Sunoco / Energy Transfer, then at Macungie: Buckeye Pipeline two pipelines NEVILLE ISLAND (b) Lucknow Highspire Terminal 8.36 0.68 0.62 1.50 11.16 13.4 5.43 FERC No. 175.36.0 + FERC No. 442.42.0 effective 2025: check for a newer filing
Huntington Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 9.31 0.55 0.31 1.50 11.68 10.9 5.95 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Chicago Complex Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 12.57 0.62 0.31 1.50 15.00 12.2 9.27 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing

Diesel: product adder

¢/gal · product adder
6.20
¢/gal · line-haul tariff · published
3.38
¢/gal · carrying cost · calculated
0.83
¢/gal · pipeline loss · estimate
0.49
¢/gal · terminaling · estimate
1.50
days financed
10.5

Route used: from Chelsea Jct. on Buckeye Pipeline to NEVILLE ISLAND (FERC No. 442.42.0).

How this adder is worked, line by line
Line ¢/gal Basis Source or working
Line-haul tariff 3.381 published Buckeye Pipeline FERC No. 442.42.0: Chelsea Jct. → NEVILLE ISLAND (b), 142.00 ¢/bbl
Carrying cost 0.829 calculated $4.870000/gal × 5.9200% ÷ 365 × 10.499 days (2.999 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 288 pipeline miles at 4.0 mph (general estimate)
Pipeline loss 0.487 estimate flat estimate $0.0049/gal, applied 1 time
Terminaling 1.500 estimate Flat estimate: no fee on file for this terminal
Product adder 6.197 Sum of the lines above, over the origin spot price

Every published route, lowest adder first (13 of 13). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.

Origin Pipeline Delivery point Terminals Line-haul Carrying Loss Terminaling Adder ¢/gal Days Origin must be cheaper by Tariff
Chelsea Jct. Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 3.38 0.83 0.49 1.50 6.20 10.5 — FERC No. 442.42.0 effective 2025: check for a newer filing
Booth Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 4.38 0.83 0.49 1.50 7.20 10.5 1.00 FERC No. 442.42.0 effective 2025: check for a newer filing
Eagle Point Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 4.74 0.84 0.49 1.50 7.57 10.7 1.37 FERC No. 442.42.0 effective 2025: check for a newer filing
Paulsboro Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 5.79 0.84 0.49 1.50 8.62 10.6 2.42 FERC No. 442.42.0 effective 2025: check for a newer filing
Linden Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 5.79 0.88 0.49 1.50 8.66 11.2 2.47 FERC No. 442.42.0 effective 2025: check for a newer filing
Findlay starts part-way along the line Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 6.31 0.77 0.49 1.50 9.07 9.8 2.87 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Toledo Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 6.97 0.78 0.49 1.50 9.73 9.8 3.53 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Lima Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 7.39 0.79 0.49 1.50 10.17 10.0 3.97 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Detroit Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 8.60 0.78 0.49 1.50 11.37 9.9 5.17 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Woodhaven Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 8.67 0.78 0.49 1.50 11.43 9.9 5.24 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Point Breeze Sunoco / Energy Transfer, then at Macungie: Buckeye Pipeline two pipelines NEVILLE ISLAND (b) Lucknow Highspire Terminal 8.36 1.06 0.97 1.50 11.89 13.4 5.69 FERC No. 175.36.0 + FERC No. 442.42.0 effective 2025: check for a newer filing
Huntington Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 9.31 0.86 0.49 1.50 12.16 10.9 5.96 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Chicago Complex Buckeye Pipeline NEVILLE ISLAND (b) Lucknow Highspire Terminal 12.57 0.96 0.49 1.50 15.52 12.2 9.32 FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing
Inputs and assumptions behind these figures
  • Product value (for carrying cost and loss only): the prior day's spot price. Gasoline: OilPriceAPI GASOLINE_RBOB_USD, 2026-10-26. Diesel: OilPriceAPI HEATING_OIL_USD, 2026-10-26. These are the New York Harbor futures benchmarks, not a Gulf Coast price.
  • Interest rate: SOFR 3.92% (2026-10-23) + 2.0 points.
  • Transit (estimate): straight-line miles between the tariff origin and delivery point × 1.15, at 4.0 mph unless the pipeline has its own figure.
  • Days financed (estimate): transit, plus half a 5-day shipping cycle waiting to lift (once for each pipeline on a two-pipeline route), plus 5 days of stock at the terminal.
  • Pipeline loss: the charge or volume deduction the tariff states, where it states one (marked *; a deduction is costed at the product value above). Otherwise an estimate of 0.10% of product value per pipeline, two for a joint rate; that includes pipelines that share out actual losses without publishing a figure, and tariffs that state no loss term.
  • Terminaling: the carrier's terminal charge where its tariff states one (marked *), otherwise a flat 1.5¢/gal estimate.
  • Which route sets the figure: the lowest one that starts at a supply origin. On Colonial that is Houston. A rate that starts part-way along a pipeline, or at a secondary origin, stays in the table but does not set the figure. Where a rate starts at a point another carrier delivers to, the first carrier's lowest rate into that point is added, with its loss and time in the pipe; terminaling is charged once. The same is done where one pipeline files the movement as two rates. Which origins are treated this way is our own review of each system, not a statement in a tariff.
  • Rates used: each pipeline's ordinary filed rate. Committed, volume-tier, discount and bid rates are left out, as are conditional fees (shown on each pipeline page), additives, taxes and the value of line space.
  • Assumption set in force from 2026-10-01; review by 2027-01-01.

Published line-haul rates, all products and rate types

¢/gal · cheapest gasoline · from Chelsea Jct. on Buckeye Pipeline
3.38
¢/gal · cheapest diesel · from Chelsea Jct. on Buckeye Pipeline
3.38
Published line-haul rates into a terminal here, cheapest first (13 of 13 routes). Add the origin spot price for a delivered cost; compare that with the rack price for the netback. Not included: terminal throughput and rack fees, and the 8 conditional tariff fees listed on each pipeline page.
Origin Pipeline Delivery point Product ¢/bbl ¢/gal Refineries at the origin Tariff
Chelsea Jct. Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 142.00 3.38 Trainer Refinery (Monroe Energy LLC) FERC No. 442.42.0
Booth Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 184.14 4.38 FERC No. 442.42.0
Eagle Point Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 199.03 4.74 FERC No. 442.42.0
Macungie Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 215.19 5.12 FERC No. 442.42.0
Linden Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 243.31 5.79 Bayway Refinery (Phillips 66) FERC No. 442.42.0
Paulsboro Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 243.31 5.79 Paulsboro Refinery (Paulsboro Refining Company LLC) FERC No. 442.42.0
Findlay Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 264.97 6.31 FERC No. 446.52.0 item Table 1
Toledo Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 292.69 6.97 Ohio Refining Company Toledo Refinery (formerly BP-Husky); PBF Toledo Refinery FERC No. 446.52.0 item Table 1
Lima Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 310.27 7.39 Cenovus Lima Refinery FERC No. 446.52.0 item Table 1
Detroit Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 361.16 8.60 Marathon Petroleum Detroit Refinery FERC No. 446.52.0 item Table 1
Woodhaven Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 364.07 8.67 FERC No. 446.52.0 item Table 1
Huntington Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 391.15 9.31 FERC No. 446.52.0 item Table 1
Chicago Complex Buckeye Pipeline NEVILLE ISLAND (b) gasoline, distillate 527.93 12.57 FERC No. 446.52.0 item Table 1

Supply resilience

pipeline supply
One pipeline
pipeline systems delivering
1
terminals on two or more pipelines
0
terminals with no pipeline tariff
0

One pipeline system delivers here: Buckeye Pipeline. An outage on it leaves the market to truck, rail or water.

If a pipeline system goes down

Pipeline system Terminals it reaches here With no other pipeline Which
Buckeye Pipeline 1 1 Lucknow Highspire Terminal

Counts pipeline systems with a tariff delivery point here, not capacity, storage or contracts. A system with two lines into the market still counts once, and a terminal with one pipeline may also receive by truck, rail or water. For a refinery or pipeline outage across every market it touches, open that facility’s page.

Delivered ethanol cost

¢/gal over Chicago ethanol · lowest in the market
+6.86
¢/gal over Chicago ethanol · highest
+6.86

An estimate for each terminal: the cheapest of published rail rates and trucking from the nearest plants, plus basis, transload, terminaling and carrying cost. Each terminal page shows the build-up line by line.

Terminal ¢/gal over Chicago By From Miles
Lucknow Highspire Terminal +6.86 truck CE Acquisitions Co LLC (Coshocton, OH) 114

Nearby rack markets

Rack markets within 75 miles (straight line): where a buyer here could also lift.

Rack market Miles Terminals Pipelines
Pittsburgh, PA 3 4 2
Coraopolis, PA 5 3 2
Indianola, PA 13 1 1
Blawnox, PA 15 2 1
Midland, PA 26 3 3
Delmont, PA 27 2 2
Steubenville, OH 29 1 1
Greensburg, PA 33 2 1
Youngstown, OH 52 3 3
Oil City, PA 70 1 —

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.